This is an Intent to Award document from the Oregon Department of Transportation (ODOT) for the Brush Creek Repairs project, issued on 4/8/25 with Invitation to Bid (ITB) No. S-73000-00012767. The project involves stream restoration work, including streambed excavation, installation of riprap, fish rocks, engineered streambed material, and channel sealing options. The bid closed on 04/07/2025 at 10:00 AM, with multiple bidders submitting proposals, including HP Civil Inc, Wildish Standard Paving Co, Eastern Oregon Contracting LLC, and MB Suulutaaq. The contract includes base bid items and two additive alternates (shotcrete liner and geomembrane liner), with quantities ranging from 44.9 tons of granular bentonite to 917 square yards of potential liner installations.
ODOT intends to award the contract to HP Civil Inc, with the lowest responsive bid totaling $586,249.44 for the base bid and potentially $824,669.44 when including Alternate 1. The bid tabulation provides detailed unit pricing for 13 distinct line items, with prices varying significantly between bidders. Aggrieved bidders have 5 calendar days from the issued date to protest the intent to award. The project encompasses comprehensive stream restoration activities, including mobilization, temporary traffic control, water management, pollution control, erosion control, and turbidity monitoring. The procurement appears open to qualified contractors with environmental construction and stream restoration capabilities, with no specific set-aside designations mentioned in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment C Bid Pricing Form Revised.xlsx | XLSX spreadsheet | |
| Attachment A Special Provisions~3.docx | DOCX document | |
| Attachment D Description of Base Bid and Alternates~2.docx | DOCX document | |
| 00012767 Addendum 1.docx | DOCX document | |
| Invitation.To.Bid~15.docx | DOCX document | |
| Attachment C Bid Pricing Form~15.xlsx | XLSX spreadsheet | |
| 00012767 Preliminary Results.xlsx | XLSX spreadsheet | |
| LCC_CMGC Notice of Exemption-B15_Findings of Fact_1.28.2025~1.pdf | ||
| Attachment B Plans~6.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 4/8/25 | |||||
| ITB No. | S-73000-00012767 | BIDDER | ||||
| NAME: | HP Civil Inc | Wildish Standard Paving Co | Eastern Oregon Contracting LLC | MB Suulutaaq | ||
| Bid Closing: | 04/07/2025 @ 10:00 AM | |||||
| Description: | Brush Creek Repairs | |||||
| This bid tabulation shall serve as ODOT's notice of intent to award a contract to (HP Civil Inc). Aggreved Bidders have 5 calendar days from the issued date shown above to protest the intent to award. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | Mobilization | 1 | LS | $ 87,051.94 | $ 87,051.94 | $245,000.00 | $ 245,000.00 | $ 230,500.00 | $ 230,500.00 | $ 112,000.00 | $ 112,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2 | Temporary Work Zone Traffic Control, Complete | 1 | LS | $ 120,000.00 | $ 120,000.00 | $30,000.00 | $ 30,000.00 | $ 105,000.00 | $ 105,000.00 | $ 101,000.00 | $ 101,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3 | Temporary Water Management | 1 | LS | $ 120,000.00 | $ 120,000.00 | $20,000.00 | $ 20,000.00 | $ 25,000.00 | $ 25,000.00 | $ 37,000.00 | $ 37,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 | Pollution Control Plan | 1 | LS | $ 500.00 | $ 500.00 | $3,000.00 | $ 3,000.00 | $ 3,000.00 | $ 3,000.00 | $ 1,650.00 | $ 1,650.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 5 | Erosion Control | 1 | LS | $ 7,500.00 | $ 7,500.00 | $6,000.00 | $ 6,000.00 | $ 33,000.00 | $ 33,000.00 | $ 13,500.00 | $ 13,500.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 | Turbidity Monitoring | 1 | LS | $ 2,500.00 | $ 2,500.00 | $2,000.00 | $ 2,000.00 | $ 10,000.00 | $ 10,000.00 | $ 3,600.00 | $ 3,600.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 7 | Streambed Excavation | 313 | CUYD | $ 160.00 | $ 50,080.00 | $180.00 | $ 56,340.00 | $ 190.00 | $ 59,470.00 | $ 185.00 | $ 57,905.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 | Salvaged Steambed Material | 116 | CUYD | $ 200.00 | $ 23,200.00 | $180.00 | $ 20,880.00 | $ 190.00 | $ 22,040.00 | $ 177.00 | $ 20,532.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 9 | Class 200 riprap | 725 | CUYD | $ 73.50 | $ 53,287.50 | $120.00 | $ 87,000.00 | $ 100.00 | $ 72,500.00 | $ 120.00 | $ 87,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 10 | Type 2 Fish Rocks | 102 | EACH | $ 150.00 | $ 15,300.00 | $250.00 | $ 25,500.00 | $ 220.00 | $ 22,440.00 | $ 244.00 | $ 24,888.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 11 | Engineered Streambed Material | 116 | CUYD | $ 350.00 | $ 40,600.00 | $180.00 | $ 20,880.00 | $ 250.00 | $ 29,000.00 | $ 462.00 | $ 53,592.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 12 | Granular Bentonite | 44.9 | TON | $ 700.00 | $ 31,430.00 | $1,250.00 | $ 56,125.00 | $ 1,600.00 | $ 71,840.00 | $ 762.00 | $ 34,213.80 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 13 | 2" Shotcrete Joint Seal | 58 | SQ YD | $ 600.00 | $ 34,800.00 | $750.00 | $ 43,500.00 | $ 500.00 | $ 29,000.00 | $ 3,285.00 | $ 190,530.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
13 Bid Alternate 1 (shotcrete liner) 917 SQYD $ 260.00 $ 238,420.00 $ - 0 $ - 0 $ 300.00 $ 275,100.00 $ 265.00 $ 243,005.00 $ - 0 $ - 0 $ - 0 $ - 0
| 14 | Bid Alternate 2 (30 mil Geomembrane liner) | 917 | SQYD | $ 50.00 | $ 45,850.00 | $ 25.00 | $ 22,925.00 | $ 75.00 | $ 68,775.00 | $ 105.00 | $ 96,285.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| TOTAL BASE BID ONLY | $ 586,249.44 | $ 616,225.00 | $ 712,790.00 | $ 737,410.80 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| TOTAL BASE BID + ADD ALTERNATE 1 | $ 824,669.44 | No Total Pricing Provided | $ 987,890.00 | $ 980,415.80 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| TOTAL BASE BID + ADD ALTERNATE 2 | $ 632,099.44 | $ 639,150.00 | $ 781,665.00 | $ 833,695.80 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |