STATEMENT OF WORK (SOW)
DEFENSE FORENSIC SCIENCE CENTER (DFSC)
DFSC S6 Operations Furniture Part 1
General Information
1. General: This is a non-personnel services contract to provide the demolition, relocation, delivery and installation of office furniture. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide and install all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the installation of the workstations as defined in this Statement of Work except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background: The DFSC S-6 Information Management Branch staff occupies Building 931 located on Gillem Enclave in Forest Park GA. Building 931 was refurbished in a minor construction project in FY14 by the Army Corps of Engineers to provide general administrative office space for the DFSC staff. The present installed furniture requires replacement in concert with an ongoing operation center reconfiguration to reset the workspace to an open space, forward-facing work center providing a fully collaborative work environment.
1.3 Objectives: The DFSC S6 Operations Center will have the required console style workstations installed matching the facility work center redesign.
1.4 Scope: The successful contractor shall provide and install console style in accordance with the scope of work as identified under Part 5, Specific Tasks of this SOW.
1.5 Period of Performance: The period of performance shall not exceed 50 calendar days from the NTP date.
1.6 General Information
1.6.1 Quality Control: The contractor shall engage in an effective quality control program to ensure services are performed in accordance with this PWS. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. A copy of the Contractor’s basic Quality Control Plan shall be provided to the Contracting Officer for approval not later than 10 calendar days after receipt of award. An updated copy shall be provided to the Contracting Officer and COR as changes occur.
1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the quality assurance surveillance plan. These standards primarily focus on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. The standards define how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.3 Recognized Holidays: The contractor is not required to perform services on holidays.
New Year’s Day
Labor Day
Martin Luther King Jr.’s Birthday
Columbus Day
President’s Day
Veteran’s Day
Memorial Day
Thanksgiving Day
Independence Day
Christmas Day
1.6.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0800-1700 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.5 Place of Performance: The work to be performed under this contract will be performed at the Defense Forensic Science Center – Building 931 located on Gillem Enclave, Forest Park GA.
1.6.6 Type of Contract: Mission and Installation Contracting Command, Fort Gordon, GA intends to negotiate/award a firm fixed contract to perform delivery, assembly and installation of the furnishings listed in this SOW. The specific terms of the agreement fall under the quote specifications.
1.6.7 Security Requirements: Contractor personnel performing work under this contract are not required to have a personal security clearance. A DFSC employee (ID card holder) will escort the Contractor providing on-site service at all times.
1.6.7.1 Installation Access: All contractor employees, including subcontractors, shall comply with applicable installation and facility access security policies and procedures at all times. All contractors and subcontractors will be issued an Installation Pass issued through the Automated Installation Entry (AIE) Security System to access the installation. The Gillem Enclave installation is a limited access post. Unscheduled gate closures by the Gillem Enclave security manager may occur at any time. In accordance with Army Regulation 525-13, paragraph 5-19, all prospective contractors will undergo a verification process by the installation Provost Marshal Office, Director of Emergency Services to determine the trustworthiness and suitability prior to being granted access to federal property. This will be accomplished using the National Crime Information Center (NCIC) Interstate Identification Index (III). This is the minimum baseline background check for entrance onto Army Installations for non-CAC holders to include entrance of visitors (Ref AR 190-13, paragraph 8-2). All personnel entering or exiting the installation may experience a delay due to vehicle inspections, registration checks, verification of seat belt use, etc. All vehicles and personnel are subject to search and seizure. The search and seizure provisions shall apply to contractor personnel while within Fort Gordon's area of jurisdiction. Contractor personnel shall comply with all entry control requirements and security policies/procedures in effect. Security procedures may change without notice.
1.6.7.2 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.6.7.3 Key Control: N/A.
1.6.7.4 Lock Combinations. N/A.
1.6.7.5 Training. Contractors may be required to complete Anti-terrorism (AT)/Force Protection (FP)/Operations Security (OPSEC) and IWATCH training prior to arrival or within 30 days of arrival and complete on-going training as needed. The training websites will be listed in the contract cover sheet.
1.6.6 Special Qualifications: None.
1.6.7 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.8 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.9 Key Personnel:
The follow personnel are considered key personnel by the government: Contract manager/Alternate contract manager. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 a.m. to 5:00 p.m, Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.
