00014726 Bid Results.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
AP for Enterprise Engagement Platform (PCS# 120000-03426-AP)
Solicitation number
S-580501-00014725
Issued by
Oregon

About this file

Bid Results Summary

This is a Bid Results tabulation for an Invitation to Bid (ITB No. S-73000-00014726) issued by the State of Oregon for an Emergency Repair Project on US Route 101 at mileposts 314.7 and 344.5 near Brookings, Oregon. The project is a rebid emergency repair initiative that encompasses traffic control, erosion management, contaminated soil handling, and roadway reconstruction work. The bid closing date was September 8, 2025, at 11:00 AM, with four contractors submitting bids: Tidewater Contractors, Inc. (located in Brookings, OR), LTM, Incorporated dba Knife River Materials (Coos Bay, OR), LaDuke Construction, LLC (Central Point, OR), and Granite Construction Company (Vancouver, WA). The scope includes 44 line items ranging from mobilization and temporary traffic control to asbestos removal, excavation, storm sewer installation, and asphalt paving work.

The total bid amounts submitted were $1,753,948.00 (Tidewater Contractors), $2,333,333.00 (LTM, Incorporated), $3,461,940.00 (LaDuke Construction), and $3,604,492.50 (Granite Construction Company). Significant cost variations exist across bidders, particularly for items such as stone embankment ($277,400 to $1,080,400), contaminated soil disposal ($455 to $127,400), and general excavation ($214,400 to $502,500), indicating different interpretations of project scope and risk assessment among contractors. The tabulation explicitly notes that it is not an indicator of award but rather a compilation of submitted bids for consideration, meaning the final contract award determination would be made following bid evaluation and approval by state procurement officials.

View the file

Other files

File Type Posted
Procurement Information~49.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Date Issued:9/8/25
ITB No.S-73000-00014726BIDDER
NAME:Tidewater Contractors, Inc.LTM, Incorporated dba Knife River MaterialsLaDuke Construction, LLCGranite Construction Company
Bid Closing:9/8/2025 at 11:00 AMCITY/STATE:Brookings, ORCoos Bay, ORCentral Point, ORVancouver, WA
Description:ER US101: MP314.7 and MP344.5 Emergency Repair Project REBIDCCB#2999556603193168101195
This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration.
Bid Item #DescriptionEst
QTYUNITUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL

PRICE

1Mobilization1LS$175,000.00$175,000.00$99,879.00$99,879.00$400,000.00$400,000.00$ 350,000.00$350,000.00
2Temporary Protection & Direction of Traffic1LS$65,000.00$65,000.00$207,000.00$207,000.00$45,000.00$45,000.00$ 155,000.00$155,000.00
3Temporary Signs325SQFT$35.00$11,375.00$30.00$9,750.00$42.00$13,650.00$ 12.50$4,062.50
4Portable Changeable Message Signs2EA$6,000.00$12,000.00$1,500.00$3,000.00$9,000.00$18,000.00$ 2,500.00$5,000.00
5Flagger2020HR$88.00$177,760.00$88.50$178,770.00$83.00$167,660.00$ 100.00$202,000.00
6Flagger Station Lighting2EA$5,000.00$10,000.00$1,600.00$3,200.00$5,500.00$11,000.00$ 1,500.00$3,000.00
7Pilot Cars1000HR$97.00$97,000.00$100.50$100,500.00$125.00$125,000.00$ 100.00$100,000.00
8Automated Flagger Assistance Device2EA$4,000.00$8,000.00$2500.00$5,000.00$9,000.00$18,000.00$ 5,000.00$10,000.00
9Temporary Barricades, Type II4EA$75.00$300.00$125.00$500.00$125.00$500.00$ 40.00$160.00
10Temporary Barricades, Type III2EA$200.00$400.00$150.00$300.00$210.00$420.00$ 200.00$400.00
11Temporary Plastic Drums157EA$40.00$6,280.00$100.00$15,700.00$130.00$20,410.00$ 20.00$3,140.00
12Temporary Pavement Bars24SQFT$12.00$288.00$35.00$840.00$24.00$576.00$ 75.00$1,800.00
13Erosion Control1LS$500.00$500.00$100.00$100.00$14,000.00$14,000.00$ 39,000.00$39,000.00
14Plastic Sheeting500SQYD$2.00$1,000.00$2.00$1,000.00$8.00$4,000.00$ 6.00$3,000.00
15Check Dam, Type 17EA$250.00$1,750.00$750.00$5,250.00$185.00$1,295.00$ 350.00$2,450.00
16Inlet Protection, Type 32EA$50.00$100.00$50.00$100.00$240.00$480.00$ 250.00$500.00
17Inlet Protection, Type 42EA$200.00$400.00$80.00$160.00$240.00$480.00$ 250.00$500.00
18Straw Bale30EA$35.00$1,050.00$31.00$930.00$21.00$630.00$ 125.00$3,750.00
19Pollution Control Plan1LS$100.00$100.00$100.00$100.00$1,200.00$1,200.00$ 2,000.00$2,000.00
20Contaminated Soil Disposal455TONS$1.00$455.00$1.00$455.00$280.00$127,400.00$ 300.00$136,500.00
21Lead Compliance Plan1LS$2,000.00$2,000.00$100.00$100.00$8,000.00$8,000.00$ 5,000.00$5,000.00
22Segregate and Stockpile Contaminated Soil1LS$10,000.00$10,000.00$100.00$100.00$60,000.00$60,000.00$ 25,000.00$25,000.00
23Soil Sample Collection and Analytical Testing4EA$400.00$1,600.00$1.00$4.00$2,000.00$8,000.00$ 700.00$2,800.00
24Remove Asbestos Material, Non-Friable20FT$450.00$9,000.00$112.00$2,240.00$200.00$4,000.00$ 125.00$2,500.00
25Construction Survey Work1LS$25,000.00$25,000.00$20000.00$20,000.00$65,000.00$65,000.00$ 10,000.00$10,000.00
26Removal of Structures and Obstructions1LS$12,000.00$12,000.00$20,000.00$20,000.00$60,000.00$60,000.00$ 17,000.00$17,000.00
27Clearing and Grubbing1LS$10,000.00$10,000.00$1,500.00$1,500.00$190,000.00$190,000.00$ 10,000.00$10,000.00
28General Excavation6700CUYD$32.50$217,750.00$42.00$281,400.00$32.00$214,400.00$ 75.00$502,500.00
29Stone Embankment7300TONS$38.00$277,400.00$55.00$401,500.00$148.00$1,080,400.00$ 140.00$1,022,000.00
3024 Inch Subgrade Stabilization150SQYD$70.00$10,500.00$125.00$18,750.00$38.00$5,700.00$ 165.00$24,750.00
31Subgrade Geotextile9500SQYD$1.20$11,400.00$1.50$14,250.00$3.00$28,500.00$ 3.00$28,500.00
32Riprap Basins1EA$5,000.00$5,000.00$4,000.00$4,000.00$1,400.00$1,400.00$ 8,000.00$8,000.00
3324 Inch Storm Sewer Pipe, 10 ft Depth76FT$440.00$33,440.00$860.00$65,360.00$280.00$21,280.00$ 400.00$30,400.00
3424 Inch Storm Sewer Pipe, 20 ft Depth126FT$545.00$68,670.00$1,000.00$126,000.00$410.00$51,660.00$ 450.00$56,700.00
35Concrete Inlets, Type G-2MA2EA$6,100.00$12,200.00$8,500.00$17,000.00$3,800.00$7,600.00$ 16,000.00$32,000.00
36Adjusting Catch Basins1EA$750.00$750.00$3400.00$3,400.00$1,400.00$1,400.00$ 2,000.00$2,000.00
37Filling Abandon Structure2EA$3,000.00$6,000.00$7500.00$15,000.00$6,000.00$12,000.00$ 1,500.00$3,000.00
38Aggregate Base and Shoulders2400TONS$44.00$105,600.00$103.00$247,200.00$38.00$91,200.00$ 125.00$300,000.00
39Level 3, 1/2 Inch ACP Mixture (64-22 oil)2400TONS$130.00$312,000.00$172.00$412,800.00$203.00$487,200.00$ 185.00$444,000.00
40Guardrail, Type 2A875FT$26.00$22,750.00$25.00$21,875.00$65.00$56,875.00$ 40.00$35,000.00
41Guardrail Terminals, Flared3EA$6,000.00$18,000.00$5,200.00$15,600.00$4,000.00$12,000.00$ 4,000.00$12,000.00
42Delineators, Type 110EA$105.00$1,050.00$100.00$1,000.00$40.00$400.00$ 10.00$100.00
43Bi-Directional Yellow Type IAR Markers26EA$30.00$780.00$25.00$650.00$24.00$624.00$ 30.00$780.00
44Thermoplastic, Sprayed, Surface, Non-Profiled4100FT$3.00$12,300.00$2.70$11,070.00$6.00$24,600.00$ 2.00$8,200.00
TOTAL$ 1,753,948.00$ 2,333,333.00$ 3,461,940.00$ 3,604,492.50