This document is an Advertisement for Bids for the South Lowndes LAS Phase I - Contract A: Spray Fields Expansion project issued by the Lowndes County Board of Commissioners in Georgia. The project generally consists of constructing an approximately 3,000 LF 24" PVC force main extension, HDPE field piping, valves, fittings, riser assemblies, and sprinklers to add 135 acres of spray field area, as well as installing a 660 LF baffle curtain in the existing Holding Pond. Bids will be received until August 29th, 2024 at 11:00 a.m. at the Lowndes County Administration Building. A mandatory pre-bid conference will be held on August 14th, 2024 at 10:00 a.m. The work must be completed within 180 consecutive calendar days.
The project is funded in part or whole by American Rescue Plan Act Funds through the Governor's Office of Planning & Budget (OPB) State Fiscal Recovery Fund (SFRF) grant program. All bidders must comply with federal affirmative action requirements and existing state public works construction requirements. The owner reserves the right to reject any or all bids. Bidders must provide a bid bond or certified cashier's check in an amount not less than 10% of the base bid, and the successful bidder will be required to provide 100% performance and payment bonds.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 00100-1
ADVERTISEMENT FOR BIDS
SECTION 00100
PART 1. GENERAL
1.1 COMPETITIVE COST SEALED BIDS
Sealed bids for construction of the South Lowndes LAS Phase I - Contract A: Spray Fields Expansion will be received until Thursday, August 29th at 11:00 a.m. at Lowndes County Administration Building, Utilities Department Conference Room, 327 N. Ashley Street, Valdosta, GA 31601, at which time and place they will be publicly opened and read aloud. Any bid received after said time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically may be provided in the Instructions to Bidders and/or by State law.
1.2 SCOPE OF WORK
The work shall generally consist of furnishing all products and performing all labor necessary to perform the following (see Plans and Specifications for complete details and description): Contractor shall construct components related to an expansion of the County's existing South Lowndes Land Application System. Work includes installation of an approximately 3,000 LF of a 24" PVC force main extension and all HDPE field piping, along with all valves, fittings, riser assemblies, and sprinklers to add approximately 135 acres of spray field area. Work also includes installation of an approximately 660 LF baffle curtain in the existing Holding Pond and any other appurtenances necessary to complete the project.
Time allotted for completion of work is 180 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract.
1.3 PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS
Complete digital specifications and contract documents are available at www.cartersloope.com/outforbid. Bidders may view the digital plan documents for free by creating a Quest account and entering the Quest project number 9232709 on the website’s project search page. Bidders can download the digital documents for a fee of
$200 for PDF file payable through the website. Please contact QuestCDN customer support at 952-233-1632 or info@questcdn.com for assistance in membership registration, downloading and working with digital project information. All other questions may be directed to the issuing office, Carter & Sloope, Inc., 6310 Peake Road, Macon, Georgia, 31210, Phone: (478) 477-3923.
1.4 MANDATORY PRE-BID CONFERENCE
A mandatory pre-bid conference for the Project will be held on August 14th, 2024 at 10:00
Lowndes County Board of Commissioners South Lowndes LAS Phase I - Contract A Spray Fields Expansion
C&S Project No.: L8400.069 July 2024
SECTION 00100-2
a.m. at the Lowndes County Administration Building, Utilities Department Conference Room, 327 N. Ashley Street, Valdosta, GA 31601.
1.5 CONTRACTOR LICENSE
The Scope of Work as described herein is defined as “utility contracting” in accordance with O.C.G.A 43-14-2(17) so the Contractor performing the work must provide proof of a valid license by the State of Georgia as a “Utility Contractor” and must also employ a “Utility Manager” certification holder who will have oversight of all utility work. See Instruction to Bidders for additional bidding requirements.
1.6 BONDS
Bids shall be accompanied by a bid bond or certified cashier’s check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an “A” minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of “Best’s Key Rating Guide Property Liability”. Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a “Power of Attorney” authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond.
1.7 PERMITS
All permits required for this project are expected to be acquired prior to construction.
The status of Federal, State, and /or Local permits for this project are as follows:
PERMITS/AGENCIES STATUS
A. Land Disturbance Permit Submitted
B. NPDES GAR 100002 (Stormwater) Submitted
C. GA Environmental Protection Division Submitted
D. USACE Wetlands Permit Not Required
1.8 EASEMENTS & RIGHTS-OF-WAY
All easements and rights-of-way for permanent installations have been obtained or will be obtained by the Owner prior to issuing the Notice to Proceed.
1.9 GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT
All qualifying Contractors and Subcontractors performing work with the Lowndes
County Board of Commissioners must register and participate in the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, to verify the work eligibility information of new employees. In order for a Bid to be considered, it is mandatory that the Bidder’s Affidavit of Compliance with O.C.G.A. §13-10-91 be completed and submitted with the Bid.
Lowndes County Board of Commissioners South Lowndes LAS Phase I - Contract A Spray Fields Expansion
SECTION 00100-3
1.10 FUNDING SOURCES
This project is funded in part or whole by American Rescue Plan Act Funds through the Governor’s Office of Planning & Budget (OPB) State Fiscal Recovery Fund (SFRF) grant program. All Bidders must comply with 41 CFR 60-4, in regard to affirmative action, to ensure equal opportunity to females and minorities and will apply the timetables and goals set forth in 41 CFR 60-4, as applicable to the area of requirements, including those outlined in Appendix II of 2 CFR 200, as well as existing State public works construction requirements. Applicable Federal requirements are included in the contract documents.
1.11 RESERVATION OF RIGHTS
Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.
LOWNDES COUNTY BOARD OF COMMISSIONERS
OWNER
END OF SECTION
Lowndes County Board of Commissioners South Lowndes LAS Phase I - Contract A Spray Fields Expansion