This is a Request for Competitive Quotes (RFCQ) document issued by the Oregon Department of Transportation (ODOT) for debris removal and stockpile cleanup services at a state highway location. The project, designated ESB - OR36 MP 9.5 Stockpile Cleanup, involves the removal of approximately 3,000 cubic yards of debris located beneath blackberry vegetation and approximately 1,800 cubic yards of wood chips from an ODOT stockpile site on Oregon Route 36 at mile point 9.5 in Lane County. The contractor is responsible for all aspects of debris removal, including pickup, transportation, and final disposal, as well as obtaining all necessary environmental and regulatory permits prior to commencing work. Work must be performed during standard business hours (7:00 AM to 7:00 PM) on weekdays only, with no work permitted on weekends or state-observed holidays. The contract includes a Final Completion date of December 27, 2024, and incorporates the 2024 Oregon Standard Specifications for Construction. ODOT Project Manager Wade Powell (541-736-2846) serves as the owner's authorized representative for contract administration.

The contract is structured as a lump-sum payment arrangement covering all labor, equipment, materials, traffic control, mobilization, supervision, and incidental costs associated with the work. Liquidated damages are assessed at $300 per calendar day for each day work extends beyond the Substantial Completion date. As an Emerging Small Business (ESB) contract, the successful contractor must be certified by Oregon's Certification Office for Business Inclusion and Diversity (COBID) and must perform at least 51 percent of the labor using its own workforce. The contractor must maintain Workers' Compensation and Employer's Liability Insurance with minimum limits of $500,000 per accident, Commercial General Liability Insurance with per-occurrence limits of $1,000,000 and annual aggregate limits of $2,000,000, and Commercial Automobile Liability Insurance with combined single limits of $1,000,000 per occurrence. Additionally, the contractor must comply with prevailing wage requirements for Lane County, BOLI Region 5, and must maintain a qualifying drug testing program for employees. All removed debris becomes the contractor's property at the point of removal and must be disposed of in compliance with federal, state, and local laws. The contract requires submission of an ODOT Form 734-2882 Paid Summary Report following each payment and completion of a Contract Closeout Compliance Checklist prior to final payment.

View the file

Other files

File Type Posted
HR1588-24 OregonBuys Posting Page.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev 01/2022 Page 1 of 24

ATTACHMENT A –SAMPLE AGREEMENT FORM

PROSPECTIVE CONTRACTOR INSTRUCTIONS: Do not submit this document with your Competitive Quote. If you are the successful prospective Contractor, ODOT will fill in the blanks within this form and request your signature, which will represent your agreement to enter into a contract. PLEASE NOTE: There are some terms in this document that you will be agreeing to should you be awarded a contract; for instance, completion dates and liquidated damages. Please make sure you have read and understand this document before you submit a Competitive Quote.

STATE OF OREGON SERVICES AGREEMENT FORM

for the project

ESB – OR36 MP 9.5 Stockpile Cleanup

Contract Number

Resulting from Request for Competitive Quotes No. S-73000-00011386

Note: The Contract described in this agreement form is not a Public Improvement contract as defined in Oregon’s procurement code. However, ODOT has chosen to use the State of Oregon General Conditions for Public Improvement Contracts (“General Conditions”) as the governing terms and conditions for this contract. When the terms “Public Improvement Agreement” or “Public Improvement Agreement Form” are used in the General Conditions, for this contract those terms mean “Services Agreement” or “Services Agreement Form.”

This Agreement (the “Agreement”), made by and between the State of Oregon, acting by and through the Department of Transportation, hereinafter called OWNER, and_____________________________________ hereinafter called CONTRACTOR, (collectively the “Parties”) shall become effective on the date this Agreement has been signed by all the Parties and all required State of Oregon governmental approvals have been obtained, whichever is later. Unless otherwise defined in the in this Agreement or its attachments, the capitalized terms used herein are defined in Section A.1 of the State of Oregon General Conditions for Public Improvement Contracts.

WITNESSETH:

1. Contract Price, Contract Documents and Work.

CONTRACTOR, in consideration of the sum of $ (the “Contract Price”), to be paid to CONTRACTOR by OWNER in the manner and at the time hereinafter provided, and subject to the terms and conditions provided in the Contract Documents, all of which are incorporated herein by reference, hereby agrees to perform all Work described and reasonably inferred from the Contract Documents.

CONTRACTOR understands and agrees that various provisions incorporated from websites and Attachments to the Request for Competitive Quotes and other Contract Documents were not physically attached but were and are incorporated by reference and have the same force and effect as if fully set forth therein.

CONTRACTOR shall perform the Work for the Contract Price pursuant to the Request for Competitive Quotes identified above (including all Addenda thereto, if any), CONTRACTOR’S response to the Request

Rev 01/2022 Page 2 of 24 for Competitive Quote, and the following attachments to the Request for Competitive Quotes, which were posted in OregonBuys as part of the Request for Competitive Quotes advertisement and are incorporated into the Contract by this reference:

Exhibit 1 Technical Specifications Exhibit 2 Reserved Exhibit 3 General and Supplemental General Conditions Exhibit 4 Contract Closeout Compliance Checklist

ATTACHMENTS INCORPORATED FROM WEBSITES:

Oregon Bureau of Labor and Industries Prevailing Wage Rates for Public Contracts Prevailing Wage Rate Book as amended applicable to projects first advertised for bid on August 29, 2024 for Work that will take place in Lane County, BOLI Region 5, available at:

https://www.oregon.gov/boli/employers/Pages/prevailing-wage-rates.aspx

ODOT’s Conflict of Interest Guidelines are available on ODOT’s website (see Guidance, Policy & Resources) and are incorporated into this Contract:

http://www.oregon.gov/ODOT/Business/Procurement/Pages/PSK.aspx

The Contract Price includes: Competitive Quote items #1

Bid results will be inserted here prior to Contract Execution

2. Representatives.

Unless otherwise specified in the Contract Documents, OWNER designates the person listed below as its Authorized Representative in the administration of the Contract. The Owner’s Authorized Representative shall be the initial point of contact for matters related to performance, payment, authorization, and to carry out the responsibilities of OWNER. CONTRACTOR has named _______________________________________ its authorized representative to act on its behalf.