1.6.10 Identification of Contractor Employees: The Contractor (to include subcontractors) shall provide each employee an Identification (ID) Badge, which includes at a minimum, the Company Name, Employee Name and a color photo of the employee. ID Badges for Key Personnel shall also indicate their job title. ID Badges shall be worn at all times during which the employee is performing work under this contract. Each Contractor (to include subcontractors) employees shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit. The Contractor (to include subcontractors) shall be responsible for collection of ID Badges upon completion of the contract or termination of employee. A listing of issued identification cards shall be furnished to the Contracting Officer prior to the contract performance date and updated as needed to reflect Contractor and Subcontractor personnel changes. All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.6.11 Contractor Travel: Contractor Employee travel and labor expenses will be covered under the terms of the contract.
1.6.12 Other Direct Costs: NA
1.6.13 Data Rights: Not applicable.
1.6.14 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.15 PHASE IN /PHASE OUT PERIOD: NA
1.6.16 Supervision of Contractor Employees: The Government will not exercise any supervision or control over Contractor or subcontractor employees while performing work under the contract. Such employees shall be accountable solely to the Contractor, not the Government. The Contractor, in turn, shall be accountable to the Government for Contractor or subcontractor employees.
1.6.17 Safety. Contractors will be expected to conform to the DFSC requirements for employee safety including, but not limited to, OSHA, post fire safety requirements, general laboratory safety protocols, etc.
PART 2
DEFINITIONS & ACRONYMS
2. Definitions and Acronyms:
2.1 DEFINITIONS:
2.1.1 ASCLD-LAB. American Society of Criminal Laboratory Directors- Laboratory Accreditation Board. The certifying board under which the Forensic Exploitation Directorate maintains certification.
2.1.2 CONTRACT ADMINISTRATOR. The official Government representative delegated authority by the Contracting Officer to administer a contract. This individual is normally a member of the appropriate Contracting/Procurement career field and advises on all technical contractual matters.
2.1.3 CONTRACTOR. A supplier or vendor having a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.4 CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.5 CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.6 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.7 DELIVERABLE. Anything that can be physically delivered but may include non-physical things such as meeting minutes.
2.1.8 Government-Furnished Property (GFP) or Government Property (GP). Property in the position of, or directly acquired by, the Government and subsequently made available to the Contractor.
2.1.9 ISO. Certifying body under which the laboratory has certification.
2.1.10 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.11 N.I.S.T. National Institute of Standards and Technology.
2.1.12 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.13 QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.14 QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.15 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.16 SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.17 WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.18 WORK WEEK. Is defined as Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
AFARS
Army Federal Acquisition Regulation Supplement
AR
Army Regulation
CCE
Contracting Center of Excellence
CFR
Code of Federal Regulations
CMR
Contract Manpower Reporting
CONUS
Continental United States (excludes Alaska and Hawaii)
COR
Contracting Officer Representative
COTS
Commercial-Off-the-Shelf
DA
Department of the Army
DD250
Department of Defense Form 250 (Receiving Report)
DD254
Department of Defense Contract Security Requirement List
DFARS
Defense Federal Acquisition Regulation Supplement
DMDC
Defense Manpower Data Center
DNA
Deoxyribonucleic Acid
DOD
Department of Defense
FAR
Federal Acquisition Regulation
HIPAA
Health Insurance Portability and Accountability Act of 1996
KO
Contracting Officer
OCI
Organizational Conflict of Interest
OCONUS
Outside Continental United States (includes Alaska and Hawaii)
ODC
Other Direct Costs
PIPO
Phase In/Phase Out
PM
Preventative Maintenance
POC
Point of Contact
PRS
Performance Requirements Summary
PWS
Performance Work Statement
QA
Quality Assurance
QAP
Quality Assurance Program
QASP
Quality Assurance Surveillance Plan
QC
Quality Control
QCP
Quality Control Program
TE
Technical Exhibit
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Service: It is anticipated that all work performed will be conducted at the government site.
3.2 Facilities: The Government will provide access to the technical areas which contain the instrumentation in covered and access to any other technical areas required for the performance of the maintenance/repairs required.
3.3 Utilities: The Government will ensure that all utilities in the facility will be available for the contractor’s use in performance of tasks outlined in this PWS. The Contractor (to include subcontractors) shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
3.4 Equipment: The Government will provide access to the existing furnishings necessary to perform the required work.
3.5 Materials: The Government will not provide consumable materials needed in the performance of the required services.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1. General: The Contractor shall provide a Project Manager (PM) who shall be responsible for the performance of the work. The name of this person and alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the contracting officer. The PM or alternate shall have full authority to act for the Contractor on all contract matters relating to daily services as defined in this PWS. Contract manager or alternate shall be available 8:00 a.m. through 4:30 p.m., Monday thru Friday except Federal holidays or when the Government facility is closed for administrative reasons.
4.1.1 The contractor shall provide all necessary trained experienced technical personnel, tools, parts, travel, materials and supplies to perform onsite maintenance and unlimited on-site repair service.
4.1.2 The Contractor shall provide the Contracting Officer and the Contracting Officer’s Representative a list of telephone numbers where the primary service representative may be contacted during normal working hours and for emergency service calls. The Contractor shall have communication services with his/her own Contractor’s service representative, the COR and ACOR at all times.
4.1.3 The contractor shall furnish the Contracting Officer’s Representative (COR) a signed copy of service reports including quality assurance and certification for each instrument per repair and services, showing maintenance performed, listing dates and specific tasks, along with remarks noting any deficiencies found and repaired. The detailed report is due within two (2) weeks after the service visit.
4.2 Secret Facility Clearance: N/A
4.3 Materials: The Contractor shall provide the required parts for installation necessary to perform the tasks (i.e. desks, brackets, screws, etc).
4.4 Equipment: The Contractor shall provide the required equipment necessary to perform the tasks (i.e. hammer, screwdrivers, etc).
PART 5
SPECIFIC TASKS
5. Specific Tasks:
5.1. Basic Services. Provide all labor, materials and equipment to for the demolition and removal of existing cubicle workstations from Room 1304, relocation and reinstallation of four of these workstations in Room 1306B, and the delivery and installation of eighteen new console style workstations in Room 1304 for DFSC BLD 931, located on the Ft. Gillem Enclave, Forest Park GA.
5.2. General Tasks.
5.2.1. Demolition. Demo (16) existing cubicle furniture in Room 1304. Move (4) existing cubicle workstations and reinstall in Room 1306B. Remove and dispose of the remaining (12) cubicle workstations and debris. See Technical Exhibit 1.
5.2.2 Electrical Outlets. Disconnect all electrical circuits connected to each cubicle in Room 1304, placing each under the raised floor.
5.2.2. Installation Services. Deliver and install in Room 1304 (18) single user Line of Sight Console Workstations centrally arranged in (3) forward facing rows of (6) connected desks. Each desktop size should not exceed 43"D x 71"W x 30"H, and be equipped with 3 articulating monitor arms, center end panels, and include desktop ports for cables and power strips. See Technical Exhibit 2.
5.2.3. Power. Leave the power strip cord on workstation counters of the (4) cubicles reinstalled in Room 1306B for future reconnection. The (18) new console workstations in Room 1304 should each include (2) multi-plug grounded power strips with (8) outlets and undercounter cable management trays.
5.3 CONTRACTOR MANAGEMENT REPORTING (CMR): The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor shall completely fill in all the information in the format using the following web address https://Contractormanpower.army.pentagon.mil. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative (COTR) or also known as the Contracting Officer’s Representative (COR); (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including sub-Contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-Contractors); (7) Total payments (including sub-Contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information); (11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor’s system to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website.
PART 6
APPLICABLE PUBLICATIONS
6. Applicable Publications (Current Editions)
6.1. The Contractor must abide by all DoD, Army, CIDC and DFSC applicable regulations, publications, manuals, and policies and procedures when performing all services pursuit to this SOW and contract.
| NUMBER |
| DATE |
| DESCRIPTION |
| MANDATORY |
| AR 200-1 |
| Dec 07 |
| Environmental Protection |
| X |
| AR 385-10 |
| Nov 13 |
| Army Safety Program |
| X |
| EM-385-1-1 |
| Aug 11 |
| Safety and Health Requirements Manual |
| X |
OSHA
| All OSHA guidelines |
| X |
TECHNICAL EXHIBIT 1
Building 931 Diagram
TECHNICAL EXHIBIT 2
Room 1304 Operations Center Diagram
File details come from the government source that posted it.