USACE Seattle D-B and Horizontal Construction 2013-2017

Ended Master IDIQ Awarded

Federal agency
Awardees
5
Task orders
9
Obligated
$34,040,582

Vehicle facts

Opportunity
  • W912DW13R0006 Solicitation number
Agency
Combined task order value
$34,040,582 Current and potential, with all options
Last date to order 100% complete
Shared ceiling 69% used
$49,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The U.S. Army Corps of Engineers, Seattle District, awarded this Master IDIQ for design-build and horizontal construction work in Washington, Oregon, Idaho, Montana, and the Northwest Division on September 5, 2013; ordering closed on September 4, 2018, and the vehicle is no longer active.

The shared ceiling was $49 million. All $34 million in combined task-order potential value has been obligated across nine orders, with no remaining capacity. The vehicle supported ecosystem restoration and civil infrastructure projects, including levee rehabilitation (Dykstra, DeSImone-Briscoe), wetland and riparian restoration (Mill Creek, Big Springs Creek, Seahurst Park, eelgrass restoration), and utility and facility work (Rainier Drive repair, utility corridors, water-tank replacement at Malmstrom Air Force Base). Most work concentrated in Washington State, though performance extended to Montana and included non-USACE funding through the Department of Energy Bonneville Power Administration.

CKY Inc. dominated the prime field with four orders worth $16.3 million combined potential value; Bristol Engineering Services Company, LLC and Cherokee General Corp followed with two and three orders respectively, totaling $9.6 million and $8.1 million. The Seattle District placed eight of nine orders worth $31.3 million; the single Bonneville Power Administration order was valued at $2.7 million. Task-order values ranged from approximately $1.56 million to $7.4 million, all priced firm fixed. Individual orders show two-to-three-year performance windows. Set-asides favored small business: six of nine orders (67 percent) designated total small business, with the remainder unrestricted. Obligated amounts matched ceiling values across all orders, indicating no value remained on any task order at close.

This vehicle has reached end-of-life; no new orders may be issued. Current and future USACE Seattle District design-build and horizontal construction work would proceed under a successor vehicle if one exists.

Description

MATOC D-B & Horizontal Construction Work for the Seattle District, USACE, include work in WA, OR, ID & MT and Elsewhere Within the Northwest Division (NWD) Boundaries

IDV awards

Latest task orders

Top awardees by obligations

Rank Awardee Obligated Share
1 CKY Inc. $16,338,524 48%
2 Bristol Engineering Services Company, LLC $9,642,983 28%
3 Cherokee General Corp $8,059,076 24%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Army $31,308,996 92%
2 Department of Energy $2,731,586 8%

Obligations by fiscal year

Fiscal year Obligated
FY2020 $165,000
FY2019 $706,830
FY2018 $5,213,117
FY2017 $951,365
FY2016 $3,724,795
FY2015 $5,873,399
FY2014 $9,782,611
FY2013 $7,623,465

Quick answers

What is the USACE Seattle D-B and Horizontal Construction 2013-2017 contract vehicle?

USACE Seattle D-B and Horizontal Construction 2013-2017 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by ENDIST Seattle (US Army Corps of Engineers), awarded on September 5, 2013.

Which companies hold USACE Seattle D-B and Horizontal Construction 2013-2017?

5 companies hold USACE Seattle D-B and Horizontal Construction 2013-2017's IDV awards, one each. The latest went to CKY Inc. on September 5, 2013. The awardees whose task orders obligated the most are CKY Inc., Bristol Engineering Services Company, LLC and Cherokee General Corp.

How much has been spent through USACE Seattle D-B and Horizontal Construction 2013-2017?

9 task orders have been placed under USACE Seattle D-B and Horizontal Construction 2013-2017, obligating $34,040,582.

What is the shared ceiling of USACE Seattle D-B and Horizontal Construction 2013-2017?

USACE Seattle D-B and Horizontal Construction 2013-2017's shared ceiling is $49,000,000; its task orders have used 69% of it.

Which agencies use USACE Seattle D-B and Horizontal Construction 2013-2017 the most?

The departments whose task orders under USACE Seattle D-B and Horizontal Construction 2013-2017 obligated the most are Department of the Army ($31,308,996) and Department of Energy ($2,731,586).

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle