This is a Material Source Narrative document issued by the Oregon Department of Transportation (ODOT) Region 4 Project Delivery office in Bend, Oregon, dated December 1, 2025, concerning the Identifier Quarry chip seal aggregate production project in Wasco County. The project requires the production of approximately 8,000 cubic yards of Graded Medium chip seal aggregate through excavation, processing, and stockpiling activities at an ODOT-owned quarry located at milepost 61.74 on US Highway 97. The contractor must conduct all production activities during daylight hours, Monday through Saturday. Contractors are required to carefully examine all available information regarding the material source prior to bid submittal, including site conditions, geological characteristics, and existing development plans. The excavation area contains adequate material to complete the project while also preparing the quarry for future development.

The Identifier Quarry is mapped as Tcr, Grande Ronde Basalt formation, a component of the Miocene Columbia River Basalt Group. Site exploration conducted in November 2017 included four drill holes with rock core samples sent to the ODOT Materials Laboratory, confirming the material is acceptable for use as ACP aggregate; laboratory test results are included in the documentation. The contractor must use and process all material meeting quality requirements from the excavation area, with the exception of 20 cubic yards of material with a maximum dimension of 2.5 feet. Blasting operations require a blasting plan submitted 14 days prior to work, written notification to the Project Manager and nearby property owners at least 48 hours in advance, and a blasting report submitted within 48 hours post-blast. The site has been used since 1938 for material extraction, with recent projects in 2019 and 2024 removing 11,000 and 7,600 cubic yards of chip aggregate respectively.

View the file

Other files

File Type Posted
00016021 Exhibit 4 Plans.pdf PDF
00016021 ESB RFCQ 279B.docx DOCX document
00016021 Addendum1.docx DOCX document
00016021 ESB Sample Contract 279B.docx DOCX document
00016021 Exhibit 3 Specifications.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Transportation Region 4 Project Delivery 63055 N Hwy 97, Bldg M

Bend, OR 97701 Phone: (541) 388-6225

Fax: (541) 385-0476

DATE: December 1, 2025

TO: Dan Shanahan

District 9 Manager

Scott Peters District 9 East – Operations & Maintenance Manager

Ramon Alonso Maintenance Operations Liaison

FROM: Scott Billings, C.E.G.

Region 4 Engineering Geologist

REVIEWED: Russ Frost, C.E.G.

Region 4 Geo/Environmental Manager

SUBJECT: District 9 Chip Seal Aggregate Production

RE: Material Source Narrative

Identifier Quarry ODOT Source #OR-33-053-4

DOGAMI #33-0024

US97 (#042), MP 61.74

Wasco County

This memo and attachments should be duplicated and distributed to all bidders that inquire about this material source, as per Section 00120.25 of the Oregon Standard Specifications for Construction, 2024 ed. This material source is an ODOT owned source of aggregate materials.

For this project, the Identifier Quarry is being offered as a Prospective source for the production of chip aggregate material, including excavation, processing and stockpiling of the aggregate material. Aggregate production activities are limited to daylight hours Monday through Saturday.

The prospective material source is an existing rock quarry known as Identifier Quarry and is located in the SW¼ SW¼ NW¼ of Section 5 and the S½ NE¼ of Section 6, T. 7 S., R. 16 E., December 1, 2025 Page | 2

W.M., in Wasco County. This site is located at MP 61.74 on US97 (Hwy #042). Access to the site is adjacent south to the highway.

The current development plan for this source was prepared based upon the estimate of the current project requiring approximately 8,000 cubic yards of Graded Medium chip seal aggregate. The excavation area shown on the plan sheets GE01 and GE02 within the Contract plans contains adequate material necessary to complete the project with the above proposed quantity. The excavation area was also designed to prepare the quarry for future projects.

As per Oregon Standard Specifications for Construction, Section 00120.15 Examination of Work Site and Solicitation Documents; Consideration of Conditions to be Encountered, Contractors shall carefully examine the available information for the material source, and become familiar with the existing conditions, the appearance of the site, and the conditions they expect to encounter prior to bid submittal.

Source Geology Identifier Quarry is mapped as Tcr, Grande Ronde Basalt formation.1 The Grande Ronde Basalt formation is one of the four main formations that comprise the Miocene Columbia River Basalt Group that forms the Deschutes-Columbia Plateau physiographic province. 2

Site Exploration Three of the four drill holes that were completed in November of 2017 are within the proposed and future excavation areas, where rock samples were collected for laboratory testing. The drill logs and core photos are attached to this narrative. Drill hole locations are shown on plan sheet GE01 within the Contract plans. Rock core samples collected from the drilling were sent to the ODOT Materials Laboratory for aggregate compliance testing. The laboratory testing confirmed that the rock sampled is acceptable for use as ACP aggregate. Laboratory test results are attached.

Current Project-Specific Design The strategy for operations is to extend or develop access to the top of the quarry as shown.

The Contractor should use overburden stripped from the excavation area to construct and maintain the safety berms. If inadequate overburden exists, loose material from within the site can be used to enhance the safety berms.

Excavation and design strategy is to continue to move the existing quarry face to the east – southeast, maintaining a constant pit floor elevation. The excavation plan is to excavate full width across the face and moving southeast to obtain the required quantity.

1Walker, George W. and MacLeod, Norman S., Geologic Map of Oregon, United States Geologic Survey, Denver, CO, 1991.

2Orr, E.L., W.N. Orr, and E.M. Baldwin. 2000. Geology of Oregon, 5th ed.

Kendall/Hunt Publishing Company, Dubuque, Iowa, p 157.

December 1, 2025 Page | 3

The operating special provisions in Section 00235 require the Contractor to use and process all material meeting quality requirements whether existing or loosened in the excavation area including oversize materials, with the exception of 20 cubic yards of material with a maximum dimension of 2.5 feet. This quarry does not have a history of producing oversize material, but special consideration should always be given to the preparation of the bid, taking into account the need to reduce all oversize material to a usable size. Special equipment or equipment setup may be necessary for size reduction of the existing or loosened and excavated material.

This operating plan will allow for removal of the required material to produce aggregate products for this project and leave the site in a condition that will allow for systematic development in the future. It is important that access to the top of excavated slopes be constructed properly and be maintained. The quarry floor must be left in a uniform and reasonably smooth and level condition.

Blasting Blasting specifications are described in Section 00235 of the Special Provisions and 00335 of the Standard Specifications. These specifications include providing the Project Manager with a blasting plan for review 14 days prior to drilling and blasting work. Written notification of blasting dates and times are to be provided to the Project Manager and nearby property owners and residences at least 48 hours in advance and again the day of the blast. A blasting report must also be submitted detailing the blast outcome within 48 hours of the blast.

Source Use History This ODOT-owned site was originally acquired in 1938 as a material source. Since acquiring ownership, the state has removed material from Identifier Quarry for ODOT maintenance projects and STIP construction projects. Example uses at the site include:

• 1979: 17,400 cy for the Shaniko - US 197 Junction preservation project

• 1992: 12,000 cy for the Shaniko – South Junction preservation project

• 1998: 23,135 cy for the Shaniko – US 197 S. Junction Section preservation project

• 2008: 10,000 cy for pit run for Maintenance use.

• 2019: 11,000 cy for chip aggregate for Maintenance use.

• 2024: 7,600 cy for chip aggregate for Maintenance use.

Additional Information Documentation contained within this Material Source Narrative Packet is for informational purposes only. If additional information about the material source is desired, contact the Project Manager’s office. An appointment will be scheduled to view ODOT material source files and available core. Someone from the Geology staff must be present when the information is being reviewed; this is to assure accuracy and consistency in the distribution of information.

Attachments:

1. Wasco County Land Use

2. Drill Logs and Core Photos

3. Laboratory Analytical Testing Results

Identifier Quarry Core Photos

DH17-01 0.0 to 10.0 feet. DH17-01 10.0 to 20.8 feet.

DH17-01 20.8 to 29.0 feet. DH17-01 29.0 to 36.7 feet.

DH17-01 36.7 to 45.0 feet. DH17-01 45.0 to 50.0 feet.

DH17-02 0.0 to 12.7 feet. DH17-02 12.7 to 20.5 feet.

DH17-02 20.5 to 28.5 feet. DH17-02 28.5 to 36.3 feet.

DH17-02 36.3 to 44.0 feet. DH17-02 44.0 to 49.6 feet.

DH17-03 0.0 to 12.0 feet. DH17-03 12.0 to 20.5 feet.

DH17-03 20.5 to 29.0 feet. DH17-03 29.0 to 37.5 feet.

DH17-03 37.5 to 45.2 feet. DH17-03 45.2 to 50.0 feet.

DH17-04 0.0 to 12.2 feet. DH17-04 12.2 to 20.0 feet.

DH17-04 20.0 to 27.5 feet. DH17-04 27.5 to 35.0 feet.

DH17-04 35.0 to 44.0 feet. DH17-04 44.0 to 50.0 feet.