RFQ Summary
This Request for Quotes (RFQ) No. S-73000-00015263 is issued by the Oregon Department of Transportation (ODOT) for a Cloud Solutions Provider to supply a Software-as-a-Service (SaaS) Information Technology Service Management (ITSM) Platform to replace the agency's current BMC Remedy 8.1.02 system. The procurement is open to holders of Master Service Agreements (MSAs) with seven identified vendors: A&T, CDWG, Carahsoft Technology Corp, Lumen, SHI, Smartronix, and Strategic Communications. The solution must provide incident management, asset management, service request management, and reporting capabilities, with potential expansion to knowledge management, change management, and service level management. ODOT anticipates approximately 5,000 employees requiring system access, including 252 IT personnel with varying access levels. The offer due date is October 29, 2026, at 1:00 PM. The initial contract term runs for two years following final acceptance of implementation, with options to renew, and includes implementation through go-live and ongoing maintenance and operations support. The anticipated implementation completion date is no later than six months after receipt of Notice to Proceed.
Offerors must submit detailed pricing structured in Attachment E, including deliverable-based costs for each task outlined in the Statement of Work (Attachment A) and subscription, maintenance, and operations support pricing for five years. The pricing scenario in Attachment C specifies varying user counts across modules and years; for example, Asset Management ranges from 5 administrators and 40 users in Year 1 to 10 administrators and 75 users in Years 3–5, with similar escalations across other modules. Offerors must also demonstrate compliance with Oregon's Statewide Information Technology Control Standards requiring NIST SP 800-53 "Moderate" security controls or higher, provide proof of GovRAMP authorization if available, and confirm compliance with DAS Statewide Policy 107-004-052 regarding restrictions on offshore and foreign services. The RFQ emphasizes data security, requiring encryption in transit and at rest, data retention within the continental United States, frequent automated backups, and audit logging. Submissions are scored on 200 total points across three categories: Suitability of Product to Agency Requirements (130 points), Proposer's Ability to Deliver (40 points), and Software Demonstration (30 points), with award determination also considering best value factors including platform features, ongoing costs, and execution capability.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00015263 Q and A 1 Final.docx | DOCX document | |
| 00015263 Addendum 4.docx | DOCX document | |
| 00015263 Addendum 1.docx | DOCX document | |
| 00015263 Purchase Order Sample.docx | DOCX document | |
| Proposer Information and Certification Sheet.doc | DOC document | |
| 00015263 Addendum 3.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTES (“RFQ”) No. S-73000-00015263 Cloud Solutions Providers SaaS ITSM Platform Replacement
Issue Date: 9/15/2026
Issued to:
| MSA Holder Name | MSA # | Contact | |
| A&T | |||
| 8352 | |||
| Brian.Zernhelt@ats.com |
| CDWG |
| 9414 |
| CDWG-PremiumPages@cdw.com |
| Carahsoft Technology Corp |
| 9412 |
| NASPO@Carahsoft.com |
| Lumen |
| 8355 |
| Dean.Faith@lumen.com |
| SHI |
| 9404 |
| TeamOregon@SHI.com |
| Smartronix |
| 8354 |
| jobrien@smartronix.com |
| Strategic Communications |
| 9413 |
| NASPO@yoursstrategic.com |
RFQ Single Point of Contact (“SPC”): Joni Sirovatka
| Address: | 1327 SE 3rd Street | |
| Pendleton, OR 97801 | ||
| Phone: | (541) 207-7265 | |
| E-mail: | joni.a.sirovatka@odot.oregon.gov |
OFFER DUE DATE AND TIME: October 29, 2026, 1:00 PM
Introduction
The Oregon Department of Transportation (“Agency”) is issuing this RFQ to procure a solution for the replacement of Agency’s current Information Technology Service Management (“ITSM”) software. The new software platform must be capable of providing Agency required ITSM functions as described in the requirements detailed in this document.
The selected Offeror must be able to migrate Agency from BMC Remedy 8.1.02 to the new Offeror provided software (the “System”) as described in this RFQ, including all required configurations, licenses, portals, training, documentation, project management, maintenance and operations support.
Agency is seeking a SaaS solution. For the purposes of this RFQ, SaaS refers to a subscription-based services model that can be configured to the needs of the State delivered via a cloud instance configured for access and use by Agency.
Additional details on the Scope of the Services are included in Section 4, Scope of Services, Deliverables.
Agency anticipates the award of one (1) Contract from this RFQ. The initial term of the Contract will be from the date the Contract becomes effective to two (2) years after Final Acceptance of the Implementation with options to renew, and will include the implementation through Go Live and ongoing Maintenance & Operations Support.
Authorized Purchaser Overview and Background Information Agency’s current ITSM system is primarily utilized to manage its information technology (“IT”) assets and to track service desk calls, emails, and requests. In addition to incident, request, and asset management, Agency also utilizes a service catalog for internal personnel to submit incidents and requests.
a) High-Level Description of the Current System:
1) Incident Management (tracking service disruptions or break-fix events)
2) Asset Management (tracking IT asset purchases and lifecycle)
3) Service Request Management (submission of incidents and requests with Level 1 & Level 2 support)
4) Reporting Console (able to report on all data contained within the ITSM system)
5) Knowledge Management (testing completed, but not in use)
6) Change Management (testing completed, but not in use)
7) Service Level Management (testing completed, but not in use)
b) High-Level Description of the Desired System ODOT is seeking a cloud-based Software-as-a-Service (“SaaS”) offering to provide ITSM services and capabilities. At initial implementation, the desired system must replace items 1 – 4 in the preceding section and it must have the capability of expanding to include items 5 – 7 in the preceding section. ODOT has approximately 5,000 employees who will require access to the system for Request and Incident submission. Of the 5,000 there are approximately 252 IT personnel who will require varying levels of access to the different components, modules and functions within the ITSM system. The following is a rough breakdown of IT roles:
1) Service desk: 16 users
2) Asset management: 4 users
3) Administrative: 2 users
4) Resolver groups: 230 users
Definitions and Clarifications
Terminology specific to the OregonBuys® system may be found at: OregonBuys For the purposes of this RFQ, the following definitions and clarifications apply:
References to “AI” (Artificial Intelligence). Agency recognizes that AI features may be used in the delivery of System features. Agency is required to evaluate AI on a multitude of factors, including the data sources, audience, decision-making, and safety and ethics implications, among others. Any System component that depends on AI should be called out as such in the Response to this Request.