Owner’s Authorized Representative:

Wade Powell 2080 Laura St Springfield OR 97477 Cell Phone: 541-736-2846 Wade.Powell@odot.oregon.gov

3. Contract Dates (See the General Conditions for definitions of Substantial and Final Completion):

Final Completion Date: December 27, 2024

4. Liquidated Damages.

Failure to achieve Substantial Completion by the time specified above for Substantial Completion will result in damage to OWNER. Since actual damage will be difficult to determine, it is agreed that CONTRACTOR shall pay to OWNER, not as a penalty but as liquidated damages, $300.00 per calendar https://www.oregon.gov/boli/employers/Pages/prevailing-wage-rates.aspx http://www.oregon.gov/ODOT/Business/Procurement/Pages/PSK.aspx mailto:Wade.Powell@odot.oregon.gov

Rev 01/2022 Page 3 of 24 day for each day elapsed in excess of the Substantial Completion date specified in Section 3 of this Agreement until Substantial Completion is achieved.

5. Certifications.

(a) Reserved.

(b) Contractor certifies that Contractor has no undisclosed liquidated and delinquent debt owed to the State or any department or agency of the State.

(c) Contractor certifies that all subcontractors performing Work described in ORS 701.005(2) (i.e., construction Work) will be registered with the Oregon Construction Contractors Board or licensed by the Oregon State Landscape Contractors Board in accordance with ORS 701.035 to 701.055 before the subcontractors commence Work under the Contract.

(d) Contractor certifies that it is certified by the State of Oregon as an “Emerging Small Business” per the guidelines of the Certification Office for Business Inclusion and Diversity (“COBID”), that it will comply with all requirements of the Emerging Small Business Assistance Program under Oregon Revised Statute (ORS) 200.160 through ORS 200.200, and that it will perform at least 51 percent of the labor for the Work using the Contractor's own workforce.

(e) Contractor has a Qualifying Drug Testing Program in place for its employees that includes, at a minimum, the following: (i) A written employee drug testing policy, (ii) Required drug testing for all new Subject Employees or, alternatively, required testing of all Subject Employees every 12 months on a random selection basis, and (iii) Required testing of a Subject Employee when the Offeror has reasonable cause to believe the Subject Employee is under the influence of drugs.

6. Integration.

THE CONTRACT DOCUMENTS CONSTITUTE THE ENTIRE AGREEMENT BETWEEN THE PARTIES. NO

WAIVER, CONSENT, MODIFICATION OR CHANGE OF TERMS OF THE CONTRACT SHALL BIND EITHER PARTY UNLESS IN WRITING AND SIGNED BY BOTH PARTIES. SUCH WAIVER, CONSENT, MODIFICATION OR CHANGE, IF MADE, SHALL BE EFFECTIVE ONLY IN THE SPECIFIC INSTANCE AND FOR THE SPECIFIC PURPOSE GIVEN. THERE ARE NO OTHER UNDERSTANDINGS, AGREEMENTS, OR REPRESENTATIONS, ORAL OR WRITTEN, NOT SPECIFIED HEREIN REGARDING THIS CONTRACT. CONTRACTOR, BY THE SIGNATURE

BELOW OF ITS AUTHORIZED REPRESENTATIVE, HEREBY ACKNOWLEDGES THAT IT HAS READ THE

CONTRACT, UNDERSTANDS IT, AND AGREES TO BE BOUND BY ITS TERMS AND CONDITIONS.

In witness whereof, OWNER executes this Agreement and CONTRACTOR does execute the same as of the day and year indicated below.

CONTRACTOR’S INFORMATION:

NAME & ADDRESS: __

CONTACT INFORMATION: __

CONTRACTOR’S CCB #: __ CCB EXPIRATION DATE: __

Rev 01/2022 Page 4 of 24

CONTRACTOR’S ESB #: ___

CONTRACTOR’S AUTHORIZED SIGNATURE:

Title Date

OWNER’S AUTHORIZED SIGNATURE:

Title Date

Rev 01/2022 Page 5 of 24

Exhibit 1

TECHNICAL SPECIFICATIONS

ESB – OR36 MP 9.5 Stockpile Cleanup

2024 OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION: The 2024 Oregon Standard Specifications for Construction (“Standard Specifications”) include detailed technical specifications that apply to this Request for Competitive Quotes and resulting Contract.

Some sections of the technical specifications are identified and modified below. Sections of the technical specifications not identified below remain applicable to the Contract according to their original terms.

Part 00100 of the Standard Specifications (General Conditions) is not applicable to the Contract;

however, if a technical specification (Parts 200 and beyond) references a section from Part 00100, that section from Part 00100 applies to the Contract for purposes of supporting and giving full effect to the technical specification. The Standard Specifications are available online:

http://www.oregon.gov/ODOT/HWY/SPECS/Pages/standard_specifications.aspx

These specifications identify certain responsibilities of the Project Manager that would otherwise be responsibilities of the Owner’s Authorized Representative, in accordance with General Conditions Section A.1. ODOT, as Owner, hereby delegates those identified responsibilities to the Project Manager. All other responsibilities of Owner remain with the Owner’s Authorized Representative identified in the Public Improvement Agreement Form.

1. PROJECT MANAGER:

Wade Powell 2080 Laura St Springfield OR 97477 Cell Phone: 541-736-2846 Wade.Powell@odot.state.or.us

2. WORK SCHEDULE:

Contractor must perform all work under the Contract during the hours of 7:00 am and 7:00 pm Mondays through Fridays. No work may be performed on weekends or state-observed holidays.

