USACE Solar and Wind Power Plants 2012-2017

Ended Master IDIQ Awarded

Federal agency
Awardees
6
Task orders
10
Obligated
$39,372,775

Vehicle facts

Opportunity
  • W9123812R0018 Solicitation number
Agency
Combined task order value
  • $39,419,246 Current, with exercised options
  • $40,239,595 Potential, with all options
Last date to order 100% complete

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The U.S. Army Corps of Engineers Engineering District Sacramento established this Master IDIQ for design, construction, and installation of solar and wind power plants at Army facilities in 2012, but ordering closed on April 30, 2017, and is no longer available for new task orders.

The vehicle executed ten delivery orders totaling $40.2 million in combined potential value, of which $39.4 million (98 percent) has been obligated. Task orders funded renewable energy projects exclusively through the Engineering District Sacramento, including 2 megawatt solar photovoltaic arrays at Camp Parks and New Hogan Lake, a 1.8 megawatt wind turbine at Tooele Army Depot, and grid-tied solar systems at Fort Hunter Liggett and multiple Army Reserve Centers. Projects ranged from design-build solar installations to wind turbine procurement and energy storage feasibility work, all priced firm fixed.

Tri-Technic Inc. dominated the prime contractor base, capturing four orders and $11.2 million in combined potential value. Icenogle Construction Management, Inc. and Earthworks Mortenson Joint Venture each won two and one orders respectively, with the latter accounting for $7.1 million. The remaining two primes—Synergy Electric Company, Inc. and J.R. Conkey & Associates, Inc.—held smaller shares. No single firm concentration pattern emerged that would eliminate opportunity for new entrants had the vehicle remained open.

Small business set-asides accounted for 70 percent of awarded orders (seven of ten), split across firm fixed-price contracts with typical ceilings ranging from roughly $300,000 to $8.4 million. Unrestricted orders represented 30 percent and included the two largest single awards: a $8.4 million 2 megawatt solar array at Dugway Proving Ground and a $7.4 million wind turbine installation at Tooele Army Depot. Ordering momentum peaked in 2012 with four initial awards, then declined through 2016, with only one order issued in the final full year of vehicle operation.

All work was geographically scoped to Army installations within the South Pacific Division footprint, primarily in California and Utah.

Description

Renewable energy (solar and wind) power plants for bases with the U.S. Army Corps of Engineers (USACE) South Pacific Division.

IDV awards

Latest task orders

Top awardees by obligations

Rank Awardee Obligated Share
1 Tri-Technic Inc. $10,765,448 27%
2 Trieco TT JV $8,445,707 21%
3 Earthworks Mortenson Joint Venture $7,119,027 18%
4 Icenogle Construction Management, Inc. $7,003,140 18%
5 J.r. Conkey & Associates, Inc. $4,534,574 12%
6 Synergy Electric Company, Inc. $1,504,879 4%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Army $39,372,775 100%

Obligations by fiscal year

Fiscal year Obligated
FY2022 $107,033
FY2021 $70,006
FY2020 $107,333
FY2019 $113,548
FY2018 $205,145
FY2017 $93,180
FY2016 $2,449,669
FY2015 $1,676,971
FY2014 $22,870,332
FY2013 $9,926,961
FY2012 $1,752,597
Show all 11

Quick answers

What is the USACE Solar and Wind Power Plants 2012-2017 contract vehicle?

USACE Solar and Wind Power Plants 2012-2017 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by ENDIST Sacramento (US Army Corps of Engineers), awarded on July 13, 2012.

Which companies hold USACE Solar and Wind Power Plants 2012-2017?

6 companies hold USACE Solar and Wind Power Plants 2012-2017's IDV awards, one each. The latest went to Tri-Technic Inc. on July 13, 2012. The awardees whose task orders obligated the most are Tri-Technic Inc., Trieco TT JV and Earthworks Mortenson Joint Venture.

How much has been spent through USACE Solar and Wind Power Plants 2012-2017?

10 task orders have been placed under USACE Solar and Wind Power Plants 2012-2017, obligating $39,372,775. Their combined current value, with exercised options, is $39,419,246.

Which agencies use USACE Solar and Wind Power Plants 2012-2017 the most?

The departments whose task orders under USACE Solar and Wind Power Plants 2012-2017 obligated the most are Department of the Army ($39,372,775).

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle