0009-08-033_1125.txt

TXT text file 7 KB Posted

Attached to
STATE LET CONSTRUCTION CONTRACT, HUNT CO, PREVENTIVE MAINTENANCE
Solicitation number
0009-08-033_1125
Issued by
Uvalde County, Texas

About this file

This document is an official state-let construction contract advertisement from the Texas Department of Transportation (TxDOT) for a preventive maintenance project spanning multiple counties including Hunt, Van Zandt, Hopkins, Franklin, Wood, Grayson, Fannin, Delta, and Lamar. The project involves multiple highway segments across State Highway 24, FM roads, and Interstate highways, with a total project control number of 0009-08-033. The contract has a time for completion of 128 working days, with bids to be received and opened on November 5, 2025, at 1:00 PM EST. The estimated project cost is $17,093,993.48, and a guaranty of $100,000.00 is required.

The project has a Disadvantaged Business Enterprise (DBE) goal of 0.0% and is identified with the project number F 2026(108). Bidders are instructed to use the Electronic State Business Daily (ESBD), Electronic Bidding System, and project proposal as the official sources of advertisement and bidding information. The contract covers preventive maintenance across approximately 15-20 distinct highway segments and county road sections, with varying lengths and specific county-to-county connectors. Interested parties can contact Jesse Herrera at the TxDOT Austin HQ for questions, with contact information provided in the document.

Text of this file

******* OFFICIAL ADVERTISEMENT *******

*** STATE LET CONSTRUCTION CONTRACT ***

COUNTY: HUNT, ETC HIGHWAY: SH 24, ETC LENGTH: 0 MI

CONTROL NUMBER: 0009-08-033, ETC DBE GOAL: 0.0%

PROJECT NUMBER: F 2026(108)

TYPE: PREVENTIVE MAINTENANCE

TIME FOR COMPLETION: 128 WORKING DAYS GUARANTY: 100,000.00

BIDS RECEIVED UNTIL: 1:00 PM November 5, 2025 EST.COST: 17,093,993.48 BIDS WILL BE OPENED: 1:00 PM November 5, 2025

MAIL OR DELIVER BIDS TO: FOR QUESTIONS CALL:

TEXAS DEPARTMENT OF TRANSPORTATION JESSE HERRERA

01HOPKINCO

AUSTIN HQ - STASSNEY SULPHUR SPRINGS TX 75482

6230 E STASSNEY LN RM MIC3.02 (903) 438-3155

AUSTIN TX 78744-3147

(512) 416-2498

COUNTY CONTROL LIMITS FROM

HIGHWAY PROJECT LIMITS TO

HUNT 0009-08-033 FM 499

SH 24 F 2026(108) IH 30

LENGTH:

HUNT 1017-04-029 SH 276

FM 751 C 1017-4-29 VAN ZANDT COUNTY LINE

LENGTH:

HOPKINS 0725-01-050 FM 1567

FM 275 C 725-1-50 RAINS COUNTY LINE

LENGTH:

FRANKLIN 0723-01-043 FM 3007

FM 115 C 723-1-43 WOOD COUNTY LINE

LENGTH:

FRANKLIN 1380-01-020 WOOD COUNTY LINE

FM 1448 C 1380-1-20 END OF CONTROL SECTION

LENGTH:

GRAYSON 0045-02-041 SS 129

SH 56 C 45-2-41 3.63 MI W OF SH 289

LENGTH:

FANNIN 2945-02-009 FM 100

FM 2216 C 2945-2-9 LAMAR COUNTY LINE

LENGTH:

DELTA 1203-01-015 FM 1532

FM 904 C 1203-1-15 SH 24

LENGTH:

HUNT 1089-03-012 FM 751

FM 429 C 1089-3-12 KAUFMAN COUNTY LINE

LENGTH:

RED RIVER 1177-01-027 BAKER ST

FM 910 C 1177-1-27 FM 1487

LENGTH:

GRAYSON 0047-18-096 EFR US 69

US 75 F 2026(108) N LOY LAKE ROAD

LENGTH:

LAMAR 0749-01-061 FM 1184

FM 137 C 749-1-61 FM 38

LENGTH:

GRAYSON 0047-18-095 WFR US 69

US 75 C 47-18-95 N LOY LAKE ROAD

LENGTH:

FANNIN 2139-02-013 GRAYSON COUNTY LINE

SH 11 C 2139-2-13 SH 121

LENGTH:

RAINS 0725-02-025 HOPKINS COUNTY LINE

FM 275 C 725-2-25 FM 514 E

LENGTH:

HUNT 2732-01-011 SH 224

FM 2736 C 2732-1-11 SH 24

LENGTH:

GRAYSON 0045-03-057 3.63. MI W OF SH 289

SH 56 C 45-3-57 FM 1417 W

LENGTH:

FRANKLIN 2797-01-021 IH 30

FM 115 C 2797-1-21 FM 3007

LENGTH:

DELTA 1203-03-012 FM 64 (PECAN GAP)

FM 904 C 1203-3-12 FM 2456

LENGTH:

LAMAR 0769-01-031 FM 79

FM 197 C 769-1-31 US 271

LENGTH:

HUNT 0768-01-058 LP 178/SH 11

SH 24 F 2026(108) FM 513

LENGTH:

HUNT 2321-01-018 FM 513

SH 24 F 2026(108) FM 499

LENGTH:

GRAYSON 0047-01-074 STATE LINE

US 69 C 47-1-74 US 69

LENGTH:

HOPKINS 2275-02-006 FM 1567

FM 2081 C 2275-2-6 RAINS COUNTY LINE

LENGTH:

HUNT 1494-01-028 IH 30

FM 1565 C 1494-1-28 KAUFMAN COUNTY LINE

LENGTH:

HOPKINS 2275-01-011 IH 30

FM 2297 C 2275-1-11 FM 1567

LENGTH:

FANNIN 2733-01-008 FM 273

FM 2029 C 2733-1-8 FM 1396

LENGTH:

DELTA 1203-02-010 FM 2456

FM 904 C 1203-2-10 FM 1532

LENGTH:

LAMAR 2945-03-010 FANNIN COUNTY LINE

FM 2216 C 2945-3-10 FM 2352

LENGTH:

FANNIN 0174-03-044 SH 56 (HONEY GROVE)

SH 34 C 174-3-44 SH 50 (LADONIA)

LENGTH:

LAMAR 1452-02-012 US 82

FM 1508 C 1452-2-12 US 271

LENGTH:

GRAYSON 0081-17-002 US 377

SS 129 C 81-17-2 SH 56

LENGTH:

FANNIN 2139-03-024 SH 121 (BONHAM)

SH 11 C 2139-3-24 HUNT C/L

LENGTH:

GRAYSON 0045-18-047 FM 901

US 82 F 2026(108) FM 1417

LENGTH:

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .