About this file
This is an Advertisement for Bids issued by the Pike County Water & Sewerage Authority for the construction of a Filter Backwash Water Treatment facility. The project, designated W&A Project No. W1690-004-01, requires furnishing all labor, materials, and equipment necessary to construct the proposed facility as shown on construction drawings. Construction work includes concrete structures, yard piping, gravel and sand filter media, dichlorination system, and erosion control measures. Sealed bids will be received at 7818 US-19 South, Zebulon, Georgia 30295, until Friday, November 13, 2026, at 11:00 A.M. local time, with bids publicly opened and read at that time. The contract will be awarded as a single contract, and the time allotted for completion is 60 consecutive calendar days to substantial completion, with full project completion and contract close-out required within 74 consecutive calendar days. Bidding documents are available for examination at the Pike County Water & Sewerage Authority office or at Watkins & Associates, LLC, the Office of the Engineer, with digital copies available upon payment of a non-refundable fee of $300.00 (cash or check) or $309.00 (credit/debit card).
All contractors submitting bids must be licensed Utility Contractors by the State of Georgia, with license numbers clearly displayed on the bid envelope. Bid bonds or certified cashier's checks equal to at least 10 percent of the amount bid are required with each bid submission. The successful bidder must furnish Performance and Payment Bonds each equal to 100 percent of the contract amount, with surety companies rated "A" minimum with financial strength of at least five times the contract price. All contractors and subcontractors must register and participate in the E-Verify federal work authorization program and submit the required Affidavit of Compliance with O.C.G.A. 13-10-91. Prequalification may be required prior to contract award. The contract will be funded through ARPA Grant Funds and Local Funds. The Pike County Water & Sewerage Authority reserves the right to reject any or all bids, including nonconforming, nonresponsive, unbalanced, or conditional bids, and reserves the right to waive informalities and re-advertise if deemed in the best interest of the project.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Advertisement for Bids Section 00111
Pike County Water & Sewerage Authority W&A Project No.: W1690-004-01 Filter Backwash Water Treatment 01200-1
PIKE COUNTY WATER & SEWERAGE AUTHORITY
FILTER BACKWASH WATER TREATMENT
ADVERTISEMENT FOR BIDS
PART 1 GENERAL
1.01. COMPETITIVE COST SEALED BIDS
Sealed Bids for the construction of the Filter Backwash Water Treatment will be received, by Pike County Water & Sewerage Authority, at 7818 US-19 South, Zebulon, Georgia 30295, until Friday, November 13, 2026, at 11:00 A.M. local time, at which time the Bids received will be publicly opened and read. No bid may be withdrawn after the closing time for receipt of bids for a period of sixty (60) days.
1.02. CONTRACTOR LICENSE
Any Contractor submitting a bid must be a licensed Utility Contractor by the State of Georgia. License numbers must be written on the face of the bid envelope. No bid will be opened unless the license number is clearly shown. See Instructions to Bidders for additional bidding requirements.
1.03. SCOPE OF WORK
The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Filter Backwash Water Treatment as shown on the construction drawings. In general, construction consists of concrete structures, yard piping, gravel & sand filter media, dichlorination system, erosion control and all associated measures for a complete project. Time allotted for completion of work is 60 consecutive calendar days to substantial completion. Work shall be complete and ready for contract close-out with 74 consecutive calendar days. All work shall be completed in accordance with the plans and specifications. The work will be awarded in one (1) Contract.
1.04. PLANS AND BIDDING DOCUMENTS
Copies of the Bidding Documents may be obtained from Watkins & Associates, LLC, 1606 Whiddon Mill Road, Tifton, Georgia 31793, (229) 388-8823 (Office of the Engineer), upon payment of a non-refundable fee of $300.00 (cash or check) or $309.00 (credit/debit card) for each set. Prospective Bidders may examine the Bidding Documents at the Pike County Water & Sewerage Authority, 7818 US-19 South, Zebulon, Georgia 30295, or at the Office of the Engineer at Watkins & Associates, LLC, Monday through Friday, between the hours of 8:00 a.m. and 5:00 p.m. Upon receipt of the required payment, Watkins & Associates, LLC will transmit the digital Bidding Documents by electronic download link. The date the Bidding Documents are transmitted shall be considered the prospective Bidder's official date of receipt. Partial sets of the Bidding Documents will not be issued. Neither the Owner nor the Engineer will be responsible for the completeness or accuracy of any full or partial sets of the Bidding Documents, including any Addenda, obtained from sources other than those issued by the Office of the Engineer.
Filter Backwash Water Treatment 01200-2
1.05. REQUESTS FOR INFORMATION
Plan holders list, addenda and bid results are available at www.watkinseng.com.
1.06. PREQUALIFICATION OF BIDDERS
Prequalification may be required of Bidders prior to the award of contract. At the Owner’s request, detailed written evidence such as financial data, bonding capacity, previous experience, present commitments, and other such data may be necessary to assist Owner in determining Contractor’s qualifications shall be provided per the Instructions to Bidders contained in the contract documents.
1.07. BONDS
All bid forms must be accompanied by a Bid Bond or a certified cashier’s check in an amount not less than ten percent (10%) of the amount bid. All bonds shall be by a surety company licensed in Georgia with “A” minimum rating performance and financial strength of at least five (5) times the contract price as listed in the most current publication of “Best’s Key Rating Guide Property Liability”. The successful bidder, if awarded the Contract, will be required to furnish a Performance Bond and Payment Bond, each in the amount of one hundred percent (100%) of the Contract amount. All bonds must appear on the Treasury Department's most current Circular 570 Listing. Each Bond shall be accompanied by a “Power of Attorney” authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond.
1.08. PERMITS
All anticipated federal, state, or local permits required for the project have been applied for and are expected to be approved prior to issuance of the Notice to Proceed.
1.09. GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT
All qualifying Contractors and Subcontractors performing work with the Pike County Water & Sewerage Authority must register and participate in the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, to verify the work eligibility information of new employees. In order for a Bid to be considered, it is mandatory that the Bidder’s Affidavit of Compliance with O.C.G.A.
§13-10-91 be completed and submitted with the Bid.
1.10. FUNDING SOURCES
Any Contract or Contracts awarded under this Advertisement for Bids will be funded by a grant from the ARPA Grant Funds & Local Funds.
1.11. RESERVATION OF RIGHTS
Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced, or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent
Filter Backwash Water Treatment 01200-3 standard or criteria established by the Owner. Owner reserves the right to waive informalities and to re-advertise.
Owner: Pike County Water & Sewerage Authority By: Mark Whitley Title: Chairman Date: October 14, 2026
October 28, 2026
END OF SECTION
| PART 1 GENERAL |
| 1.01. COMPETITIVE COST SEALED BIDS |
| 1.02. Contractor license |
| 1.03. SCOPE of work |
| The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Filter Backwash Water Treatment as shown on the construction drawings. In general, construction consists of concrete structures, ya... |
| 1.04. plans and bidding documents |
| 1.05. requests for information |
| 1.06. Prequalification of bidders |
| 1.07. Bonds |
| 1.08. Permits |
| 1.09. georgia security and immigration compliance act affidavit |
| 1.10. funding sources |
| Any Contract or Contracts awarded under this Advertisement for Bids will be funded by a grant from the ARPA Grant Funds & Local Funds. |
1.11. reservation of rights
File details come from the government source that posted it. Updated .