3. DESCRIPTION OF WORK:

The work to be done under this Contract consists of the following:

1. Contractor shall facilitate the removal of all material located on an ODOT stockpile site on OR36, mile point 9.5. There is an estimated 3,000 cubic yards of debris to be removed under blackberries and roughly 1,800 cubic yards of wood chips to be disposed of or that may be burned if the contractor acquires the required burn permit(s). It is highly recommended that the Bidder visit the site to assess the quantity and material of debris to be removed.

The previously stated quantity is an estimate, but the contract will be paid for the http://www.oregon.gov/ODOT/HWY/SPECS/Pages/standard_specifications.aspx mailto:Wade.Powell@odot.state.or.us

Rev 01/2022 Page 6 of 24 removed of all material shown regardless of quantity. Vegetation makes material estimation difficult.

2. The contractor shall be fully responsible for debris pick-up, transportation of debris, and final debris disposal.

3. The contractor shall provide all management, supervision, labor, materials, and equipment necessary for the efficient and effective removal, disposal, and reduction of all debris.

4. The contractor is responsible for obtaining all necessary and applicable environmental and regulatory permits prior to commencing any debris removal or disposal activities. Copies of all documentation evidencing proper permitting and approval shall be provided to the ODOT inspector before any activities begin.

5. The contractor is responsible for payment of any and all landfill disposal fees necessary for proper final disposal of collected debris.

6. If applicable, prior to work contractor must fill out the “Permission to Place Fill Material on Non-ODOT Property” form in accordance with the Highway Division Maintenance Leadership Team Operational Notice MG-120, 181, dated March 18, 2013 (see Section 8 below for a copy of this form).

7. The contractor shall be responsible for dust control and all other environmental safeguards and protections as necessary. All such safeguards and protections shall comply with federal and state laws and regulations regarding same.

8. All debris shall be disposed in compliance with federal, state, or local laws, regulations, or guidelines providing for proper disposal of the particular type of debris.

9. The contractor shall be responsible for tracking quantities of materials removed from the site and will notify the project manager if measured quantities differ from the estimated ones provided in this solicitation.

4. TRAFFIC CONTROL:

No traffic control is required. Contractor is responsible for providing two “trucks entering highway” safety signs (one facing each direction of travel) on applicable highways or roadways during the work activity.

5. SPECIAL PROVISIONS:

1. Measurement and Payment: The contract price is paid on the Lump Sum basis for the removal of the material.

2. Removed debris will become the property of Contractor at the point of removal and must be disposed of in a manner satisfactory to the Project Manager.

3. Payment will be made only for bid items included per specifications. Payment for bid items removed will include all labor, equipment, materials, traffic control, mobilization, supervision, debris screening, and any other costs incidental to the work.

4. Project is considered complete after the ODOT Project Manager’s inspection and acceptance, as acknowledged by both parties on the “ODOT Compliance Checklist.”

Rev 01/2022 Page 7 of 24

6. MAP OF WORK LOCATIONS:

OR36 at Mile Point 9.5

Rev 01/2022 Page 8 of 24

7. PHOTOS:

Rev 01/2022 Page 9 of 24

Rev 01/2022 Page 10 of 24

8. PERMISSION TO PLACE FILL MATERIAL ON NON-ODOT PROPERTY:

Rev 01/2022 Page 11 of 24

Exhibit 2

RESERVED

Rev 01/2022 Page 12 of 24

Exhibit 3

GENERAL CONDITIONS AND SUPPLEMENTAL GENERAL CONDITIONS

This Request for Competitive Quotes and the resulting Contract for the ESB – OR36 MP 9.5 Stockpile Cleanup are governed by the STATE OF OREGON GENERAL CONDITIONS FOR PUBLIC IMPROVEMENT CONTRACTS, January 1, 2012 Edition (“General Conditions”) which, although not physically attached, is incorporated herein by reference as an Attachment with the same force and effect as though fully set forth herein:

http://www.oregon.gov/das/Procurement/Guiddoc/GenCon4PI.pdf

Supplemental General Conditions: The following supplements modify the General Conditions this project. Where a portion of the General Conditions is modified or deleted by these Supplemental General Conditions, the unaltered portions of the General Conditions shall remain in effect.

SGC-1 Add the following after A.3.4 under INTERPRETATION OF CONTRACT DOCUMENTS

A.3.5 The characterization of provisions of the Contract as material provisions or the failure to comply with certain provisions as a material breach of the Contract shall in no way be construed to mean that any other provisions of the Contract are not material or that failure to comply with any other provisions is not a material breach of the Contract.

A.3.6 Electronic Signatures. Contractor and Owner agree that signatures, and other forms of authorized representative certification, showing on documents, including but not limited to copies of the Contract, bonds, Change Orders and amendments, submitted or received via email or other electronic means, when submittal or receipt in that manner is required or allowed by Owner are “Electronic Signatures” under ORS Chapter 84 and bind the signing party and are intended to be and can be relied upon by the parties. Owner reserves the right at any time to require Contractor to deliver the hard copy originals of any documents.