“Configuration” means the process of arranging and adjusting the settings of software to meet specific needs using built-in tools, without writing new code.
“Customization” means the process of modifying software to meet a specific need using coding specific to Agency’s implementation to add, remove, or adapt features beyond the standard settings.
“Low code/no code” means a system that provides for configuration of system behaviors, e.g. workflow creation, without relying on Customization.
“Platform” means the infrastructure on which the System resides, including the data center, servers, and other components.
Offeror Requirements The Agency seeks an Offeror who can:
· Provide and license to Agency use of a System that meets the requirements detailed in Attachment B - Solution Requirements
· Provide both management of the platform and maintenance of the System on behalf of Agency
· Deliver the implementation project including the elements detailed in Attachment A - Statement of Work
· Demonstrate significant experience with similar projects of a similar size
· Demonstrate a proven track record of support and reliability
System Requirements
The detailed System Requirements for the System are found in Attachment B. Offeror must review and detail how its proposed System meets each item in Attachment B.
A high-level list of the System functionality is as follows:
A Software-as-a-Service solution with the following ITSM functionality:
1. Enterprise integration for authentication and data management
2. Ease of Administration and Configuration
3. Incident Management
4. Asset Management
5. Service Request Management
6. Knowledge Management
7. Problem Management
8. Robust reporting
RFQ Requirements
The RFQ and attachments are published in the State of Oregon’s electronic procurement system, OregonBuys® at https://oregonbuys.gov/ for the holders of PAs only. Documents will not be mailed to the holders of PAs. Modifications, if any, to this RFQ will be made by written Amendment(s) published in OregonBuys®. Prospective Offeror is solely responsible for checking OregonBuys® to determine whether or not any Amendment(s) have been issued. Amendment(s) are incorporated into the RFQ by this reference.
All questions and requests for clarification regarding this RFQ must be submitted in writing by e-mail to the Authorized Representative and must be received no later than January 26, 2026 at 9:00 AM PT. All questions received from all Offerors within the time allotment will be responded to. Responses will be provided via OregonBuys® as soon as possible.
Authorized Purchaser may issue revisions, substitutions or clarifications of the RFQ. Authorized Purchaser will send revisions, substitutions or clarifications, if any, electronically to the above referenced PA Holders via OregonBuys®.
Offer Submittal
Offeror must complete and submit their offer via upload to OregonBuys. Offers must be received on or before the Offer Due Date and Time identified above to be considered. Agency, in its sole discretion, may extend the Offer Due Date and Time.
Offers will not be accepted after the Offer Due Date and Time.
Submittal Requirements
Offerors must provide:
a. A sample Project Plan covering work similar in scope to Attachment A
· This Project Plan is to demonstrate the Offeror’s experience with similar projects, either by providing the Project Plan from a previous project or the Offeror’s standard Project Plan for similar deployments. It does not need to address Attachment A point-for-point, but does need to encompass a full implementation project for the System.
b. A detailed description of the System capabilities that demonstrate it matches the requirements as described in Attachment B
c. Detailed information about the licensing cost structure per Attachment C.
d. A description of Offeror’s Key Persons, other staff, and their experience. Key persons, other staff, and any personnel or subcontractors are required to pass appropriate background checks and comply with any relevant security policies to support the System or provide implementation services.
e. A description of past projects Offeror has completed that are similar in scope to what is being requested in this RFQ. “Similar in scope” means the project implemented the same platform to an organization and delivered a comparable set of services.
f. 3 references using the Reference Check Form (Attachment D). Forms must be completed by the reference, returned to the Offeror and submitted with the quote. References should be from customers for whom Offeror has performed similar projects within the past five (5) years. Agency may elect to follow up with References. Comment by Jack McDonald: This RFQ uses both Attachment [Letter] and Exhibit [Number} scheme for the documents. I converted all to use “Attachment”. Feel free to convert all to Exhibit, if ODOT prefers, but choose one or the other.
g. Submission of the Pricing Sheet (Attachment E) as a separate document. The Pricing Sheet must include:
· Deliverable-based pricing for each deliverable outlined in Attachment A - Statement of Work
· Pricing for 5 years of continued Maintenance and Operations Support of the system, including subscription costs and hosting.
· Pricing for additional consulting work associated with System modification
h. Offeror shall submit a statement addressing its capacity to meet State information security requirements. The statement must reflect the information indicated in this section, and clearly demonstrate that if awarded a Contract: Comment by SIROVATKA Joni A: Jason and Rupali - I reformatted what CSS had here so it would fit in to the list. If that is not ok please let me know.
1. Offeror and Offeror's staff monitoring its systems who will have access to State systems, facilities, and confidential information shall submit to all security checks requested by the State, which may include any combination of fingerprinting, Oregon Law Enforcement Data Systems (“LEDS”) and Federal Bureau of Investigation Criminal Justice Information Services (“FBI CJIS”) background checks.
2. Offeror shall comply with the Statewide Information Technology (IT) Control Standards found online at Enterprise Information Services: Guidance for State Agencies : Cyber Security Services : State of Oregon, specifically:
1. Oregon’s Statewide Information Technology (IT) Control Standards, by ensuring it maintains security controls that meet or exceed “Moderate” security controls in the National Institute of Standards and Technology (“NIST”) Special Publication (SP) 800-53.
1. Oregon’s Statewide Information Technology (IT) Control Standards. Offeror may (but is not required to) provide one of the following to demonstrate compliance with Oregon’s Information Technology Control Standards: Proof of current GovRAMP Authorized status (Ready, Provisionally Authorized, or Authorized) in the form of a GovRAMP Letter, or documentation of a valid GovRAMP Security Snapshot Score.
3. Offeror shall comply with the Statewide Policy on Cyber and Information Security, DAS Statewide Policy 107-004-052, found online at https://www.oregon.gov/das/Pages/policies.aspx#IT, pertaining to State systems and security, including its restrictions on offshore and foreign services.
Offeror’s response to this section must specifically address its capacity to meet the policy’s restriction on offshore and foreign services for the duration of the Contract. State if fully compliant services and personnel are available, and part of Offeror’s quote. If the quote includes optional or necessary offshore or foreign services, Offeror must include in its quote a statement describing:
0. The offshore and/or foreign services that Offeror intends to use to deliver the Solution and Services.
0. Offeror to provide the geographic location of where services are to be performed.
0. The benefit to the State of the offshore and/or foreign services.
0. That Offeror will ensure it has systems and controls in place that will protect Agency Data and the State’s networks in the event offshore or foreign services are allowed, and what systems and controls Offeror expects the State to have in place.
0. What steps Offeror is willing and able to take to fully meet the policy’s restrictions on offshore and foreign resources. Describe any additional steps Agency would be requested to take, and any additional costs Agency may incur if Offeror provided the System and Services using fully compliant services.
4. As necessary, Offeror shall sign a non-disclosure agreement regarding information received or processed on its equipment from the State of Oregon.
5. Offeror shall protect at all times State of Oregon sensitive and confidential information.
6. Any use of Agency Data or information by artificial intelligence systems, including for training of such systems, must be explicitly approved in writing by Agency and adhere to State requirements.
Evaluation and Award
Agency, in its sole discretion, may reject all Offers or cancel this RFQ at any time.
a. Submissions will be reviewed to determine if all Submittal Requirements have been met. Submissions meeting the Submittal Requirements will be deemed Responsive and be considered for evaluation.
b. Submissions will be scored on the following categories, points being weighted as described. Offeror is encouraged to ensure its Offer demonstrates Offeror’s qualifications in these areas:
| Category |
| Subcategory |
| Possible Points |
| 1. Suitability of Product to Agency Requirements |
| 130 |
| General Requirements |
| (30) |
| Ease of Administration and Configuration |
| (50) |
| Specific Module Requirements |
| (40) |
| Product Cost |
| (10) |
| 2. Proposer’s Ability to Deliver |
| 40 |
| Approach and Schedule |
| (10) |
| Expertise |
| (10) |
| Experience |
| (10) |
| Project Cost |
| (10) |
| 3. Software Demonstration |
| 30 |
| Features |
| (30) |
| Total possible points | Comment by MCCARTNEY BJ: I would recommend increasing the points available to provide for more discretion among similar quality Offerors and Systems. | Comment by YOUNG Jason: Agreed. Adjusted. |
| 200 |
In addition to the award of the points in the table above, Agency may take into account other factors to determine which submission is the Best Value to the State including, but not limited to: Comment by Jack McDonald: Is this implying that ODOT is making a “Best Value” determination. How does “Best Value” interact with the pricing points? Could a proposer get most points but another be deemed “best value”?
· Platform features
· Platform ongoing costs
· Ability to execute to Agency’s desired timeline
c. Agency may ask Offeror to participate in additional rounds during the evaluation process, including a demonstration of the System.
d. The Offeror with the most advantageous Offer will be awarded a contract in a form substantially similar to the Purchase Order attached to the PA. Agency is willing to negotiate contract terms and conditions with the successful Offeror, but is not required to make any modifications.
e. Agency may award all or a portion of the Services requested, in its sole discretion.
Protest of Award
a. Protest Submission. An Affected Offeror shall have 7 calendar days from the date of the Intent to Award notice to file a Written protest. An Offeror is an Affected Offeror only if the Offeror would be eligible for Contract award in the event the protest was successful and is protesting for one or more of the following reasons:
· All higher ranked Offers are non-Responsive.
· Agency has failed to conduct an evaluation of Offers in accordance with the criteria or process described in the RFQ.
· Agency abused its discretion in rejecting the protestor’s Offer as non-Responsive.
If Agency receives only one Offer, Agency may dispense with the evaluation process and Intent to Award protest period and proceed with Contract negotiations and award.
b. Protests must:
· Be delivered to the SPC via email
· Reference the RFQ number
· Identify Offeror’s name and contact information
· Be signed by an Authorized Representative of Offeror
· Specify the grounds for the protest
· Be received within 7 calendar days of the Intent to Award notice
c. Response to Protest. Agency will address all protests submitted in accordance with Section 10 within a reasonable time and will issue a Written decision to the respective Offeror. Protests that do not include the required information prescribed in this section may not be considered by Agency.
Attachment A – Sample Statement of Work
PROJECT DESCRIPTION and OVERVIEW of SERVICES
Agency intends to procure a solution for the replacement of Agency’s current ITSM software (the “Project”). The new software platform must be capable of providing Agency required ITSM functions as described in the requirements as detailed in this document.
