0_ NONSI Document _ Bartow County Pump Statio.pdf
PDF 98 KB Posted
- Attached to
- ITB 24-55-01
- Solicitation number
- PE-60800-NONST-2024-000000003
- Issued by
- Bartow County, Georgia
About this file
This document is a Notice of No Significant Impact on the Environment from the Georgia Department of Natural Resources, Environmental Protection Division (EPD) and the Georgia Environmental Finance Authority (GEFA) regarding a loan application from Bartow County for the construction of a new pump station and force main.
The project consists of constructing a duplex pump station and installing approximately 28,982 linear feet of 12-inch force main to serve the western part of Bartow County. The total project cost is $6,324,439, with an anticipated SRF loan amount of $6,000,000. The project will provide sewer service for the future population in the western area of Bartow County and replace the need for the proposed West Bartow Water Pollution Control Plant. Minor temporary impacts during construction, such as noise, dust, and erosion/sedimentation, will be mitigated through best management practices. The project will be located in the 100-year floodplain, but the scope of work will not impact the floodplain. No impacts to existing buildings are anticipated, and current wastewater rates are not expected to increase as a result of the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WEST_BARTOW_SEWER_PUMP_STATION_NOTICE_OF_AWAR.pdf | ||
| Wage and Labor Rate Approvals.pdf | ||
| E_Verify Affidavit (003).pdf | ||
| 2024_01_19 _ Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jeffrey W. Cown, Director
EPD Director’s Office 2 Martin Luther King, Jr. Drive Suite 1456, East Tower Atlanta, Georgia 30334 404-656-4713
NOTICE OF NO SIGNIFICANT IMPACT ON THE ENVIRONMENT
TO ALL INTERESTED AGENCIES, GROUPS AND PERSONS
Bartow County has made an application to the Georgia Department of Natural Resources, Environmental Protection Division (EPD) and the Georgia Environmental Finance Authority (GEFA) for a loan through the State Revolving Fund (SRF). The project consists of construction of a new pump station and force main to provide sewer service for the western part of Bartow County. The applicant has certified that the project is environmentally sound. As required by the Federal Clean Water Act, an environmental review has been performed on the project described below:
Project Name: Bartow County
West Bartow Pump Station and Force Main GEFA Loan No. CW-2020-004
Project Location: Bartow County, GA
Total Project Cost: $6,324,439
Anticipated SRF Loan Amount: $6,000,000
Project Description
Bartow County proposes to construct a duplex pump station and install approximately 28,982 linear feet of 12-inch force main to serve the western part of Bartow County. This project replaces the need for the construction of the proposed West Bartow Water Pollution Control Plant and will accommodate flow/population projections for the area.
Anticipated Impacts
The proposed project will serve the western area of Bartow County. The project will provide sewer service for the future population.
Minor negative temporary impacts may include noise, dust and erosion/sedimentation associated with construction activities. Best Management Practices will be in place during construction. The project will be located in the 100-year floodplain as indicated by the Federal Emergency Management Agency (FEMA) map. However, the scope of work consists of installation of sewer lines and will not impact the floodplain. Detailed mitigation measures will be described in the construction documents (plans and specifications) for the project.
The project will take place primarily on City property (or right-of-way) and/or previously disturbed land and no impacts to existing buildings are anticipated as a result of the project.
The current rates for wastewater are not anticipated to increase as a result of the project.