| CRIP Main Canal Check Structures | SECTION 00 41 10 |
| La Paz County, Arizona | PRICING SCHEDULE |
The Bid for the following items will be a unit price or lump sum Bid as indicated for each item for all Work described in the Contract Documents. Quantities indicated for unit price Bid items are estimates only.
CLIN 1 – CRIP MC185 and MC270 Check Rehabilitation
| Item No. |
| Description |
| Est. Quantity |
| Unit |
| Unit Price |
| Bid Amount |
| 101 |
| Mobilization and Preparatory Work |
| 1 |
| LS |
| 103 |
| Repair to Concrete Check Structures |
| 1 |
| EA |
| 104 |
| Install Contractor-furnished Radial Gates and Appurtenances at MC185 |
| 1 |
| LF |
| 105 |
| Install Contractor-furnished Radial Gates and Appurtenances at MC270 |
| 1 |
| LF |
| 106 |
| Install Owner Furnished Lateral Gates and Appurtenances at MC185 |
| 1 |
| EA |
| 107 |
| Install Contractor Furnished Lateral Gates and Appurtenances at MC270 |
| 1 |
| LS |
| 108 |
| Pipe Railings and Miscellaneous Metals |
| 1 |
| LS |
| 109 |
| Control Buildings |
| 1 |
| LS |
| 110 |
| Electrical Equipment and Control Systems |
| 1 |
| LS |
| 111 |
| Fencing, Signage, and Gates |
| 1 |
| LS |
| 113 |
| Stainless Steel Stop Logs |
| 1 |
| LS |
| 115 |
| Road Resurfacing and Widening |
| 1 |
| LS |
Total of all unit price CLIN 1 items
CLIN 2 – Contractor-furnished MC420 Radial Gate
| Item No. |
| Description |
| Est. Quantity |
| Unit |
| Unit Price |
| Bid Amount |
| 201 |
| Contractor-furnished MC420 Radial Gate and Appurtenances |
| 1 |
| LS |
Total of all unit price CLIN 2 items
CLIN 3 – CRIP MC420 Check Replacement
| Item No. |
| Description |
| Est. Quantity |
| Unit |
| Unit Price |
| Bid Amount |
| 301 |
| Mobilization and Preparatory Work |
| 1 |
| LS |
| 302 |
| Water Control and Construction Dewatering |
| 1 |
| LS |
| 304 |
| Drain Ditch Pipe Culverts |
| 1 |
| LF |
| 305 |
| Structure Excavation, Foundation Improvements, and Backfill |
| 1 |
| LF |
| 306 |
| Canal Subgrade Preparation and Foundation Improvements |
| 1 |
| EA |
| 308 |
| Concrete Structures |
| 1 |
| LS |
| 309 |
| Concrete Canal Lining |
| 1 |
| LS |
| 310 |
| Install Contractor Furnished Radial Gate and Appurtenances |
| 1 |
| LS |
| 311 |
| Pipe Railings and Miscellaneous Metals |
| 1 |
| LS |
| 312 |
| Control Building |
| 1 |
| LS |
| 313 |
| Electrical Equipment and Control System |
| 1 |
| LS |
| 315 |
| Roadway Surface Course |
| 1 |
| LS |
| 316 |
| Reclamation and Seeding |
| 1 |
| LS |
| 317 |
| Fencing, Signage, and Gates |
| 1 |
| LS |
| 319 |
| Stainless Steel Stop Log Guides |
| 1 |
| LS |
| 320 |
| Field Directed Earthwork |
| 1 |
| LS |
Total of all unit price CLIN 3 items
CLIN 4 – CRIP MC420 Electrical Transmission and Distribution Modifications
| Item No. |
| Description |
| Est. Quantity |
| Unit |
| Unit Price |
| Bid Amount |
| 401 |
| Steel Vendor Selection |
| 1 |
| LS |
| 402 |
| Mobilization and Preparatory work |
| 1 |
| LS |
| 403 |
| Transmission Foundations* |
| 4 |
| EA |
| 405 |
| Transmission Structures/ Installation |
| 3 |
| EA |
| 406 |
| Transmission Switch/ Installation |
| 1 |
| EA |
| 407 |
| Existing Transmission Structure Modification |
| 2 |
| EA |
| 408 |
| Transmission Wire Installation |
| 1 |
| LS |
| 409 |
| Transmission Grounding Installation |
| 1 |
| LS |
| 410 |
| Transmission Switch Fencing Installation |
| 1 |
| LS |
| 411 |
| Distribution Structures/ Installation |
| 2 |
| EA |
| 412 |
| Existing Distribution Structure Modification |
| 1 |
| EA |
| 413 |
| Distribution Wire Installation |
| 1 |
| LS |
| 414 |
| Retired Wire Removal |
| 1 |
| LS |
| 415 |
| Retired Transmission Structure Removal |
| 5 |
| EA |
| 416 |
| Retired Distribution Structure Removal |
| 2 |
| EA |
Total of all unit price CLIN 4 items
Total of all CLIN Bid Schedules__________________________________________
CRIP MC420 Electrical Transmission and Distribution Unit Price Adjustments
| Item No. |
| Description |
| Est. Quantity |
| Unit |
| Unit Price |
| Bid Amount |
| 419 |
| Foundation Unit Adjustment Price** (Including TERO) |
| 1 |
| CY |
* Bid Item 403 is based on the foundation dimensions shown in the drawings. BIA intends to update the foundation designs based on the final reactions from the Contractor-procured transmission poles.
** Bid Item 419 is the unit adjustment price BIA will use, only in the event of foundation size modifications, to either increase (larger foundation than planned) or decrease (smaller foundation than planned) the price of the work relative to the price established under Bid Item 403. Bid Item 419 is not included in the total of all bid schedules.
\\dowl.com\j\Projects\26\12494-01\81Specs\MC185_MC270\00 41 10 - Pricing Schedule.docx