00012078 Prelim Bid Results.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- SURVEY & MAPPING EQUIPMENT AND SUPPLIES
- Solicitation number
- S-10700-00012077
- Issued by
- Oregon
About this file
This is a preliminary bid results tabulation for Invitation to Bid (ITB) No. S-73000-00012078, issued by the State of Oregon on December 13, 2024, for the ESB ODOT D3 Salem Area Bridges Fencing Project. The project encompasses ornamental iron fence and gate installation across four bridge locations in the Salem, Oregon area: Center Street Bridge (Main EB Bridge Near RxR Tracks), Center Street Bridge (Main EB Bridge and NB Off Ramp from EB Direction), Marion Street Bridge (Main WB Bridge), and an Overpass Bridge over Market Street (North and South Sides). The bid closing date was December 13, 2024, at 11:30 a.m. Four bidders submitted proposals: CMH Remodeling (Salem, OR), LCL Evergreen Developers LLC (Oregon City, OR), Mid Valley Excavation LLC (Sublimity, OR), and NW Industrial Flooring, Inc., dba NW Pure Construction Inc. (Boring, OR). The project is structured with four bid alternates (A, B, C, and D), each representing a specific bridge location with varying quantities of ornamental iron fencing (ranging from 282 to 716 linear feet) and 12-foot single gates (ranging from one to two units per alternate).
The bid tabulation presents unit prices and total prices for each alternate, with Bid Alternate A (Center Street Bridge Main EB) ranging from $42,088.00 to $54,826.00, Alternate B (Center Street Bridge EB and NB Off Ramp) ranging from $64,956.00 to $76,287.00, Alternate C (Marion Street Bridge) ranging from $37,066.00 to $46,306.00, and Alternate D (Market Street Overpass) ranging from $83,928.00 to $100,252.00. All bids include line items for mobilization, temporary work zone traffic control, pollution control plans, ornamental iron fence installation, and gate installation. The document explicitly states that this bid tabulation is not an indicator of award and serves only as a compilation of submitted bids for consideration. Contractors provided CCB (Construction Contractors Board) license numbers ranging from 167697 to 214573.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24123 Survey and Mapping Coop Sol.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 12/13/24 | |||||||
| ITB No. | S-73000-00012078 | BIDDER | ||||||
| NAME: | CMH Remodeling LCL | Evergreen Developers LLC | Mid Valley Excavation LLC | NW Industrial Flooring, Ind, dba NW Pure Construction Inc | ||||
| Bid Closing: | 12/13/2024 @ 11:30 am | CITY/STATE: | Salem, OR | Oregon City, OR | Sublimity, OR | Boring, OR | ||
| Description: | ESB ODOT D3 Salem Area Bridges Fencing Project | CCB#: | 167697 | 213994 | 197179 | 214573 | ||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| Bid Alternate A - Center Street Bridge (Main EB Bridge Near RxR Tracks) | |||||||||||
| 1A | Mobilization | 1 | LS | $5,000.00 | $ 5,000.00 | $6,698.00 | $ 6,698.00 | $4,000.00 | $ 4,000.00 | $ 2,000.00 | $ 2,000.00 |
| 2A | Temporary Work Zone Traffic Control, Complete | 1 | LS | $ 3,000.00 | $ 3,000.00 | $ 2,100.00 | $ 2,100.00 | $ 200.00 | $ 200.00 | $ 1,000.00 | $ 1,000.00 |