This scope entails migrating Agency from BMC Remedy to the new System. Offeror shall provide professional services to facilitate a seamless transition, enhance functionality, and ensure operational readiness.
Currently, Agency employs BMC Remedy 8.x (the “Current System”), which has gone out of support as of February 20, 2018.
Agency’s Current System is primarily utilized to manage its information technology (“IT”) assets and to track help desk calls, emails, and requests. In addition to incident and asset management, Agency also utilizes a service catalog for internal personnel to submit incidents and requests.
1. Scope of Services:
Offeror shall provide Agency with dedicated IT professional services resources that will be available throughout the duration of the configuration, implementation, module configuration, testing, and training of the System. Offeror shall collaborate with and assist Agency technical staff with updates and related issues to smoothly transition Agency from its Current System to the System.
2. Definitions:
IT – Information Technology ITSM – Information Technology Service Management SOW – Statement of Work SSO – Single Sign-On
3. Project Management and Administration — Offeror shall designate a project manager to assist the agency in implementing the ITSM software replacement. The project manager's responsibilities shall include but are not limited to conducting a Project kick-off meeting, developing and managing the implementation schedule, overseeing Offeror resources and deliverables, facilitating regular progress meetings, providing periodic Project status reports, and providing recordings of all Project meetings.
4. Technical Documentation — Offeror shall deliver standard technical documentation for the System to Agency, including installation guides, user manuals, and training materials (Tasks 3, 4, 5, 6, 7, 8, 9, 10, 11, and 12). Following the implementation and configuration, Offeror shall update and review the final documentation to ensure it accurately reflects the application's functionalities and aligns with Agency operational environment. Offeror shall confirm that all documentation is comprehensive and suitable for Agency specific needs.
5. Configuration / System Testing – Offeror shall configure System to perform according to agency needs per approved requirements, ensuring all specified functionalities are implemented in alignment with Agency standards (Tasks 3, 4, 6, 7, 8, 9, 10, and 11). Comprehensive system testing, including functional and integration testing, shall be conducted by Offeror to validate configuration accuracy, data integrity, and adherence to security requirements. All testing results shall be documented and presented to Agency for review, validation and approval before the System goes live.
6. Interfaces Configuration – Offeror shall provide comprehensive interface configuration services to configure the installed interfaces. The configuration services shall encompass the following systems:
1. Microsoft Entra ID
2. Microsoft Exchange Server
Offeror shall ensure that all configurations are executed per industry best practices and in alignment with the client's operational requirements (Tasks 3, 4, 6, 7, 8, 9, 10, and 11). Detailed documentation of the interface configuration processes and guidelines will be provided to facilitate ongoing management and future enhancements.
Data Migration – Offeror shall migrate all configuration and policy data from Remedy to new System in alignment with the project scope and timelines. This includes, but is not limited to, Incidents, Service Requests, Purchase Orders and Asset Records. Offeror shall provide a detailed data mapping document to ensure accurate migration of configuration elements, validate migrated data during testing phases, and complete a final migration of all configuration and policy data before go-live. Agency will ensure the accuracy and completeness of all data, provide required subject matter expertise, and validate the accuracy of migrated configuration and data. Final migration shall be considered complete upon Agency approval and sign-off of reconciliation reports confirming data accuracy and readiness for production use. Minimum data needed for System go-live will include but is not limited to:
· Asset records
· Product catalog
· Cost Centers
· People records
· Sites/Building locations
7. Training – Offeror shall provide comprehensive guidance to Agency through a structured product training program. Offeror shall ensure that end users, superusers, and administrators have access to various learning materials, including manuals, online modules, and video tutorials tailored to different user roles. Offeror shall offer continuous access to both formal and informal training sessions. Offeror shall conduct trainings designed for train-the-trainer activities (Task 5). These trainings must equip selected personnel from the Agency with the necessary skills and knowledge to effectively train other users.
8. Production Cutover –Offeror shall deliver comprehensive production support and facilitate the post-live transition to the ITSM team. This includes, but is not limited to, ongoing system monitoring, issue resolution, and user assistance. The duration and scope of this support must be defined under the agreed project timeline and deliverables.
Offeror shall complete all services unless expressly stated otherwise in a particular task. Offeror shall provide all labor, equipment, and materials to manage, coordinate, and complete the work under the performance and delivery schedules identified in this SOW.
The detailed activities and dependencies for each task listed below are in the project schedule. Offeror has completed a task when it has performed all services outlined in the task and Agency has accepted all deliverables for the task.
9. Meetings Meeting agendas are to be provided 2 business days prior to each scheduled meeting. The agenda is to be modified if requested by any participants or, if the agenda is determined to be too long for the scheduled meeting, an additional meeting to cover the additional agenda items is to be scheduled as soon as practical. Meeting minutes are to be provided no more than 3 business days following the meeting (Tasks 1, 2, and 5).
10. Deliverables All Deliverables are to be submitted to Agency Project Manager (“APM”) in either Portable Document Format (“PDF”) or Microsoft Office format. Upon submission of each deliverable, Agency will review and return within 5 business days with any comments, changes, or corrections needed. Offeror shall resubmit the deliverable within 5 business days as a revised submission. Agency will specify if revised submission is accepted or rejected. If rejected, Agency will specify the reason(s) and the desired correction. If a deliverable is rejected, subsequent timelines are to be negotiated by Offeror and Agency. Offeror shall submit all deliverables to Agency as identified in the Project Schedule.
