0000_Work_Item_Index_Report_ASD_VR.pdf
PDF 350 KB Posted
- Solicitation number
- N6264926RL018
About this file
This is an MSC Corrective Maintenance Engineering Report for the USNS SHEPARD (TAKE 3), identified as work order SN26-026 with a VRA (Vessel Repair Activity) completion date of May 31, 2026. The document presents a Work Item Index Report listing corrective maintenance tasks organized by ship system category.
The maintenance work encompasses nine major system sections: General Services and Requirements (9 items), Hull and Structural (1 item), Propulsion Machinery (1 item), Electrical (3 items), Communication and Navigation (1 item), Auxiliary Machinery (4 items), Habitability Outfitting and Furnishings (2 items), HVAC (1 item), and Drydocking (1 item), totaling 23 work items. General services items include scope development, technical specifications, berthing and mooring approach, high voltage electrical safety, heavy weather planning, general ship services, integrated project planning, vessel delivery and redelivery, and gas-free certification. Specific maintenance tasks include Station 7 gooseneck renewal, main engine industrial support, degaussing system inspection, motor rewinding, anemometer adjustments, plate cooler refurbishment and overhaul, seawater drain pipe repairs, stateroom deck renewal, deck tile replacement, aviation duct repair, and propeller cleaning and polishing with hull work. Work items are categorized as either NSP (Non-Standard Planning) or A (standard category), with NSP items representing non-standard planning requirements for general services and compliance items.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Print Date: 04/23/2026
MSC Corrective Maintenance
Engineering Report
USNS SHEPARD
(TAKE 3)
SN26-026
2026-05-31 - VRA
WORK ITEM INDEX REPORT
Item Number Title Category
SECTION 0000 GENERAL SERVICES AND REQUIREMENTS
0001 TAKE-SWI-SCOPE GENERAL REQUIREMENTS AND NSP
0002 TAKE-SWI-TECHNICAL AND MANUFACTURERS NSP
0003 TAKE-SWI-APPROACH BERTHING AND MOORING NSP
0005 TAKE-SWI-HIGH VOLTAGE ELECTRICAL SAFETY NSP
0006 TAKE-SWI-HEAVY WEATHER PLAN NSP
0011 TAKE-SWI-GENERAL SERVICES FOR SHIP A
0013 TAKE-SWI-INTEGRATED PROJECT PLANNING AND A
0018 TAKE-SWI-DELIVERY AND REDELIVERY OF THE VESSEL A
0020 TAKE-SWI-GAS FREE CERTIFICATES A
SECTION 0100 HULL AND STRUCTURAL
0193 Station 7 Gooseneck Renewal A
SECTION 0200 PROPULSION MACHINERY
0255 TAKE-CCSI-INDUSTRIAL SUPPORT FOR MAIN ENGINE A
SECTION 0300 ELECTRICAL
0302 DEGAUSSING SYSTEM INSPECTION AND A
0304 HRG Replacement A
0305 Various Motor Rewind A
SECTION 0400 COMMUNICATION AND NAVIGATION
0402 Ship's Anemometer Adjustments A
SECTION 0500 AUXILIARY MACHINERY
0501 HT Chill Water Plate Cooler Refurbishment A
0502 Fabricate Temporary Spare Seachest Strainer Baskets A
0551 TAKE-CCSI-OVERHAUL PLATE COOLERS (10 YR) A
0592 CBRD Clip Re-configure A
Print Date: 04/23/2026
MSC Corrective Maintenance
Engineering Report
0598 LTFW 2 & 3 Seawater Drain Pipe Repairs A
SECTION 0600 HABITABILITY OUTFITTING AND FURNISHINGS
0603 Stateroom head Deck Renewal A
0660 TAKE-CCSI-DECK TILE REPLACEMENT A
SECTION 0800 HVAC
0801 Aviation Spaces Duct Repair A
SECTION 0900 DRYDOCKING
0958 TAKE-CCSI-PROPELLER CLEAN AND POLISH AND HULL A
File details come from the government source that posted it. Updated .