00011431 Preliminary BID_TABS.xlsx
XLSX spreadsheet 17 KB Posted
- Solicitation number
- S-580501-00011428
- Issued by
- Oregon
About this file
This is a preliminary bid tabulation for Invitation to Bid (ITB) No. S-73000-00011431 issued by the City of Sherwood, Oregon, for the OR43 at McVey Ave Project. The project encompasses multiple construction line items including mobilization, temporary work zone traffic control, inlet protection, construction survey work, removal and replacement of curbs and walks, concrete work, concrete curb ramps, truncated domes, pavement markings, signal support drilled shaft installation, and traffic signal modifications. The estimated quantities vary by item, ranging from single lump-sum activities to larger quantities such as 290 square feet of concrete walks and 94 linear feet of concrete curbs. The bid closing date was November 25, 2024. Five contractors submitted bids: NorthStar Electrical Contractors, Inc. (Sherwood, OR), Aaken Corporation (Bend, OR), Brown Contracting, Inc. (Eugene, OR), Wildish Standard Paving Co. (Eugene, OR), and Kodiak Pacific Construction Co. (Sherwood, OR).
The total bid prices submitted ranged from $179,619.00 to $290,094.00, with significant variation in unit pricing across line items. NorthStar Electrical Contractors, Inc. submitted the lowest total bid at $179,619.00, while Kodiak Pacific Construction Co. submitted the highest at $290,094.00. Notable price differences appear in major cost categories such as traffic signal modification work, which ranged from $61,000.00 to $100,000.00, and concrete walks pricing, which varied from $26.00 to $107.00 per square foot. The bid tabulation explicitly states that it is not an indicator of award and serves only as a compilation of submitted bids for consideration. No information regarding set-asides, incumbent contractors, contract award dates, or contract term is provided in this preliminary tabulation document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Procurement Information~56.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | |||||||||
| ITB No. | S-73000-00011431 | BIDDER | |||||||
| NAME: | NorthStar Electrical Contractors, Inc | Aaken Corporation | Brown Contracting, Inc | Wildish Standard Paving Co | Kodiak Pacific Construction Co. | ||||
| Bid Closing: | November 25, 2024 | CITY/STATE: | Sherwood, OR | Bend, OR. | Eugene, OR | Eugene, OR. | Sherwood, OR | ||
| Description: | OR43 at McVey Ave Project | CCB#: | 90454 | 170901 | 114260 | 63256 | 53583 | ||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | MOBILIZATION | 1 | LS | $ 23,500.00 | $ 23,500.00 | $ 19,500.00 | $ 19,500.00 | $ 19,130.00 | $ 19,130.00 | $26,001.00 | $ 26,001.00 | $ 49,707.00 | $ 49,707.00 |
| 2 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE | 1 | LS | $ 24,000.00 | $ 24,000.00 | $ 27,300.00 | $ 27,300.00 | $ 18,000.00 | $ 18,000.00 | $44,000.00 | $ 44,000.00 | $ 51,407.00 | $ 51,407.00 |
| 3 | INLET PROTECTION, TYPE 3 | 1 | EACH | $ 550.00 | $ 550.00 | $ 500.00 | $ 500.00 | $ 600.00 | $ 600.00 | $200.00 | $ 200.00 | $ 777.00 | $ 777.00 |
| 4 | CONSTRUCTION SURVEY WORK | 1 | LS | $ 10,500.00 | $ 10,500.00 | $ 5,720.00 | $ 5,720.00 | $ 5,500.00 | $ 5,500.00 | $2,000.00 | $ 2,000.00 | $ 8,407.00 | $ 8,407.00 |
| 5 | REMOVAL OF CURB RAMP, WALK, CURB, SURFACING | 34 | SQYD | $ 300.00 | $ 10,200.00 | $ 144.00 | $ 4,896.00 | $ 160.00 | $ 5,440.00 | $400.00 | $ 13,600.00 | $ 477.00 | $ 16,218.00 |
| 6 | MINOR ADJUSTMENT OF MANHOLES | 2 | EACH | $ 900.00 | $ 1,800.00 | $ 1,380.00 | $ 2,760.00 | $ 2,200.00 | $ 4,400.00 | $2,500.00 | $ 5,000.00 | $ 1,507.00 | $ 3,014.00 |
| 7 | CONCRETE CURBS | 94 | FOOT | $ 95.00 | $ 8,930.00 | $ 64.00 | $ 6,016.00 | $ 145.00 | $ 13,630.00 | $150.00 | $ 14,100.00 | $ 147.00 | $ 13,818.00 |
| 8 | CONCRETE CURBS, CURB AND GUTTER | 26 | FOOT | $ 95.00 | $ 2,470.00 | $ 64.00 | $ 1,664.00 | $ 160.00 | $ 4,160.00 | $200.00 | $ 5,200.00 | $ 407.00 | $ 10,582.00 |
| 9 | CONCRETE CURBS, CURB AND GUTTER, MODIFIED | 5 | FOOT | $ 95.00 | $ 475.00 | $ 64.00 | $ 320.00 | $ 400.00 | $ 2,000.00 | $300.00 | $ 1,500.00 | $ 2,007.00 | $ 10,035.00 |
| 10 | CONCRETE WALKS | 290 | SQFT | $ 26.00 | $ 7,540.00 | $ 28.00 | $ 8,120.00 | $ 30.00 | $ 8,700.00 | $50.00 | $ 14,500.00 | $ 107.00 | $ 31,030.00 |
| 11 | EXTRA FOR NEW CURB RAMPS | 2 | EACH | $ 3,950.00 | $ 7,900.00 | $ 2,300.00 | $ 4,600.00 | $ 3,000.00 | $ 6,000.00 | $5,000.00 | $ 10,000.00 | $ 1,607.00 | $ 3,214.00 |
| 12 | TRUNCATED DOMES ON NEW SURFACES | 24 | SQFT | $ 95.00 | $ 2,280.00 | $ 69.00 | $ 1,656.00 | $ 65.00 | $ 1,560.00 | $75.00 | $ 1,800.00 | $ 37.00 | $ 888.00 |
| 13 | PAVEMENT BAR, TYPE B-HS | 18 | SQFT | $ 93.00 | $ 1,674.00 | $ 159.00 | $ 2,862.00 | $ 130.00 | $ 2,340.00 | $90.00 | $ 1,620.00 | $ 167.00 | $ 3,006.00 |
| 14 | 36 INCH DIAMETER SIGNAL SUPPORT DRILLED SHAFT | 12 | FOOT | $ 1,400.00 | $ 16,800.00 | $ 1,035.00 | $ 12,420.00 | $ 2,400.00 | $ 28,800.00 | $2,200.00 | $ 26,400.00 | $ 2,107.00 | $ 25,284.00 |
| 15 | TRAFFIC SIGNAL MODIFICATION, _____ | 1 | LS | $ 61,000.00 | $ 61,000.00 | $ 90,755.00 | $ 90,755.00 | $ 72,000.00 | $ 72,000.00 | $100,000.00 | $ 100,000.00 | $ 62,707.00 | $ 62,707.00 |
| TOTAL | $ 179,619.00 | $ 189,089.00 | $ 192,260.00 | $ 265,921.00 | $ 290,094.00 |
File details come from the government source that posted it. Updated .