About this file
This is an Advertisement for Bids issued by the City of Guyton, Georgia, in coordination with funding from the Community Development Block Grant (CDBG) Program administered by the Georgia Department of Community Affairs. The project involves drainage improvements for the 2024 Guyton CDBG initiative, requiring the installation of approximately 2,400 linear feet of 18-inch roll-over curb and gutter, 192 linear feet of 30-inch storm pipe, 800 linear feet of 24-inch storm pipe, 1,080 linear feet of 18-inch storm pipe, 18 linear feet of 15-inch storm pipe, headwalls, wingwalls, aprons, grate inlets, curb inlets, yard inlets, pavement replacement, roadway pavement overlay, sediment control, and grassing. Sealed bids will be received until August 19, 2026, at 2:00 PM at the City of Guyton City Hall located at 310 Central Boulevard, Guyton, Georgia 31312, with bids publicly opened and read at that time. The project completion timeline is 150 calendar days. Plans, specifications, and contract documents are available from Parker Engineering, LLC, at 36 Courtland Street, Suite B, Statesboro, Georgia 30458, by phone at (912) 764-7722, or by email at lindsey@parker-engineering.com, for a non-refundable fee of $150.00 per full-size set. No bid may be withdrawn for 60 days after the closing date.
Bidders must submit a bid bond or certified cashier's check equal to at least 10 percent of the base bid, with performance and payment bonds each required at 100 percent of the contract price upon award. The contractor must hold a valid State of Georgia Utility Contractor license and employ a certified Utility Manager to oversee all work. The project is subject to Build America, Buy America Act requirements, mandating that all iron, steel, manufactured products, and construction materials be produced in the United States. The contract is a Section 3 covered contract, and Section 3 Business Concerns are encouraged to apply. Funding sources include the Community Development Block Grant Program and the City of Guyton. Bidders must comply with 41 CFR 60-4 regarding affirmative action and equal opportunity, E-Verify regulations, and all applicable provisions outlined in the Instructions to Bidders. The City of Guyton reserves the right to reject any or all bids and waive informalities.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Guyton – 2024 Guyton CDBG
Technical Specifications
Parker Engineering, Inc. 00100-1 Proj. No. PE24102
SECTION 00100
ADVERTISEMENT FOR BIDS
PART 1. GENERAL
1.1 SEALED BIDS
Sealed bids for construction of 2024 Guyton CDBG will be received until August 19th, 2026, 2 PM at the City of Guyton City Hall at 310 Central Boulevard, Guyton, Georgia 31312 at which time and place they will be publicly opened and read. Any bid received after said time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days.
1.2 SCOPE OF WORK
The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following:
Drainage improvements including, but not limited to, installation of approximately 2,400-LF of 18” roll-over curb and gutter, 192-LF of 30” storm pipe, 800-LF of 24” storm pipe, 1080- LF of 18” storm pipe, 18-LF of 15” storm pipe, headwalls, wingwalls and apron. The project will also consist of grate inlets, curb inlets, yard inlets, pavement replacement, roadway pavement overlay, sediment control, and grassing.
Time allotted for completion of work is one hundred fifty (150) calendar days. All Work shall be completed in accordance with the plans and specifications.
1.3 PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS
Plans, Specifications, and Contract Documents are on file at Parker Engineering, LLC.
Copies may be obtained from Parker Engineering, LLC., 36 Courtland Street, Suite B, Statesboro, Georgia 30458, Phone: (912) 764-7722, Email: lindsey@parker-engineering.com, upon payment of $150.00 for each full-size set (non-refundable).
1.4 CONTRACTOR LICENSE
The Scope of Work as described herein is defined as “utility contracting” in accordance with O.C.G.A 43-14-2(17) so the Contractor performing the work must provide proof of a valid license by the State of Georgia as a “Utility Contractor” and must also employ a “Utility Manager” certification holder who will have oversight of all the work. See Instruction to Bidders for additional bidding requirements.
1.5 BONDS
Bids shall be accompanied by a bid bond or certified cashier’s check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with
City of Guyton – 2024 Guyton CDBG
Technical Specifications
Parker Engineering, Inc. 00100-2 Proj. No. PE24102 an “A” minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of “Best’s Key Rating Guide Property Liability”. Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a “Power of Attorney” authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond.
1.6 FUNDING SOURCES
Funding is to be provided by the Community Development Block Grant Program which is administered by the Georgia Department of Community Affairs. Funding also provided by the City of Guyton. All Bidders must comply with 41 CFR 60-4, in regard to affirmative action, to ensure equal opportunity to females and minorities and will apply the timetables and goals set forth in 41 CFR 60-4, as applicable to the area of the project. This project is a Section 3 covered contract. Section 3 Business Concerns are encouraged to apply.
1.7 BUILD AMERICA, BUY AMERICA BID REQUIREMENTS
This agreement is for services related to a project that is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (“IIJA”), Pub. L. 177-58. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States, as further outlined by the Office of Management and Budget’s Memorandum M-22-11, Initial Implementation Guidance on Application of Buy America Preference in Federal Financial Assistance Programs for Infrastructure, April 18, 2022.
1.8 RESERVATION OF RIGHTS
Owner reserves the right to reject any or all Bids and to waive informalities, including without limitation, the rights to reject any or all nonconforming, non-responsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.
1.9 E-VERIFY
Contractor shall comply with E-Verify regulations.
CITY OF GUYTON
OWNER
END OF SECTION