NIGP 75508: Ash System Equipment, Fly and Bottom
Item
Code facts
- Part of
-
-
13
- 755
-
13
- Open opportunities
- 1 1 posted in the last 90 days
NIGP codes come from the NIGP Code (NIGP: The Institute for Public Procurement, maintained by Periscope Holdings), and state and local contract opportunities from the governments' procurement sites.
State & local contract opportunities
Opportunities by state
| Rank | State | Open now | Posted, last 90 days |
|---|---|---|---|
| 1 | Michigan | 1 | 1 |
About NIGP 75508
NIGP 75508 Ash System Equipment, Fly And Bottom is an Item code under which state and local governments procure heavy equipment, materials, and labor for roadway construction, pavement rehabilitation, bridge replacement, and safety barrier installation projects. Based on recent solicitations, the code captures procurement of equipment and materials for comprehensive infrastructure work including asphalt overlay, concrete curb and gutter installation, guardrail and crash cushion systems, drainage and bioretention infrastructure, traffic control devices, and site restoration—typically bundled as fixed-price or low-bid competitive contracts rather than equipment-only purchases.
Santa Clara County, California has been the primary recent issuer under this code, soliciting bids for three major infrastructure projects between February and May 2026: the Red Fox Creek Bridge #37C0172 Replacement Project on New Avenue (ITB response due March 5, 2026), Expressway Guardrail Replacement and Safety Barrier Improvements (ITB response due April 23, 2026 with mandatory pre-bid on April 14, 2026), and Central Expressway Pavement Rehabilitation Project Between Bowers Avenue and Scott Boulevard (ITB response due May 21, 2026). All three solicitations are ITBs requiring sealed physical bids submitted to the County Government Center; electronic bidding is not accepted. Work is concentrated in California, specifically the San Jose metropolitan area. Representative scope includes partial-depth recycling, hot-mix asphalt overlay, Portland cement concrete curb and sidewalk installation, ADA access improvements, guardrail and concrete barrier installation, crash cushion placement, inductive traffic loop removal and replacement, bioretention basin installation, traffic signal modifications, and pedestrian sensor installation. Completion periods range from 45 to 142 working days. The Red Fox Creek bridge project involves federal funds with Buy America compliance and Davis-Bacon prevailing wage requirements; a $650,000 contingency allowance is noted, though the total base bid amount is not disclosed in available documentation.
Quick answers
What is NIGP 75508?
NIGP 75508 is Ash System Equipment, Fly and Bottom, an item in NIGP 13, Highway Road Equipment, Materials, and Related Equipment.
Which states post the most state and local bids under NIGP 75508?
The states with the most state and local contract opportunities under NIGP 75508 posted in the last 90 days are Michigan (1).
What is the latest state & local contract opportunity under NIGP 75508?
The latest state & local contract opportunity under NIGP 75508 is Rehabilitation of Ash Handling System from Michigan, posted October 13, 2026.
On GovTribe
See everything under NIGP 75508
- State & local contract opportunities, awards and contract vehicles under this code
- Contacts who buy under this code
- Ask GovTribe AI about this code