00004999_Att D_Quantities for Info Only.pdf
PDF 111 KB Posted
- Attached to
- 2022. 254 Aid and Assist Supported Housing.
- Solicitation number
- S-C03342-00004998
- Issued by
- Washington County, Oregon
About this file
This file is a bid quantity sheet for Marion County, Oregon's D3 Single Function ADA Ramp Repair project scheduled for 2022 across various highways. The project encompasses ADA ramp repairs and related site improvements at six locations along Highway 214 and Highway 213, including intersections at Hillsboro-Silverton Highway 214 & C Street, Park Street, High Street, Cascade Highway 213 & Steelhammer Road, Silver Creek Falls Highway, and Jersey Street. The work involves removal of existing curb ramps, curbs, walks, and surfacing, with contractors responsible for asphalt pavement saw cutting, adjusting boxes and inlets, grinding lips, installing concrete curbs and walks with truncated domes, and inlet protection. The bid items total 108 square yards of curb ramp removal, 169 linear feet of curb work, one asphalt pavement saw cut, one box adjustment, ten feet of inlet adjustments, 34 square yards of grinding, 47 linear feet of asphalt concrete pavement repair, 72 square feet of concrete curbs (standard), 434 square feet of concrete curbs and gutter, 22 square feet of concrete walks, 32 each of truncated domes, and two each of pavement bar type B-HS with inlet protection. The document explicitly states that this sheet is information only and is not part of the official bid package, with contractors responsible for determining actual quantities required for their bids.
No specific pricing terms, set-asides, incumbent information, or funding sources are detailed in this quantities reference document. The sheet serves solely as a planning guide for potential bidders to understand the scope and anticipated materials across the six project locations, allowing contractors to develop accurate cost estimates based on their assessment of actual work requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2022.254 Legal Ad.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS SHEET IS NOT PART OF THE BID PACKAGE. The bid items and quantities are information only. Contractor is responsible for items and quantities used to prepare a bid for this work.
Bid Item Code 310-0106100J 0310-0119000F 0490-0100000E 0490-0105000E 0748-0103000J 0759-0110000F 0759-0103000F 0759-0128000J 0759-0510000J 0867-0145100J 0280-01140
Intersection
REMOVAL CURB RAMP,
CURB, WALK,
SURFACING
ASPHALT
PAVEMENT SAW
CUTTING
ADJUSTING
BOXES
ADJUSTING
INLETS
GRIND LIP
6 INCH ASPHALT
CONCRETE
PAVEMENT REPAIR
CONCRETE
CURBS,
STANDARD
CURB
CONCRETE
CURBS, CURB
AND GUTTER
CONCRETE
WALKS
TRUNCATED
DOMES ON NEW
SURFACES
PAVEMENT BAR,
TYPE B-HS
INLET
PROTECTION
SQYD FOOT EACH EACH FOOT SQYD FOOT FOOT SQFT SQFT SQFT EACH
MP 50.24 - Hillsboro-Silverton Hwy
214 & C St
Corner 4 ramp 1 43 56 1 1 0 14 0 39 145 0 12 1
MP 50.55 - Hillsboro-Silverton Hwy
214 & Park St
Corner 4 ramp 2 6 15 0 0 0 2 5 0 26 12 0 0
MP 50.59 - Hillsboro-Silverton Hwy
214 & High St
Corner 1 ramp 1 8 24 0 0 0 4 0 16 0 0 0 0
MP 28.99 - Cascade Hwy 213 &
Steelhammer Rd
Corner 4 ramp 1 & Corner 4 ramp2 34 49 0 0 10 10 42 0 191 10 2 1
MP 39.92 - Silver Creek Falls Hwy end of sidewalk
Corner 4 ramp 1 8 0 0 0 0 0 0 0 72 0 0 0
MP 40.81 - Silver Creek Falls Hwy &
Jersey St
Corner 4 ramp 1 9 25 0 0 0 4 0 17 0 0 18 0
TOTALS 108 169 1 1 10 34 47 72 434 22 32 2
D3 Single Function ADA Ramp Repair 2022
Various Highways
Marion County