SGC-2 Add the following after Section A.7 GOVERNMENT EMPLOYMENT STATUS:

A.8 TITLE VI NON-DISCRIMINATION PROVISIONS

During the performance of the Contract, Contractor, for itself, its assignees and successors in interest (hereinafter referred to as the “Contractor”) agrees as follows:

a. Compliance with Regulations: Contractor shall comply with the Regulations relative to nondiscrimination in Federally-assisted programs of the Department of Transportation Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time, (hereinafter referred to as the Regulations), which are herein incorporated by reference and made a part of the Contract.

b. Nondiscrimination: Contractor, with regard to the work performed by it during the Contract, shall not discriminate on the grounds or race, color, sex, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. Contractor shall not participate either directly or indirectly in the discrimination prohibited by section 21.5 of the Regulations, including employment practices when the Contract covers a program set forth in Appendix B of the Regulations.

c. Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all solicitations either by competitive bidding or negotiation made by Contractor for work to be http://www.oregon.gov/das/Procurement/Guiddoc/GenCon4PI.pdf

Rev 01/2022 Page 13 of 24 performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by Contractor of Contractor’s obligations under the Contract and the Regulations relative to nondiscrimination on the grounds of race, color, sex, or national origin.

d. Information and Reports: Contractor shall provide all information and reports required by the Regulations, or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by ODOT, FHWA or the Federal Transit Administration (“FTA”) as appropriate, to be pertinent to ascertain compliance with such Regulations, orders and instructions. Where any information required of Contractor is in the exclusive possession of another who fails or refuses to furnish this information, Contractor shall so certify to ODOT, FHWA or FTA as appropriate, and shall set forth what efforts it has made to obtain the information.

e. Sanctions for Noncompliance: In the event of Contractor’s noncompliance with the nondiscrimination provisions of the Contract, ODOT shall impose such Contract sanctions as ODOT, FHWA or FTA may determine to be appropriate, including, but not limited to:

(i) Withholding of payments to Contractor under the Contract until Contractor complies, and/or

(ii) Cancellation, termination or suspension of the Contract, in whole or in part.

f. Incorporation of Provisions: Contractor shall include the provisions of paragraphs (a) through (e) in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto. Contractor shall take such action with respect to any subcontract or procurement as ODOT of the federal government may direct as a means of enforcing such provisions including sanctions for non-compliance: Provided, however, that, in the event Contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of such direction, Contractor may request ODOT, and, in addition, Contractor may request the United States to enter into such litigation to protect the interests of the United States.

SGC-3 Make the following revisions to Section B.5 COMPLIANCE WITH GOVERNMENT LAWS AND

REGULATIONS:

• Add the following to the end of Section B.5.1:

All rights and remedies available to Owner under applicable federal, state and local laws are also incorporated by reference herein and are cumulative with all rights and remedies under the Contract.

• Delete Section B.5.2(a) and replace with the following:

(a) Pursuant to ORS 279A.110, Contractor shall not discriminate against a disadvantaged business enterprise, a minority-owned business, a woman-owned business, a business that a service-disabled veteran owns or an emerging small business, in the awarding of subcontracts.

• Add the following Section B.5.2(c):

(c) Compliance with ORS 279C.520 also includes (i) As required by ORS 279C.520, the Contractor must comply with ORS 652.220 and shall not unlawfully discriminate against any of Contractor’s employees in the payment of wages or other compensation for work of

Rev 01/2022 Page 14 of 24 comparable character on the basis of an employee’s membership in a protected class.

“Protected class” means a group of persons distinguished by race, color, religion, sex, sexual orientation, national origin, marital status, veteran status, disability, or age. The Contractor’s compliance with this section constitutes a material element of this Contract and a failure to comply constitutes a breach that entitles Agency to terminate this Contract for cause,

(ii) The Contractor shall not prohibit any of its employees from discussing the employee’s rate of wage, salary, benefits and other compensation with another employee or another person, and shall not retaliate against an employee who discusses the employee’s rate of wage, salary, benefits or other compensation with another employee or another person.

• Add the following Section B.5.2(d):

(d) Respecting certification as a disadvantaged business enterprise, minority-owned business, woman-owned business, business that a service-disabled veteran owns or an emerging small business under ORS 200.055, as and when applicable, the Contactor shall maintain the certifications, and require in its subcontracts that subcontractors maintain the certifications required by ORS 279A.107.

SGC-4 Delete Section B.15 GOVERNING LAW in its entirety and replace with the following:

B.15 GOVERNING LAW. This Contract shall be governed by and construed and enforced in accordance with the laws of the State of Oregon without regard to principles of conflicts of laws.

SGC-5 Add the following after Section D.3 CLAIMS REVIEW PROCESS

D.4 FALSE CLAIMS (OREGON FALSE CLAIMS ACT)

D.4.1 Contractor understands and acknowledges it is subject to the Oregon False Claims Act (ORS

180.750 to 180.785) and to any liabilities or penalties associated with the making of a false claim under that Act. By its execution of the Contract, Contractor certifies the truthfulness, completeness, and accuracy of any statement or claim it has made, it makes, it may make, or cause to be made that pertains to the Contract or the Project for which the services are being performed, including but not limited to Contractor’s statement of proposal and any invoices, reports, or other deliverables.

D.4.2. Contractor shall immediately disclose (in writing) to Agency whenever, in connection with the award, performance or closeout of the Contract, or any subcontract thereunder, Contractor has credible evidence that a principal, employee, agent, or subcontractor of Contractor has committed—

(i) A violation of the Oregon False Claims Act; or

(ii) A violation of State or Federal criminal or civil law involving fraud, conflict of interest, bribery, gratuity or similar misconduct.

D.4.3. Contractor must include subsections D.4.1 and D.4.2 of this section in each subcontract Contractor may award in connection with the performance of the Contract. In doing so, Contractor may not modify the terms of those subsections, except to identify the subcontractors or sub grantee that will be subject to those provisions.

http://www.leg.state.or.us/ors/180.html http://www.leg.state.or.us/ors/180.html

Rev 01/2022 Page 15 of 24

SGC-6 Section E.5 RETAINAGE is deleted in its entirety and replaced with the following:

E.5 RETAINAGE

E.5.1 Retainage, if withheld, shall be withheld and released in accordance with ORS 279C.550 to 279C.580.

E.5.1.1 Owner reserves the right in its sole discretion to withhold or to not withhold retainage from progress payments or to begin withholding retainage at any time. If Owner withholds retainage from progress payments the amount to be retained will not exceed five percent of the payment. Upon written application by the Contractor, including written approval of Contractor's surety, Owner may reduce the amount of the retainage and may eliminate retainage on any remaining progress payments after 50 percent of the Work under the Contract is completed if, in the Owner's opinion, such Work is progressing satisfactorily. Upon receipt of written application by the Contractor, Owner shall respond in Writing within a reasonable time. When the Work is 97-1/2 percent completed, the Owner may, at its discretion and without application by the Contractor, reduce the retained amount to 100 percent of the value of the Work remaining to be done.

E.5.1.2 If retainage is withheld and the Contractor elects, the Owner shall deposit the retainage in an interest-bearing account established through the State Treasurer, as provided under ORS 279C.560(5).

The Owner may recover from Contractor any additional costs incurred through such election by reducing Contractor's final payment.

E.5.1.3 In accordance with the provisions of ORS 279C.560 and any applicable administrative rules, the Contractor may submit and Owner shall accept the following alternative forms of retainage, unless the Owner rejects in writing the bonds, securities, or other instruments that the Contractor submits under subparagraph (a) or a surety bond that the Contractor submits under subparagraph (b), below, for good cause based on unique project circumstances

(a) bonds, securities or other instruments of equal value deposited with Owner or in a bank or other financial institution to be held in lieu of the cash retainage for the benefit of Owner. Interest or earnings on the bonds, securities or other instruments accrue to the Contractor. To be permissible the bonds, securities and other instruments must be of a character approved by the Director of the Oregon Department of Administrative Services, including but not limited to:

(i) Bills, certificates, notes or bonds of the United States.

(ii) Other obligations of the United States or agencies of the United States.

(iii) Obligations of a corporation wholly owned by the federal government.

(iv) Indebtedness of the Federal National Mortgage Association.

(v) General obligation bonds of the State of Oregon or a political subdivision of the State of Oregon.

(vi) Irrevocable letters of credit issued by an insured institution, as defined in ORS 706.008;

or

(b) a surety bond for the benefit of Owner, for all or a portion of funds retained, or to be retained, by Owner in substantially the form specified in ORS 701.435(4) (See ORS 279C.560(7); House Bill 4006, 82nd Oregon Legislative Assembly (2024)). A surety bond submitted under this paragraph must be executed by a surety bonding company that is authorized to transact surety business in this state and may not be a surety obligation of an individual. Such bond and any proceeds therefrom shall be made subject to all claims and liens in the manner and priority as set forth for retainage under ORS 279C.550

Rev 01/2022 Page 16 of 24 to ORS 279C.570 and ORS 279C.600 to ORS 279C.625. The Owner shall reduce the moneys the Owner holds as retainage in an amount equal to the value of the surety bond and pay the amount of the reduction to the Contractor in accordance with ORS 279C.570 (House Bill 4006, 82nd Oregon Legislative Assembly (2024)).

E.5.1.3.1 Where the Owner has accepted the Contractor's election of option E.5.1.3 subparagraphs (a) or (b) above, Owner may recover from Contractor the additional costs incurred through such election by reducing Contractor's final payment.

E.5.1.3.2 When the Owner accepts a surety bond in lieu of retainage from the Contractor under option E.5.1.3 (b), Contractor shall accept surety bonds from Subcontractors and suppliers on the project from which Contractor has withheld retainage. At any time before final payment, a Subcontractor may submit a surety bond to Contractor and request that the Contractor submit, in a manner provided under ORS 279C.560(7) (House Bill 4006, 82nd Oregon Legislative Assembly (2024)), a surety bond to Owner for the portion of the Contractor’s retainage that pertains to the Subcontractor. When a Contractor at a Subcontractor’s request obtains and submits to the Owner a surety bond under this subsection, the Contractor may withhold from payments to the Subcontractor an amount equivalent to the portion of the Contractor’s surety bond premium for which the Subcontractor is responsible.

Within 30 days of Contractor’s request under this paragraph, Contractor shall provide and Owner shall accept such surety bond, unless Owner finds good cause in writing to reject the surety bond base on unique project circumstances, the surety bond is not commercially available, or the subcontractor refuses to pay to the contractor the subcontractor’s portion of the surety bond premium or refuses to provide the contractor with a surety bond that meets the requirements of subsection E.5.1.3(b). Within 30 days of receiving ta surety bond under this paragraph, the Owner shall release to the Contractor an amount the Owner holds as retainage that is equivalent to the amount the contractor submitted as a surety bond. Contractor shall comply with all applicable requirements under ORS 279C.560(8), including subsection (b), regarding timely submission to Owner a surety bond after Subcontractor’s request, and subsection (e), regarding release of amounts held as retainage to Subcontractor after receipt of a surety bond (House Bill 4006, 82nd Oregon Legislative Assembly (2024)).

E.5.1.4 In accordance with the provisions of ORS 279C.560, if the Owner accepts bonds, securities or other instruments deposited as provided in paragraph (a) of subsection E.5.1.3, the Owner shall reduce the moneys held as retainage in an amount equal to the value of the bonds, securities and other instruments and pay the amount of the reduction to the Contractor in accordance with ORS 279C.570.

E.5.1.5 The retainage held by Owner shall be included in and paid to the Contractor as part of the final payment of the Contract Price. The Owner shall pay to Contractor interest at the rate of one and one-half percent per month on the final payment due Contractor, interest to commence thirty (30) Days after the Work under the Contract has been completed and accepted and to run until the date Contractor shall notify Owner in Writing when the Contractor considers the Work complete and Owner shall, within fifteen (15) Days after receiving the written notice, either accept the Work or notify the Contractor of Work yet to be performed on the Contract. If Owner does not, within the time allowed, notify the Contractor of Work yet to be performed to fulfill contractual obligations, the interest provided by this subsection shall commence to run thirty (30) Days after the end of the 15-Day period.

