This file is a preliminary bid tabulation for ITB No. S-73000-00010655 issued by an Oregon jurisdiction on June 24, 2024, for pavement repair work on US30BY between mile posts 1.31 and 1.33. The project encompasses multiple bid items including mobilization, temporary work zone traffic control, cold plane pavement removal at two depths, asphalt concrete placement (Level 4, PG70-22ER, 1/2 inch dense), thermoplastic line marking, pavement bar installation, and loop detector installation. The estimated quantities include 1 mobilization lump sum, 1 traffic control lump sum, 180 square yards of primary cold plane removal, 180 square yards of secondary cold plane removal, 38 tons of asphalt concrete, 20 linear feet of thermoplastic marking, 50 square feet of pavement bar, and 1 loop detector installation package comprising 4 units. Seven contractors submitted bids by the June 24, 2024 closing date: Brix Paving, Northwest Granite Construction Company, Kodiak Pacific Construction, Brown Contracting, KNL Industries, Wildish Standard Paving, and TFT Construction.
Total bid prices ranged from $46,690.00 to $147,650.00, with Brix Paving submitting the lowest bid at $46,690.00 and TFT Construction submitting the highest at $147,650.00. The tabulation notes that this bid summary is not an indicator of award but merely a compilation of submitted bids for consideration. Individual line item pricing varied significantly among bidders, particularly for mobilization costs ranging from $5,450.00 to $60,000.00 and traffic control costs ranging from $7,200.00 to $88,000.00. No information regarding set-asides, incumbent contractors, funding sources, or contract term details is provided in this preliminary bid results document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OregonBuys Posting Page_Notice~1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 6/24/24 | ||||||||
| ITB No. | S-73000-00010655 | BIDDER | |||||||
| NAME: | Brix Paving Northwest | Granite Construction Company | Kodiak Pacific Construction | Brown Contracting | KNL Industries | Wildish Standard Paving | TFT Construction | ||
| Bid Closing: | June 24, 2024 | CITY/STATE: | |||||||
| Description: | US30BY MP 1.31-1.33 Pavement Repair | CCB#: | |||||||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | Mobilization | 1 | LS | $ 7,000.00 | $ 7,000.00 | $5,450.00 | $ 5,450.00 | $15,000.00 | $ 15,000.00 | $ 9,500.00 | $ 9,500.00 | $20,000.00 | $ 20,000.00 | $60,000.00 | $ 60,000.00 | $15,000.00 | $ 15,000.00 |
| 2 | Temproary Work Zone Traffic Control, Complete | 1 | LS | $ 10,000.00 | $ 10,000.00 | $10,000.00 | $ 10,000.00 | $26,300.00 | $ 26,300.00 | $ 7,200.00 | $ 7,200.00 | $25,000.00 | $ 25,000.00 | $27,527.00 | $ 27,527.00 | $88,000.00 | $ 88,000.00 |
| 3 | Cold Plane Pavement Removal, 2 inches deep | 180 | SQYD | $ 20.00 | $ 3,600.00 | $40.00 | $ 7,200.00 | $44.45 | $ 8,001.00 | $ 98.00 | $ 17,640.00 | $75.00 | $ 13,500.00 | $65.00 | $ 11,700.00 | $50.00 | $ 9,000.00 |
| 4 | Secondary Cold Plane Pavement Removal, 2 inches deep | 180 | SQYD | $ 20.00 | $ 3,600.00 | $10.00 | $ 1,800.00 | $12.00 | $ 2,160.00 | $ 30.00 | $ 5,400.00 | $50.00 | $ 9,000.00 | $10.00 | $ 1,800.00 | $10.00 | $ 1,800.00 |
| 5 | Level 4, PG70-22ER, 1/2 Inch Dense ACP | 38 | TON | $ 330.00 | $ 12,540.00 | $650.00 | $ 24,700.00 | $500.00 | $ 19,000.00 | $ 828.00 | $ 31,464.00 | $750.00 | $ 28,500.00 | $725.00 | $ 27,550.00 | $600.00 | $ 22,800.00 |
| 6 | Thermoplastic, Extruded or Pre-formed, Surface, Profiled | 20 | LF | $ 35.00 | $ 700.00 | $100.00 | $ 2,000.00 | $35.00 | $ 700.00 | $ 115.00 | $ 2,300.00 | $300.00 | $ 6,000.00 | $75.00 | $ 1,500.00 | $75.00 | $ 1,500.00 |
| 7 | Pavement Bar, Type B-HS | 50 | SQFT | $ 25.00 | $ 1,250.00 | $50.00 | $ 2,500.00 | $21.00 | $ 1,050.00 | $ 55.00 | $ 2,750.00 | $100.00 | $ 5,000.00 | $55.00 | $ 2,750.00 | $55.00 | $ 2,750.00 |
| 8 | Loop Detector Installation, Qty 4 | 1 | LS | $ 8,000.00 | $ 8,000.00 | $3,800.00 | $ 3,800.00 | $4,400.00 | $ 4,400.00 | $ 11,720.00 | $ 11,720.00 | $10,000.00 | $ 10,000.00 | $10,000.00 | $ 10,000.00 | $6,800.00 | $ 6,800.00 |
| TOTAL | $ 46,690.00 | $ 57,450.00 | $ 76,611.00 | $ 87,974.00 | $ 117,000.00 | $ 142,827.00 | $ 147,650.00 |