Task 1: Project Kick-Off Task 2: Validate Agency High Level ITSM Requirements Task 3: Prepare Enterprise Cloud Platform Environment Task 4: Configure Microsoft Entra ID SSO Integration Task 5: Conduct system administrator training Task 6: Configure email integration Task 7: Enable Incident Management Task 8: Enable Request Management Task 9: Enable Hardware Asset Management Task 10: Enable Software Asset Management Task 11: Import agency data Task 12: Go-Live
Task 1: Project Kick-Off Offeror shall schedule, coordinate attendees for, and facilitate a Project kick-off meeting (“Kick-Off Meeting”) no later than 10 business days after Agency’s issuance of Notice to Proceed (“NTP”) for the Contract. The Kick-Off Meeting will provide an orientation for the Agency's core project team, which is responsible for decision-making. After this session, the team will understand the implementation process and be prepared to start Project work. Offeror shall conduct the virtual Kick-Off Meeting, which is anticipated to last up to 4 hours, using Microsoft Teams.
The Kick-Off Meeting must including the following topics, at a minimum:
· Offeror team members and their roles.
· Agency team members and their roles.
· Project assumptions, constraints, and escalation processes.
· High level System implementation steps.
· Review of Contract Deliverables and their schedule.
Offeror shall develop and submit a Project Plan. The Project Plan must contain the following minimum elements:
· Work Breakdown Structure (“WBS”), as Task ID, per this SOW
· A Project Schedule with milestones, deadlines, dependencies, and recurring meetings for project management.
· Recurring meetings may be as frequent as often weekly, as needed per task. Frequency, agenda, virtual or in person, and attendees will be determined in coordination with Agency.
· Offeror shall maintain and update the Project Schedule throughout the performance of the Project. Due dates for tasks not yet scheduled must be updated as work gets completed and provided to Agency in each updated Project Schedule.
· Agency intends to reach the Project Implementation Date no later than six months after receipt of NTP from Agency, as negotiated with the successful Offeror.
· Resource allocations for Offeror and Agency teams.
· Risk management strategies with mitigation plans.
· A communication plan specifying meeting frequency in alignment with the Project Schedule.
Task 1 Deliverables Offeror shall submit to APM:
· Deliverable 1.1: Kick-Off Meeting agenda and minutes.
· Deliverable 1.2: Project Plan.
· Deliverable 1.3: Updated Project Schedule as requested by Agency but no less frequent than at the end of each calendar month.
Task 1 Acceptance Criteria This Task is considered complete when:
· Agency has accepted the final version of each deliverable.
Task 2: Validate Agency ITSM Requirements Offeror shall conduct up to 4 workshops with Agency Project team members to review Agency system requirements (“Workshop” or “Workshops” collectively). The Workshops shall discuss gaps between Agency system requirements and Offeror’s System, including details of the interface requirements with Agency applications, and feed into submission of a System Requirements Document to Agency. Offeror shall coordinate and facilitate each Workshop. Workshops are anticipated to be up to 7 hours in length, include up to 5 Agency staff, and be held virtually. Offeror shall provide all Workshop materials to Agency prior to the date of each Workshop.
Workshops must include the following, at minimum:
· Agency business user requirements.
· Requirements gaps between current and new systems.
· Assumptions, risks, current configurations, and Offeror recommendations.
· Describe and document the expected System, business processes, and business rules for all Agency employee groups in scope.
Offeror shall submit to Agency a System Requirements Document that precisely reflects the Agency’s system requirements to implement the new System. The System Requirements Document serves as both the formal scope agreement and the configuration sign-off for the new System implementation. Subsequent tasks include references to the System Requirements Document and opportunities to detail specific module requirements, as needed.
Task 2 Deliverables Offeror shall submit to APM:
· Deliverable 2.1: Workshop materials no later than 5 business days before each Workshop.
· Deliverable 2.2: A Systems Requirements Document, due upon completion but no later than 10 business days after the Workshops are completed.
Task 2 Acceptance Criteria This Task is considered complete when:
· Agency has accepted the final version of each deliverable.
Task 3: Prepare Enterprise Environment Offeror shall prepare the enterprise cloud environment/instance and deploy the latest version of the System to Agency (including test and production (“Test/Prod”)) in accordance with the established requirements, the Project Schedule, and industry best practices. This deployment must include all modules and components of the System that Agency is licensed for and to-be configured in subsequent tasks. Offeror shall:
· Document and submit to Agency the information specific to enabling the enterprise environment. This may include, but is not limited to, URL’s, ports, application ID’s, etc. (Deliverable 3.1).
· Prepare the enterprise environment specific to Agency.
· Develop and deliver test cases to Agency based on Deliverables 2.2 and 3.1 that will demonstrate the readiness of the enterprise environment. These test cases constitute User Acceptance Testing (“UAT”) for this task.
· Compile and report on Agency’s UAT results including details of failed UAT tests.
· Take or coordinate, as appropriate, corrective actions corresponding to failed UAT tests.
Task 3 Deliverables:
Offeror shall submit to APM:
· Deliverable 3.1 ITSM software environment configuration document (Test/Prod).
· Deliverable 3.2 UAT test cases.
· Deliverable 3.3 UAT testing results.
Task 3 Acceptance Criteria This Task is considered complete when:
· Agency has accepted the final version of each deliverable.
Task 4: Configure Microsoft Entra ID Integration Offeror shall enable and configure SSO for Agency in the System (Test/Prod). Offeror shall have dedicated resources available for assisting Agency with configuring SSO in the tenant (Microsoft Entra ID). In addition, Offeror shall configure record import of Agency employee data to support both SSO and daily update of employee data, such as work location and phone number. Offeror shall:
· Assist Agency with configuring SSO in the Agency Government Community Cloud (“GCC”) tenant or Active Directory domain, including documenting technical requirements for Agency systems (Deliverable 4.1).
