This is an Exhibit 3 Specifications document for the Oregon Department of Transportation (ODOT) ESB - OR22E Brush Spraying project. The work consists of spot and fence line brush spraying along Highway 162 (OR22E) at milepost 5-19 in both eastbound and westbound directions, targeting blackberries, Scotch Broom, and woody material with a maximum diameter at breast height of 4 inches. The spraying area extends from the highway shoulder to the right-of-way fencing. Work may commence on September 8, 2026, and must be completed by October 16, 2026. All work must be performed between 7:00 am and 7:00 pm, Monday through Friday, with no work permitted on weekends or state-observed holidays. The project manager is Cody Stone, PE (503-953-6334), and the resident project representative is David Anderson, Transportation Maintenance and Operation Manager - Salem Crew (503-930-3099).

Approved herbicide chemicals for this project include Escort XP, Garlon 3A, and Superspread, or approved equal products. Payment is structured on three bid items: mobilization, pollution control plan, and herbicide application on a highway mile basis, with all costs for labor, equipment, materials, supervision, removal, and disposal included in the quoted prices. The contractor must be licensed and certified by the State of Oregon as a herbicide applicator and maintain current certifications throughout the contract term. All work is subject to inspection and acceptance by the project manager prior to payment issuance. Removed materials become the property of the contractor at the point of removal and must be disposed of satisfactorily. No traffic control is required as all work occurs on the highway shoulder. The contractor must comply with ODOT's Maintenance Guide, Water Quality and Habitat Guide Best Management Practices, Integrated Vegetation Management plan, and all applicable state guidelines.

View the file

Other files

File Type Posted
00017547 Addendum 1.docx DOCX document
00017541 ESB RFCQ 279B.docx DOCX document
00017541 ESB SampleContract279B.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 3

SPECIFICATIONS

ESB – OR22E MP5-19 Brush Spraying OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION. The 2024 Oregon Standard Specifications for Construction (“Standard Specifications”) include detailed specifications in Part 00200 and beyond (“technical specifications”) that apply to this Project. Some sections of the technical specifications may be identified and modified in the Contract Documents. Sections of the technical specifications not identified in the Contract Documents remain applicable to the Contract according to their original terms.

Sections 00120-00199 in Part 00100 of the Standard Specifications are not applicable to the Contract unless they are specifically identified in a Contract Document as being applicable. However, if a section in Part 00100, Section 00120—00199, that has been identified as being applicable references another section in Part 00100, or if a technical specification references a section from Part 00100, that section from Part 00100 applies to the Contract for purposes of supporting and giving full effect to the specification that referenced it. Abbreviations, definitions, and conventions in Part 00100, Section 00110, apply to the ITB and any resulting Contract as required for context within the Contract Document. The Standard Specifications can be accessed online at:

http://www.oregon.gov/ODOT/Business/Pages/Standard_Specifications.aspx

SPECIAL PROVISIONS

The special provisions below identify and modify certain sections of the Standard Specifications.

All number references in the special provisions shall be understood to refer to the sections and subsections of the Standard Specifications bearing like numbers.

1. PROJECT MANAGER:

Cody Stone, PE 455 Airport Road SE, Bldg E

Salem, OR 97301

Cell: 503-953-6334

Cody.Stone@ODOT.Oregon.gov

2. RESIDENT PROJECT REPRESENATIVE

David Anderson

Transportation Maintenance and Operation Manager – Salem Crew

Cell: 503-930-3099 David.Anderson@ODOT.Oregon.gov

3. WORK SCHEDULE:

Contractor must perform all work under the Contract during the hours of 7:00 am and 7:00 pm Mondays through Fridays. No work may be performed on weekends or state-observed holidays per the Standard Specifications.

4. MATERIALS:

Herbicide chemicals to be the following for targeting Blackberries, Scotch Broom, and woody material with a maximum diameter at breast height (DBH) of 4 inches:

· Escort XP

· Garlon 3A

· Superspread

· Or approved equal

5. DESCRIPTION OF WORK:

The work to be completed under this Contract consists of the following:

1. Contact David Anderson for project specific questions.

2. Perform spot and fence line brush spraying along OR22E (Highway 162) from MP5-19 Eastbound and Westbound directions. Width limits are from the shoulder of the highway (edge of pavement) to the ROW fencing, including blackberries and brush in the fenceline.

3. Work may begin on September 8th, 2026, and must be complete by October 16th, 2026.

6. TRAFFIC CONTROL:

All work is expected to occur on the shoulder, so no traffic control is required.

7. SPECIAL PROVISIONS:

Contractor shall comply with Sections 00210, of the Oregon Standard Specifications for Construction.

1. Contractor shall follow all Federal and State requirements.

2. Removed materials will become the property of Contractor at the point of removal and must be disposed of in a manner satisfactory to the Project Manager.

3. Payment will only be made for Mobilization, a Pollution Control Plan, and Herbicide application.

a. Mobilization shall be paid according to 00210.90.

b. Pollution Control shall be paid according to 00290.90.

c. Herbicide Application shall be paid on the highway mile basis.

d. Payment for bid items will include all labor, equipment, materials, traffic control, mobilization, supervision, brush spraying, removal, and disposal, and any other costs incidental to the work.

4. Completed work will be inspected and must be accepted by the Project Manager prior to any payment being issued.

5. Protect all materials left on state property or right of way. ODOT is not responsible for any loss, stolen, or damaged equipment or materials.

6. Contractor shall be an Herbicide Applicator who is licensed and certified by the State of Oregon to perform the necessary spraying activities under this Agreement. All licenses shall be kept current throughout the life of this Agreement.

7. The contractor shall only apply chemicals that are approved by the Project Manager.

8. The contractor shall follow ODOT’s Maintenance Guide and Water Quality and Habitat Guide Best Management Practices (Blue Book), Integrated Vegetation Management (IVM) plan, and all other applicable State guidelines and procedures for maintenance activities.