00020 Invitation To Bid_McDowell.pdf

PDF 85 KB Posted

Attached to
Request for Doors
Solicitation number
RFP-TAY-190000001568-1
Issued by
Wayne County, Michigan

About this file

This is an Invitation to Bid (ITB) issued by Taylor School District for exterior door replacement at McDowell Elementary School located in Taylor, Michigan. The project involves selective demolition and removal of existing exterior doors, followed by installation of new aluminum doors, hardware, and frames. A pre-bid conference is scheduled for March 28th, 2019, at 2:30 pm in the school lobby, and sealed bids will be accepted until 1:00 pm on April 16th at the district office. The district requires project completion by August 12th, 2019, with an alternate completion option of October 1st, 2019, which would require all work to be performed after school hours and on weekends.

The bid will be evaluated on a lump sum basis, with bidders required to submit bid security equal to 5% of the bid amount. Contractors must also provide 100% surety bonds for performance and payment of labor and materials. Bid documents are available for free download from www.intdesigns.com/planroom starting March 21st, 2019. The Taylor School District reserves the right to reject any or all bids and select the most advantageous proposal. The project is designed by Integrated Designs Inc., located in Brighton, Michigan, and will involve comprehensive exterior door replacement at the elementary school.

View the file

Other files

File Type Posted
McDowell Elementary Door Replacement.pdf PDF
McDowell Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID

00020 - 1

SECTION 00020

INVITATION TO BID

Notice is given hereby that

Taylor School District will accept bids from qualified contractors for renovations to:

McDowell Elementary School, Exterior Door Replacement

22929 Brest, Taylor Taylor, MI 48180 according to Drawings and Specifications prepared by:

Integrated Designs Inc.

8571 W. Grand River Avenue, Suite 600 Brighton, MI 48116

Including, but not limited to: Selective demolition and removal of existing exterior doors. Installation of new exterior aluminum doors, door hardware and frames. Inclusive of all labor and material.

A pre-bid conference will be held starting at 2:30 pm, Thursday, March 28th, 2019 at, McDowell Elementary School, 22929 Brest, Taylor, MI 48180. School Lobby.

Sealed bids will be received at the office of the Taylor School District, 23033 Northline Road, Taylor, MI 48180, until 1:00 pm, Tuesday, April 16th. At that time, bids will be publicly opened. Bids received after the date and time specified will be returned to the bidder, unopened.

The District is looking for the Contractor to fully complete the installation no later than August 12, 2019.

An alternate to be included for completion time of October 1st, 2019, which will require all work including demolition and installation to be after school hours and weekends.

Bids will be taken on a lump sum basis as defined on the Bid Form. Bids shall be accompanied by bid security equal to 5% of the bid amount.

100% Surety Bonds for performance and payment of labor and materials are required. Bonds must be submitted on forms acceptable to the Taylor School District.

Bid Documents will be available after noon, on Wednesday March 21st at www.intdesigns.com/planroom, where you can view and download both drawings and specifications for this project at no cost.

The Owner reserves the right to reject any or all bids and to waive irregularity in the bidding or the bidding process and accept the bid that is most advantageous to the Owner.

Dated: 3-21-19 By: Taylor School District

END OF SECTION

File details come from the government source that posted it. Updated .