· Configure SSO in the System.
· Configure synchronization of employee data including documenting technical requirements for Agency systems (Deliverable 4.2).
· Synchronize employee data from Workday and/or Active Directory for automatic creation and updating of employee records, including a report with record counts and exceptions (Deliverable 4.3).
· For each of SSO and employee record updates, Offeror shall:
· Develop and deliver test cases to Agency based on Deliverables 4.1 and 4.2. These test cases constitute UAT for this task.
· Compile and report on Agency’s UAT results including details of failed UAT tests.
· Take or coordinate, as appropriate, corrective actions corresponding to failed UAT tests.
Task 4 Deliverables:
Offeror shall submit to APM:
· Deliverable 4.1 SSO configuration document.
· Deliverable 4.2 Employee Data Synchronization Configuration document.
· Deliverable 4.3 Employee Record Import report.
· Deliverable 4.4 SSO UAT test cases.
· Deliverable 4.5 SSO UAT test results.
· Deliverable 4.6 Employee record update UAT test cases.
· Deliverable 4.7 Employee record update UAT test results.
Task 4 Acceptance Criteria This Task is considered complete when:
· Agency has accepted the final version of each deliverable.
Task 5: Conduct system administrator training Offeror shall provide System Administrator training to Agency. The objectives of the training are to provide knowledge transfer to ensure the Agency is capable of configuring, maintaining, and administering the System post-implementation, and training Agency system users. Offeror shall:
· Meet with Agency to review skill level of System Administrators and mutually determine training approach and submit to Agency customized training course including test scenarios.
· Provide training that addresses, but is not limited to, the following:
· User group creation and role management.
· Configuration and customization of user interface.
· Data management.
· Console/module configuration for Incident, Asset, and Service Request.
· Reporting, KPIs, dashboard creation and reporting.
· Service Catalog and Request creation.
· Any other features Offeror deems critical for effective operation of the System.
· Provide Step-by-step exercises for each of the previous sub-bullets (“System Exercises”).
· Conduct training in live virtual sessions as identified in the updated Project Schedule.
· Submit to Agency recordings of each training to be used as reference material and a guide covering platform administration, best practices, and configuration steps (“System Administrators Guide”).
· Complete a post-training assessment to verify proficiency of trainees.
· Provide additional materials to enable system administrators to train other Agency users in use of the System, including materials for other tasks in this SOW.
Should the post-training assessment reveal proficiency below a level acceptable to Agency, Offeror shall develop and submit to Agency a plan for providing additional training on sections which show low proficiency. Offeror shall provide additional training addressing these shortfalls upon receipt of Agency approval.
Task 5 Deliverables Offeror shall submit to APM:
· Deliverable 5.1: Meeting minutes from the initial skill review meeting.
· Deliverable 5.2: Agency customized training course outline.
· Deliverable 5.3: System Administrators Guide.
· Deliverable 5.4: System Exercises.
· Deliverable 5.5: Training recordings.
· Deliverable 5.6: The post-training assessment.
· Deliverable 5.7: Additional training materials
Task 5 Acceptance Criteria This Task is considered complete when:
· Agency has accepted the final version of each deliverable.
· Trainees can complete basic configuration tasks in the test environment using the reference materials.
Task 6: Configure email integration Offeror shall enable and configure the email integration for Agency in the System (Test/Prod). Offeror shall assist Agency with enabling and configuring the System’s inbound/outbound email functionality. Offeror shall:
· Assist Agency with configuring outbound email in the Agency’s exchange online environment including documenting technical requirements for Agency systems (Deliverable 6.1). Offeror shall:
· Configure outbound email server (SMTP).
· Configure the System for an agent to have the ability to email a customer from an incident.
· Configure outgoing ticket notifications (e.g., acknowledgement, assignment, closure).
· Assist Agency with configuring inbound email in the Agency’s exchange online including documenting technical requirements for Agency systems (Deliverable 6.2). Offeror shall:
· Create filtering rules and trigger conditions for inbound emails to create a ticket for an incident.
· Configure inbound email settings and rules to log an inbound email related to an existing ticket in the ticket’s work log.
· Gather and document requirements to define mailbox rules (i.e., criteria for "Auto-Create," "Update," and "Ignore"), mapping of email fields to ITSM fields, and priority setting.
· Configure incoming (POP3/IMAP/Graph) mail server.
· Create rules to classify, parse, and route emails (i.e., map sender to user, subject to description, and body to ticket work log).
· For each of inbound and outbound email:
· Develop and deliver test cases to Agency based on Deliverables 6.1 and 6.2. These test cases constitute UAT for this task.
· Compile and report on Agency’s UAT results including details of failed UAT tests.
· Take or coordinate, as appropriate, corrective actions corresponding to failed UAT tests.
Task 6 Deliverables Offeror shall submit to APM:
· Deliverable 6.1: Outbound email configuration documentation.
· Deliverable 6.2: Inbound email configuration documentation.
· Deliverable 6.3: Outbound UAT test cases.
· Deliverable 6.4: Outbound UAT test results.
· Deliverable 6.5: Inbound UAT test cases.
· Deliverable 6.6: Inbound UAT test results.
Task 6 Acceptance Criteria This task is considered complete when:
· Agency has accepted the final version of each deliverable.
Task 7: Enable Incident Management Offeror shall enable and configure the Incident management module within the System. Offeror shall:
· Gather and document (Deliverable 7.1) any additional requirements for incident management processes, roles and capabilities, including:
· Impact/urgency
· Assignment workflow
· Incident type/configuration item mapping
· Categorization
· Support service desk entry of Incidents
· Resolver group entry of Incidents
· Define KPIs for Incident resolution times.
· Analyze and document current manual/email-based incident reporting processes.
· Notification rules
· Audit logs
· Configure Incident Management in the System according to requirements and submit documentation to Agency (Deliverable 7.2).
· Develop and deliver test cases to Agency based on Deliverables 7.1 and 7.2. These test cases constitute UAT for this task.
· Compile and report on Agency’s UAT results including details of failed UAT tests.
· Take or coordinate, as appropriate, corrective actions corresponding to failed UAT tests.
Task 7 Deliverables Offeror shall submit to APM:
· Deliverable 7.1: Incident management requirements document.
· Deliverable 7.2: Incident management configuration documentation.
· Deliverable 7.3: Incident Management UAT test cases.
· Deliverable 7.4: Incident Management UAT test results.
Task 7 Acceptance Criteria This task is considered complete when:
· Agency has accepted the final version of each deliverable.
Task 8: Enable Request Management Offeror shall enable and configure Request Management to automate, track, and manage user-initiated service requests (e.g., software access, hardware provisioning). Offeror shall:
· Coordinate and facilitate a meeting to establish and document Agency Request Management requirements (Deliverable 8.1) including, but not limited to:
· Establishing a self-service portal for users to create Requests from a Service Catalog.
· Support service desk entry of Requests.
· Define KPIs for request completion times.
· Analyze and document current manual/email-based request processes.
· Workflows for approvals (managerial/technical) and automatic assignment of Requests.
· Audit logs.
· Configure Request Management, including request user interface, catalog items, and service catalog and submit documentation to Agency (Deliverable 8.2).
· Develop and deliver test cases to Agency based on Deliverables 8.1 and 8.2. These test cases constitute UAT for this task.
· Compile and report on Agency’s UAT results including details of failed UAT tests.
· Take or coordinate, as appropriate, corrective actions corresponding to failed UAT tests.
Task 8 Deliverables Offeror shall submit to APM:
· Deliverable 8.1: Request Management Requirements document.
· Deliverable 8.2: Request Management Configuration documentation.
· Deliverable 8.3: Request Management UAT test cases.
· Deliverable 8.4: Request Management UAT test results.
Task 8 Acceptance Criteria This task is considered complete when:
· Agency has accepted the final version of each deliverable.
Task 9: Enable Hardware Asset Management Offeror shall enable and configure Hardware Asset Management in the System. This will enable the tracking and management of IT hardware assets throughout their entire lifecycle — from procurement to disposal. Offeror shall:
· Gather and document requirements for Hardware Asset Management (Deliverable 9.1), including:
· Establishing the centralized repository for Capital and Trackable IT Assets.
· Normalization rules (allowed and required data elements) for each asset type.
· Lifecycle workflow, including Request, Receive, Reassign/Move, and Retire.
· Discovery from a tool such as SCCM or InTune including connector configuration.
· Dashboards including inventory, lifecycle status, replacement forecast.
· Audit logs.
· Configure Hardware Asset Management and submit documentation to Agency (Deliverable 9.2).
· Develop and deliver test cases to Agency based on Deliverables 9.1 and 9.2. These test cases constitute UAT for this task.
· Compile and report on Agency’s UAT results including details of failed UAT tests.
· Take or coordinate, as appropriate, corrective actions corresponding to failed UAT tests.
Task 9 Deliverables Offeror shall submit to APM:
· Deliverable 9.1: Hardware Asset Management Requirements document.
· Deliverable 9.2: Configuration Documentation.
· Deliverable 9.3: Hardware Asset Management UAT test cases.
· Deliverable 9.4: Hardware Asset Management UAT test results.
Task 9 Acceptance Criteria This task is considered complete when:
· Agency has accepted the final version of each deliverable.
Task 10: Enable Software Asset Management Offeror shall enable and configure Software Asset Management (“SAM”) within the System, enabling the tracking and management of software assets throughout their entire lifecycle — from procurement to disposal. Offeror shall:
· Gather and document requirements for SAM (Deliverable 10.1), including:
· Establishing the centralized repository for Capital and Trackable IT Assets.
· Normalization rules (allowed and required data elements) for each asset type.
· Lifecycle workflow, including Request, Receive, Reassign/Move, and Retire.
· Discovery from a tool such as SCCM or InTune including connector configuration.
· License reconciliation and compliance reporting.
· Audit logs.
· Configure SAM and submit documentation to Agency (Deliverable 10.2).
· Develop and deliver test cases to Agency based on Deliverables 10.1 and 10.2. These test cases constitute UAT for this task.
· Compile and report on Agency’s UAT results including details of failed UAT tests.
· Take or coordinate, as appropriate, corrective actions corresponding to failed UAT tests.
Task 10 Deliverables Offeror shall submit to APM:
· Deliverable 10.1: SAM Requirements Document.
· Deliverable 10.2: SAM Configuration Documentation.
· Deliverable 10.3: SAM UAT test cases.
· Deliverable 10.4: SAM UAT test results.
Task 10 Acceptance Criteria This task is considered complete when:
Task 11: Import agency data (Subject to negotiation with selected Offeror) Offeror shall extract, transform, and load incidents, request, and asset data from Agency’s systems into the System. Offeror shall:
· Map fields from Agency’s systems to the System and define transformation logic (e.g., reformatting dates), and submit a Field Mapping Document to Agency (Deliverable 11.1).
· Develop and execute test runs against partial data sets to identify potential data loss or incompatibility issues and define mitigation procedures to resolve these issues (Deliverable 11.2).
· Extract data from legacy systems, databases, or flat files.
· Load the data into the System, including handling dependencies between tables.
· Ensure data accuracy, completeness, and integrity between the source and target systems.
· Set up Application Programming Interface (API) integrations, if supported, for real-time or bulk data transfer.
· Run test migrations to identify and document errors and determine a root cause for each (Deliverable 11.3). Offeror shall execute the necessary amount of test migrations to reach Agency’s required benchmark for approval.
· Establish a date for the initial Production Transfer. All data prior to that date shall be transferred to the System from the Agency system.
· Establish a mechanism for a final Production Transfer at go-live which brings all data changes that took place between the initial Production Transfer and the final Production Transfer. As of the go-live date, the data in the two systems should be identical.
· Upon completion of the final production transfer, Offeror shall submit a final Migration Exception report to Agency (Deliverable 11.4). Agency will validate the accuracy and completeness of the imported data and provide documentation of errors to Offeror. Offeror shall respond to Agency’s discovered errors and correct as appropriate and agreed upon with Agency.
· Upon Agency’s confirmation that accuracy and completeness is within Agency’s tolerance, Offeror shall submit to Agency documentation establishing that data migration is complete.
Task 11 Deliverables Offeror shall submit to APM:
· Deliverable 11.1: Field Mapping Document.
· Deliverable 11.2: Mitigation Procedures.
· Deliverable 11.3: Test Migration Exception report.
· Deliverable 11.4: Final Migration Exception report.
· Deliverable 11.5: Data Migration Completion document.
Task 11 Acceptance Criteria This task is considered complete when:
· Agency has accepted the final version of each deliverable.
Task 12: Go-Live Offeror shall finalize the configuration, testing, training and enablement for the production "go-live" of the System, transitioning from the legacy system to the System for: Incident Management, Hardware and Software Asset Management, and Request Management. Offeror shall provide immediate post-go-live support.
Prior to go-live, Agency will verify the following. Should any of the following items fail Agency’s verification, Agency will identify these items for Offeror. Offeror shall review these items and take corrective action as appropriate and agreed upon by Agency. Offeror shall submit documentation to Agency verifying that Agency-discovered issues have been resolved as agreed upon with Agency (Deliverable 12.1).
· The live, configured System environment with verified integrations (e.g., AD, Email, SCCM).
· Incident Management tickets can be created, updated, assigned, escalated, and resolved.
· Service Request Management the Service Catalog is live, allowing users to submit requests, with appropriate approval workflows and fulfillment tasks generated.
· Software and Hardware Asset data is populated and relationships are established.
· Email integration for inbound/outbound email actions are configured, enabling tickets to be created or updated via email.
· 100% of agreed-upon historical data (e.g., active incidents, user records, asset data) has been migrated and validated.
· Validated data in the production environment matches the expected format and mapping of the target system.
· SSO is functional.
· Users, agents, and administrators have the correct permissions, roles and groups.
Task 12 Deliverables Offeror shall submit to APM:
· Deliverable 12.1: Go-Live Readiness documentation.
Task 12 Acceptance Criteria This task is considered complete when:
· The System has been in continuous daily operation for 30 calendar days and has no open high- or medium-severity defects.
Attachment B - Solution Requirements The proposed solution must:
General Requirements
1. Integrate with Agency’s Entra or on-premises Active Directory to manage authentication and authorization.
2. Be available 24 hours a day, 7 days a week, 365 days a year at least 99.8% of the time.
3. Technical support is available to Agency during the hours of 7:00am to 6:00pm Pacific time, following Salem Oregon’s time zone with respect to Daylight Savings Time.
4. Synchronize with Agency employee data (Workday, Active Directory, Microsoft Entra ID) for automatic creation of new employee records and automatic updates to attributes of existing employee records (e.g., location, phone #).
5. Provide an internal support mobile app that includes, but is not limited to, the following: request and incident submission, updates to tickets, status of tickets, viewing of assets, etc.
6. Provide a “dark mode” or similar, low-light-viewable theme to reduce eye strain.
7. Exchange data with source systems or systems of record. An Application Programming Interface or other mechanisms are preferable to flat file import and export. The systems included are:
a. Asset Accounting System
b. Financial Accounting System
c. Configuration Management Database
d. Procurement System
8. Any on-premise, non-appliance components the System requires must be compatible with, and adhere to, Agency’s preferred technology stack which includes, but is not limited to, the following:
a. Windows Server
b. Microsoft SQL Server
c. Internet Information Services (“IIS”)
d. C# (pronounced ‘C-sharp’)
9. Comply with Agency’s cloud use requirements which include, but are not limited to, the following:
a. Encryption of Agency data, in transit and at rest.
b. Support for Entra ID Single Sign-On (“SSO”) via Security Assertion Markup Language (“SAML”) or OpenID Connect.
c. The State of Oregon retains ownership of the data.
10. Ensure Agency has the ability to extract all of its data from the SaaS offering on demand without customization.
11. Incorporate data loss protection into its design that includes but is not limited to: deletion confirmation prompts, activity logging and alerting, frequent automated immutable backups at end of day occurring no less than once every 24 hour period.
12. Not store Agency data outside the continental United States.
13. Remain current with security patches and operating system patches for the servers and systems supporting the SaaS offering.
· Offeror must have an active intrusion detection and response practice and report any breaches to Agency within 24 hours of detection.
· Offeror must comply with the applicable requirements set forth in Department of Administrative Services (“DAS”) Oregon Statewide Information Technology and Security Policies, which may be amended from time to time: Department of Administrative Services : Statewide Policies and Guidelines : State of Oregon
· Offeror will have third-party security audits at least once every three years and provide Agency the audit results.
14. Integrate with Azure DevOps code management (or similar code management capability) for any customizations.
15. Support non-information technology (“IT”) business…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .