SOW
| Ver. 2/8/2017 | RESPONSIBLE | |||||||||
| NOT RESPONSIBLE | ||||||||||
| NOT AVAILABLE | ||||||||||
| Project Information (Will populate into Contact Cost tab) | ||||||||||
| NAME: | MISSION COMMAND CENTER- 807 Harrison Dr | MTU | F1-Fiber Ready - All floors (30 Day Activation) | |||||||
| ADDRESS: | 807 Harrison Dr, Fort Leavenworth, KS, 66027 | STU | F3-Fiber in Buiding (60 Day Activation) | |||||||
| LOB: | COAX COMMERCIAL NEW BUILD | TYPE: | STANDARD COAX | NEX | F4-Fiber at Curb (60 Day Activation) | |||||
| DOCKID: | 1581746 | CONST#: | 878482 | SITE SURVEY#: | 3247727 | STREETVIEW | RACK MOUNT | F5-Fiber Port Access Available (60 Day Activation) | ||
| POC: | WALL MOUNT | F6-Fiber in Building - Non Conventional - (90 Day Activation) | ||||||||
| NODE/HUB: | Y9C/LV | MAP: | 2670-1162 | FS-Fiber Serviceable (90 Day Activation) | ||||||
| OU: | KC | YES | FN-Fiber Serviceable NYC/LA (120 Day Activation) | |||||||
| REC'D DATE: | 1/25/18 0:00 | WALKED BY: | Harvala | NO | NS-Non Serviceable (Cold, Off-Net) | |||||
| Serviceability Code | C2-Coax in Building, typically Home Run(30 Day Activation) | B1-Fiber and Coax Ready All Floors (30 Day Activation) | ||||||||
| MTU, STU or NEX | STU | Active Agg Switch-Lateral Drop | B3-Fiber & Coax in Building (60 Day Activation) | |||||||
| BUILD TYPE | STU (Single Tenant Unit) | Colocation | B4-Fiber & Coax at Curb (60 Day Activation) | |||||||
| TENANT COUNT | 1 | Home Run | B5-Fiber Port Access Available & Coax in Bulding (60 Day Act) | |||||||
| LENGTH OF BLDG | 110 | MTU Conv w/Constr | B6-Fiber & Coax in Building NYC & LA (90 Day Activation) | |||||||
| WIDTH OF BLDG | 115 | MTU Conv w/o Constr | C1-Coax Ready All Floors, ROE obtained, Coax to MPOE (30 Day Activation) | |||||||
| NUMBER OF STORIES | 1 | MTU New Build | C2-Coax in Building, typically Home Run(30 Day Activation) | |||||||
| BUILDING EXTERIOR FINISH | Block | NEX (Network Expansion) | C3-Coax in Building, NYC & LA (60 Day Activation) | |||||||
| COMMON MPOE AVAILABLE | yes | Strip Mall | C4-Coax Coil at the Curb (60 Day Activation) | |||||||
| COMMON MPOE LOCATION | Mechanical Room | STU (Single Tenant Unit) | C7-Coax Drop, Serviceable No Construction Required (30 Day Activation) | |||||||
| COMMON MPOE ROOM ACCESS SPECIFICS | mech room in bsmt. Enter from W side outdoor stairway | |||||||||
| PRIVATE NON-MPOE EQUIPMENT LOCATION | ||||||||||
| POWER IS IT AVAILABLE & WHERE | na | |||||||||
| RACK or WALL MOUNT | wall mount | |||||||||
| SPACE AVAILABILTY FOR RACK/WALL MOUNT | yes | |||||||||
| CORES REQUIRED TO ENTER BLDG | no | BUILDING ACCESS | NAME | PHONE # | ||||||
| PREBURY DROP | no | NORMAL BUSINESS HOURS | ||||||||
| FIBER VERIFICATION COMPLETED BY | na | AFTER HOURS | ||||||||
| FIBER VERIFICATION COMPLETE DATE | na | EMERGENCY | ||||||||
| Project Description: Detail from Right Of Way to Interior D-Marc in or at the Venue. | ||||||||||
| *IF MTU, detailed description MUST contain Entire Building Layout, Rack, and Power Locations* | ||||||||||
| 1. From the tie in point in bldg 465. room 009, Comms Closet, enter into the existing conduit. |
2. Back feed and pull coax W 145' to the grass area next to the old Prison wall. Dig up and expose the exisitng conduit and install a pull box.
3. Asphalt bore coax E 19'. Concrete bore coax E 12' to the S side of bldg 465. (4x4 concrete cut and replace section next to the bldg)
4. Attach new EMT 2" conduit between the bldg wall and concrete slab and pull coax 30' E. (Install LB's on both ends)
5. Bore coax E 9', then 25' S to an existing customer pull box.
6. Pull coax 30' W and enter into the Mechanical room. Mount a 2x2 plywood board on the S wall and terminate equipment. Coax end point.
| Detail from Right Of Way to Interior D-Marc in or at the Venue. |
| Insert Field Map |
| *First 3 pages are for field map. Followed by 3 more pages for interior, exterior, rack/wall mount pictures.* |
CHARTER COMMUNICATIONS SCOPE OF WORK
| SOW OVERALL | Detail from Right Of Way to Interior D-Marc in or at the Venue. | |
| DOCK # | 1581746 | Insert Field Map |
CHARTER COMMUNICATIONS SCOPE OF WORK
| SOW OVERALL | Detail from Right Of Way to Interior D-Marc in or at the Venue. | |
| DOCK # | 1581746 | Insert Field Map |
| Insert Exterior & Interior Pictures |
| Include Rack or Wall Mount Pictures |
insert pic here insert pic here
| Tie point in bldg 465, room 009, Comms Closet | Enter existing conduit and back feed coax to the wall | ||
| Dig up and expose the existing conduit and install a pull box. | Asphalt bore coax to the S side of bldg 465 | ||
| insert pic here | insert pic here |
Insert Exterior & Interior Pictures insert pic here insert pic here
| Concrete bore and cut next to the bldg | Install coax in EMT conduit and attach to the bldg | ||
| Coax in EMT on the E end of the fenced in area. | Bore coax E, the S to an existing pull box | ||
| insert pic here | insert pic here |
Insert Exterior & Interior Pictures insert pic here insert pic here
| Enter coax in customer pull box. | Pull coax in customer conduit and enter mech room | ||
| Enter into the bsmt mechanical room | Mount equipment on the W wall. Coax end point | ||
| insert pic here | insert pic here |