| 3A | Pollution Control Plan | 1 | LS | $ 1,500.00 | $ 1,500.00 | $ 245.00 | $ 245.00 | $ 140.00 | $ 140.00 | $ 300.00 | $ 300.00 |
| 4A | Ornamental Iron Fence | 336 | LF | $ 68.80 | $ 23,116.80 | $ 116.00 | $ 38,976.00 | $ 93.00 | $ 31,248.00 | $ 122.00 | $ 40,992.00 |
| 5A | 12 Foot Single Gate | 1 | EA | $ 10000.00 | $ 10,000.00 | $ 6807.00 | $ 6,807.00 | $ 6500.00 | $ 6,500.00 | $ 4,800.00 | $ 4,800.00 |
| Bid Alternate "A" Total: | $ 42,616.80 | $ 54,826.00 | $ 42,088.00 | $ 49,092.00 | |||||||
| Bid Alternate B - Center Street Bridge (Main EB Bridge and NB Off Ramp from EB Direction) | |||||||||||
| 1B | Mobilization | 1 | LS | $5,000.00 | $ 5,000.00 | $6,698.00 | $ 6,698.00 | $4,000.00 | $ 4,000.00 | $ 2,000.00 | $ 2,000.00 |
| 2B | Temporary Work Zone Traffic Control, Complete | 1 | LS | $ 3,000.00 | $ 3,000.00 | $ 2,100.00 | $ 2,100.00 | $ 200.00 | $ 200.00 | $ 1,000.00 | $ 1,000.00 |
| 3B | Pollution Control Plan | 1 | LS | $ 1,500.00 | $ 1,500.00 | $ 245.00 | $ 245.00 | $ 140.00 | $ 140.00 | $ 300.00 | $ 300.00 |
| 4B | Ornamental Iron Fence | 512 | LF | $ 68.80 | $ 35,225.60 | $ 106.00 | $ 54,272.00 | $ 93.00 | $ 47,616.00 | $ 122.00 | $ 62,464.00 |
| 5B | 12 Foot Single Gate | 2 | EA | $ 10000.00 | $ 20,000.00 | $ 6486.00 | $ 12,972.00 | $ 6500.00 | $ 13,000.00 | $ 4,800.00 | $ 9,600.00 |
| Bid Alternate "B" Total: | $ 64,725.60 | $ 76,287.00 | $ 64,956.00 | $ 75,364.00 | |||||||
| Bid Alternate C - Marion Street Bridge (Main WB Bridge) | |||||||||||
| 1C | Mobilization | 1 | LS | $5,000.00 | $ 5,000.00 | $6,698.00 | $ 6,698.00 | $4,000.00 | $ 4,000.00 | $ 2,000.00 | $ 2,000.00 |
| 2C | Temporary Work Zone Traffic Control, Complete | 1 | LS | $ 3,000.00 | $ 3,000.00 | $ 2,100.00 | $ 2,100.00 | $ 200.00 | $ 200.00 | $ 1,000.00 | $ 1,000.00 |
| 3C | Pollution Control Plan | 1 | LS | $ 1,500.00 | $ 1,500.00 | $ 245.00 | $ 245.00 | $ 140.00 | $ 140.00 | $ 300.00 | $ 300.00 |
| 4C | Ornamental Iron Fence | 282 | LF | $ 68.80 | $ 19,401.60 | $ 108.00 | $ 30,456.00 | $ 93.00 | $ 26,226.00 | $ 122.00 | $ 34,404.00 |
| 5C | 12 Foot Single Gate | 1 | EA | $ 10000.00 | $ 10,000.00 | $ 6807.00 | $ 6,807.00 | $ 6500.00 | $ 6,500.00 | $ 4,800.00 | $ 4,800.00 |
| Bid Alternate "C" Total: | $ 38,901.60 | $ 46,306.00 | $ 37,066.00 | $ 42,504.00 | |||||||
| Bid Alternate D - Overpass Bridge over Market Street (North and South Sides) | |||||||||||
| 1D | Mobilization | 1 | LS | $5,000.00 | $ 5,000.00 | $6,698.00 | $ 6,698.00 | $4,000.00 | $ 4,000.00 | $ 2,000.00 | $ 2,000.00 |
| 2D | Temporary Work Zone Traffic Control, Complete | 1 | LS | $ 3,000.00 | $ 3,000.00 | $ 2,100.00 | $ 2,100.00 | $ 200.00 | $ 200.00 | $ 1,000.00 | $ 1,000.00 |
| 3D | Pollution Control Plan | 1 | LS | $ 1,500.00 | $ 1,500.00 | $ 245.00 | $ 245.00 | $ 140.00 | $ 140.00 | $ 300.00 | $ 300.00 |
| 4D | Ornamental Iron Fence | 716 | LF | $ 68.80 | $ 49,260.80 | $ 100.00 | $ 71,600.00 | $ 93.00 | $ 66,588.00 | $ 122.00 | $ 87,352.00 |
| 5D | 12 Foot Single Gate | 2 | EA | $ 10000.00 | $ 20,000.00 | $ 6486.00 | $ 12,972.00 | $ 6500.00 | $ 13,000.00 | $ 4,800.00 | $ 9,600.00 |
| Bid Alternate "D" Total: | $ 78,760.80 | $ 93,615.00 | $ 83,928.00 | $ 100,252.00 |
File details come from the government source that posted it. Updated .