E.5.1.6 Contractor agrees that if Contractor elects to reserve retainage from any progress payment due to any Subcontractor or supplier, such retainage shall not exceed five percent of the payment, and such retainage withheld from Subcontractors and suppliers shall be subject to, and the Contractor shall

Rev 01/2022 Page 17 of 24 comply, with all applicable legal requirements, including but not limited to those in ORS Chapters 279C and 701, and 49 CFR 26.29.

E.5.2 As provided in Sections C.2.2 and C.2.3, additional withholding in the amount of 25% of amounts earned shall be withheld and released in accordance with ORS 279C.845(7) when the Contractor fails to file certified statements as required by Section C.2.1.

SGC-7 Add the following at the end of Section E PAYMENTS:

E.7 REPORT OF SUBCONTRACTORS PAID: Following each payment to Contractor, including final payment and any progress payments, Contractor shall submit to the Owner ODOT Form 734-2882, Paid Summary Report. Contractor shall complete and submit the form as specified in the form instructions, which are available online, along with the form at: http://www.oregon.gov/ODOT/Forms/2ODOT/2882.pdf

SGC-8 Amend the first sentence of Section G.2.1 as follows (deletions shown in strikethrough):

G.2.1 When the Contract Price is $100,000 or more (or $50,000 or more in the case of Contracts for highways, bridges and other transportation projects) the Contractor shall furnish and maintain in effect at all times during the Contract Period a performance bond in a sum equal to the Contract Price, and a separate payment bond also in a sum equal to the Contract Price.

SGC-9 Delete Section G.3 INSURANCE in its entirety and replace with the following:

G.3 INSURANCE

G.3.1 Contractor: The Contractor shall obtain the insurance specified below prior to the execution of the Contract. The Contractor shall maintain the insurance in full force at the Contractor’s expense throughout the duration of the Contract and all warranty periods that apply.

G.3.1.2 Subcontracting: If the Contractor specifies prior to the execution of the Contract that a

Subcontractor will satisfy an insurance requirement, that is permitted to be satisfied by a Subcontractor, the Contractor shall obtain Owner approval of Subcontractor and Subcontractor’s insurance coverage(s), at least 35 Calendar Days prior to commencement of subcontracted work.

After the Contractor receives Owner approval of the Subcontractor, the Contractor may contractually obligate the Subcontractor to obtain and maintain, at the Subcontractor's expense or at the Contractor's expense, the insurance permitted.

G.3.1.3 The Contractor shall require that all Subcontractors carry insurance coverage that the Contractor deems appropriate based on the risks of the subcontracted work. The Contractor shall obtain proof of the required insurance coverages, as applicable, from any Subcontractor providing services related to the Contract.

G.3.1.4 Neither the insurance provided by Subcontractor(s) nor any agreements Contractor or

Subcontractor(s) may enter into shall place any limitation on the liability or indemnification obligations of the Contractor under applicable law or the Contract.

G.3.1.5 Insurance Provisions: The Contractor and Subcontractor(s), if any, shall obtain insurance from insurance companies or entities that are authorized to transact the business of insurance and http://www.oregon.gov/ODOT/Forms/2ODOT/2882.pdf

Rev 01/2022 Page 18 of 24 issue coverage in the State and that are acceptable to Owner. Insurance coverage shall be primary and noncontributory with any other insurance and self-insurance, with the exception of Workers’ Compensation/Employer’s Liability. The Contractor, or appropriate Subcontractor, but not Owner, shall pay for all deductibles, self-insurance retentions and self-insurance, if any.

G.3.2 Workers' Compensation and Employer’s Liability:

G.3.2.1 All employers, including the Contractor and Subcontractor(s), if any, that employ subject workers, as defined in ORS 656.027, shall comply with ORS 656.017 and shall provide Workers’ Compensation Insurance coverage, unless such employers meet the requirement for an exemption under ORS 656.126(2). The coverage shall include Employer’s Liability Insurance with coverage limits of not less than $500,000 for each accident. Contractors who perform the Work without the assistance or labor of any employee need not obtain such coverage if the Contractor certifies so in writing. Contractor shall ensure that each of its Subcontractors complies with these requirements. The Contractor shall require proof of such Workers’ Compensation by receiving and keeping on file a certificate of insurance from each Subcontractor or anyone else directly employed by either the Contractor or its Subcontractors.

G.3.2.2 All employers, including the Contractor and Subcontractor(s), if any, exempt under

ORS 656.126(2) and subject to any other state’s Workers’ Compensation law, shall provide Workers’ Compensation Insurance coverage as required by applicable Workers’ Compensation laws. The coverage shall also include Employer’s Liability Insurance with limits not less than $500,000 each accident.

G.3.3 Liability Insurance:

G.3.3.1 Commercial General Liability: The Contractor shall obtain, at Contractor's expense, and keep in effect during the term of this Contract, Commercial General Liability Insurance written on an occurrence basis and covering bodily injury and property damage. This insurance shall include personal and advertising injury liability, products and completed operations, and contractual liability coverage. When Work to be performed includes operations or activity within 50 feet of any railroad property, bridge, trestle, track, roadbed, tunnel, underpass or crossing, the Contractor shall provide the Contractual Liability – Railroads CG 24 17 endorsement, or equivalent, on the Commercial General Liability policy. Combined single limit per occurrence shall not be less than the dollar amount specified in the Contract. The annual aggregate limit shall not be less than the dollar amount specified in the Contract.

Per Occurrence Annual Aggregate Commercial General Liability

$1,000,000 $2,000,000

G.3.3.2 Commercial Automobile Liability: The Contractor shall obtain, at Contractor's expense, and keep in effect during the term of this Contract, Automobile Liability Insurance covering owned, non-owned, and hired vehicles for bodily injury and property damage. This coverage may be written in combination with the Commercial General Liability Insurance with separate limits for Commercial Automobile Liability and Commercial General Liability. Combined single limit per occurrence shall not be less than the dollar amount specified in the Contract.

Rev 01/2022 Page 19 of 24

Combined Single Limit Per Occurrence

Commercial Automobile Liability

$1,000,000

G.3.3.3 Extended Reporting: If any of the required liability insurance is permitted to be and is on a

"claims made" basis, the Contractor or Subcontractor who provided the insurance coverage, shall obtain an extended reporting period on the claims made policy or maintain the claims made policy for a duration of at least 24 months from the date the applicable work has been completed and accepted by Owner or the date of Final Completion. This extended reporting requirement shall be satisfied with documentation of one of the following:

o Maintaining the applicable continuous claims made policy with liability coverage;

o Extended Reporting Endorsement; or o Tail Coverage.

G.3.3.4 Excess/Umbrella Liability: A combination of primary and Excess/Umbrella Liability insurance may be used to meet the required limits of insurance. Excess/Umbrella Liability coverage must be at least as broad as that provided by the underlying primary insurance policies. In addition, the limits of the underlying primary insurance must be sufficient to prevent any gap between such minimum limits and the attachment point of the coverage provided by the Excess/Umbrella Liability policy.

G.3.3.5 Additional Insured: The liability insurance coverages, except Professional Liability and Workers’

Compensation/Employer’s Liability, if included, shall include an Additional Insured Endorsement endorsing the “State of Oregon, the Oregon Transportation Commission and the Department of Transportation, and their respective officers, members, agents, and employees” as Additional Insureds, but only with respect to the Contractor's activities to be performed under this Contract. Coverage shall be primary and non-contributory with any other insurance and self-insurance. The liability coverages that are permitted by Owner to be obtained by an appropriate Subcontractor shall include all of the foregoing as Additional Insureds and shall also include the Contractor and its officers and employees as Additional Insureds. Additional Insured Endorsements shall be submitted with the Certificate(s) of Insurance and must be acceptable to Owner.

G.3.3.6 Additional Insured – Commercial General Liability: Additional Insured Endorsements on the

Commercial General Liability shall be written on ISO Form CG 20 10 07 04, or equivalent, with respect to liability arising out of ongoing operations and ISO Form CG 20 37 07 04, or equivalent, with respect to liability arising out of completed operations. Additional Insured Endorsements shall be submitted with the Certificate(s) of Insurance and must be acceptable to Owner.

G.3.3.7 Notice of Cancellation or Change: The Contractor shall provide at least 30 Calendar Days written notice to Owner before cancellation of, material change to, potential exhaustion of aggregate limits, or non-renewal of the required insurance coverages. If a Subcontractor is providing insurance to meet the contract requirements, the Contractor shall provide at least 30 Calendar Days written notice to Owner before cancellation of, material change to, potential exhaustion of

Rev 01/2022 Page 20 of 24 aggregate limits, or non-renewal of the required insurance coverage(s). Any failure to comply with the reporting provisions of this insurance shall not affect the coverage(s) provided to the State, Owner, County, City, or other applicable political jurisdiction or to Owner's governing body, board, or Commission and its members, and Owner's officers, agents, and employees.

G.3.3.8 Certificate(s) of Insurance: As evidence of the insurance coverages required by this Contract, the Contractor shall furnish Certificate(s) of Insurance to Owner prior to execution of the Contract. As evidence of insurance coverages required by the Contract but permitted by Owner to be obtained by an appropriate Subcontractor, the Contractor shall furnish Certificate(s) of Insurance to Owner for approval on such coverages at least 35 Calendar Days prior to commencement of subcontracted work. The Certificate(s) shall:

• List the “State of Oregon, the Oregon Transportation Commission and the Department of

Transportation, and their respective officers, members, agents and employees” as a Certificate Holder and endorse as an Additional Insured;

• Include all required endorsements or copies of the applicable policy language effecting coverage required by the Contract;

• Specify that all liability insurance coverages shall be primary and non-contributory with any other insurance and self-insurance, with exception of Professional Liability and Workers’ Compensation/Employer’s Liability; and

• Include a list of all policies that fall under the Excess/Umbrella Liability insurance if Excess/Umbrella Liability insurance is used to meet the minimum insurance requirement.

G.3.3.9 Owner Acceptance: All insurance and insurance providers are subject to Owner acceptance. In addition, all of the following are subject to Owner acceptance and, if requested by Owner, the Contractor shall provide complete copies of the following to Owner’s representatives responsible for verification of the insurance coverages required by the Contract: insurance policies, endorsements, self-insurance documents and related insurance documents.

G.3.3.10 Insurance Requirement Review: The Contractor agrees to periodic review of insurance requirements by Owner under the Contract and to provide updated requirements as mutually agreed upon by the Contractor and Owner.

G.3.4 Builder’s Risk Insurance and Builder’s Risk Installation Floater (RESERVED – NOT REQUIRED FOR THIS

PROJECT)

SGC-10 Add the following at the end of Section H.2 SCHEDULE:

H.2.2 The Project Work schedule is essential to the Owner. The Contractor’s failure to provide the schedule, schedule information, progress reports, or schedule updates when required will be cause to suspend the Work, or to withhold Contract payments as necessary to protect the Owner, until the Contractor provides the required information to the Owner’s Authorized Representative.

SGC-11 Add a new subsection to Section J.4.1 as subsection (f) and renumber existing subsection (f) as subsection (g) as follows:

Rev 01/2022 Page 21 of 24

(f) If Contractor has liquidated and delinquent debt owed to the State of Oregon or any department or agency of the State of Oregon;

(g) If Contractor is otherwise in material breach of any part of the Contract.

SGC-12 Delete Section J.4.2 in its entirety and replace it with the following:

J.4.2 At any time that any of the above occurs, Owner may exercise all rights and remedies available to Owner at law or in equity, including, in the event of the conditions set forth in Section J.4.1 (f) regarding Contractor’s liquidated and delinquent debt, by offset or garnishing all monies due for any and all Work performed by the Contractor when appropriate, and otherwise recovering any liquidated and delinquent debt owed to the State of Oregon or any department or agency of the State of Oregon. In addition, Owner may take possession of the premises and of all materials and appliances and finish the Work by whatever method it may deem expedient. In such case, Contractor shall not be entitled to receive further payment until the Work is completed. If Owner’s cost of finishing the Work exceeds the unpaid balance of the Contract Price, Contractor shall pay the difference to the Owner.

SGC-13 Add the following Section J.4.3 to Section J.4 OWNER’S RIGHT TO TERMINATE CONTRACT:

If a termination under this Section J.4 is determined by a court of competent jurisdiction to be unjustified, the termination shall be deemed a termination for convenience. (See Section J.5 TERMINATION FOR

CONVENIENCE.)

SGC-14 Add the following at the beginning of Section K CONTRACT CLOSEOUT:

As a condition of final payment, Contractor shall complete and sign the Contract Closeout Checklist form provided by Owner. If accepted by Owner, Contractor’s delivery of the certification as required in K.3 of the Checklist will be deemed to be compliance with the requirements of Section K.3 below and Contractor’s delivery of the information required in K.7 of the Checklist will be deemed to be compliance with the requirements of Section K.7 below.

SGC-15 Delete Section K.4.1 and replace with the following:

K.4.1 Contractor shall provide Owner notice of Substantial Completion. The notice of Substantial Completion shall state the date of Substantial Completion, and shall be submitted to the Owner’s Authorized Representative. The notification may be communicated verbally to the Owner’s Authorized Representative, sent electronically via email, or sent as a hard copy in the mail. Upon receipt of notification of Substantial Completion, the Owner’s Authorized Representative will perform a final project inspection and provide the Contractor with the project Punchlist, which shall also serve as the Owner’s written notice of Substantial Completion. Once all Punchlist items have been completed to the satisfaction of the Owner’s Authorized Representative, the Owner’s Authorized Representative will provide Contractor with a Contract Closeout Checklist form. Contractor shall complete and sign the form and submit it to the Owner’s Authorized Representative. The Owner’s Authorized Representative will provide the final signature on the form upon which date Final Completion shall take effect.

Rev 01/2022 Page 22 of 24

Exhibit 4

CONTRACT CLOSEOUT COMPLIANCE CHECKLIST

Contract Number Contract Name Contractor Owner Authorized Rep.

This checklist is intended to assist Agency and Contractor in complying with the Contract Closeout and Final Payment requirements in the General Conditions for Public Improvement Contracts, Sections K and E.6 : http://www.oregon.gov/das/Procurement/Guiddoc/GenCon4PI.pdf

Owner will mark “NA” by any requirement that is not applicable to the Contract. Contractor’s and Owner’s Authorized Representatives shall place their initials by each requirement listed below that has not been marked “NA” by Owner, and provide a signature at the end of the Checklist.

ODOT: Keep a copy of the signed form in the Contract Administration file. Email a copy to the ODOT Procurement Office. For ESB contracts, also email a copy to your Office of Civil Rights Field Coordinator.

Requirements Mark NA if not applicable

Date completed

Contractor initials

Owner initials

K.1 Record Documents submitted

K.2 O & M Manuals submitted

K.3 Certification/Release of Claims

By Contractor’s signature below, Contractor certifies and agrees to the following:

All Subcontractors and suppliers have been paid in full or will be paid in full out of the final payment, and in compliance with all prompt payment requirements. All disputes with property owners have been resolved, all obligations on the project have been satisfied, all monetary claims and indebtedness have been paid, and, to the best of the Contractor's knowledge, there are no claims of any kind outstanding against the project.

http://www.oregon.gov/das/Procurement/Guiddoc/GenCon4PI.pdf

Rev 01/2022 Page 23 of 24

K.4 Completion notices submitted

Substantial Completion notice Date of substantial completion:

Final Completion notice Date of final completion:

K.5 Training sessions scheduled

K.6 Extra materials provided (List individually):

K.7. Environmental Clean-up:

Contractor hereby notifies Owner that all environmental cleanup that was performed as a part of this contract has been disposed of in accordance with all applicable rules, regulations, laws, and statutes of all agencies having jurisdiction over such environmental pollution.

K.8 Certificate of Occupancy received by Owner

K.9 Other Contractor Responsibilities (List individually):

E.6 Contractor’s final payment request submitted

Final payment request approved by Owner

CONTRACTOR’S AUTHORIZED REPRESENTATIVE:

Printed Name Title

Signature Date

Rev 01/2022 Page 24 of 24

OWNER’S AUTHORIZED REPRESENTATIVE:

Printed Name Title

Signature Date

ATTACHMENT A –SAMPLE AGREEMENT FORM
WITNESSETH:
1. Contract Price, Contract Documents and Work.
2. Representatives.
4. Liquidated Damages.
5. Certifications.
(a) Reserved.
(b) Contractor certifies that Contractor has no undisclosed liquidated and delinquent debt owed to the State or any department or agency of the State.
(c) Contractor certifies that all subcontractors performing Work described in ORS 701.005(2) (i.e., construction Work) will be registered with the Oregon Construction Contractors Board or licensed by the Oregon State Landscape Contractors Board in acc...
(d) Contractor certifies that it is certified by the State of Oregon as an “Emerging Small Business” per the guidelines of the Certification Office for Business Inclusion and Diversity (“COBID”), that it will comply with all requirements of the Emerg...

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .