USACE Rapid Disaster Infrastructure 8a MATOC

Ended Master IDIQ Awarded

Federal agency
Awardees
3
Task orders
2
Obligated
$57,609,259

Vehicle facts

Opportunity
Agency
  • ENDIST Omaha US Army Corps of Engineers, Department of Defense
Combined task order value
$57,609,259 Current and potential, with all options
Last date to order 100% complete
Shared ceiling 61% used
$95,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The U.S. Army Corps of Engineers Engineering District Omaha awarded this Master IDIQ, established August 19, 2019, as a competitive 8(a) set-aside for rapid disaster infrastructure work, but ordering closed August 18, 2024, and the vehicle is no longer active. The $95 million shared ceiling covered up to four 8(a) small-business contractors competing for time-sensitive flood recovery, infrastructure restoration, emergency management, and military construction across all 50 U.S. states.

The vehicle executed only two task orders totaling $57.6 million in potential value, both obligated by December 2019. Klutina River Contractors received both awards — a $57.5 million levee-repair delivery order (cost-plus-fixed-fee, completed October 2021) and a $120,251 levee-repair order in Hamburg, Iowa (cost-plus-fixed-fee, terminated January 2020). Both orders actually executed under cost-plus-fixed-fee pricing despite the solicitation's authorization for cost-reimbursable, cost-plus-fixed-fee, or firm-fixed-price structures based on project risk. No orders carried a set-aside designation in execution, despite the vehicle's competitive 8(a) structure. All funding came from Engineering District Omaha.

The vehicle never achieved its intended multiple-award competition model. The minimum guarantee of $2,500 per contract was substantially exceeded, but at least $37.4 million of the $95 million potential ceiling remained unobligated when ordering closed. Activity concentrated entirely in 2019, with no task orders awarded in 2020 or beyond. The five-year base period plus four one-year option periods concluded in August 2024; no successor vehicle is identified in the source. For firms evaluating similar vehicles, this MATOC demonstrates execution risk in achieving the forecast order volume under multi-award structures and underscores the importance of rapid responsiveness — the two awarded projects were levee-related emergency repair work, consistent with the vehicle's time-sensitive positioning but narrower in scope than the solicitation's broad infrastructure definition.

Description

This RDI MATOC allows for a full range of time-sensitive disaster, infrastructure, and construction related scopes of work to support federally funded customers. Projects may vary in size, complexity, and location, and will require a high degree of flexibility and adaptability. The Contractor must respond quickly and effectively. All work will be time-sensitive in nature, necessitating an immediate response to mitigate threat to life and property and/or operational impacts to the government. Examples include but are not limited to: Flood Recovery: flood control and water diversion projects, embankments, channel alignments and flood control structures in support of civil works missions. Infrastructure Recovery: restoration, repair, and demolition of facilities, utilities, real property systems, and other infrastructure requirement that cannot be performed in required timeframes with normal contract mechanisms to meet vital mission requirements. Emergency Management: response actions such as unwatering missions, debris recovery, temporary housing, and other actions to meet vital mission requirements. Military: construction of facilities, infrastructure, water and sanitation systems, electrical systems, natural gas and other energy systems, fences, lighting, and roads to support troop movements and other crucial military missions.

IDV awards

Awardee IDV award Awarded
Klutina River Contractors W9128F19D0066
Firelake-Arrowhead JV W9128F19D0065
Medvolt, LLC W9128F19D0064

Latest task orders

Task order Awardee Awarding agency Obligated Last action
L594 c levee repair W9128F20F0046 Klutina River Contractors ENDIST Omaha (USACE) $57,489,007
Ditch 6 levee repair, hamburg, IA W9128F19F0314 Klutina River Contractors ENDIST Omaha (USACE) $120,251

Top awardees by obligations

Rank Awardee Obligated Share
1 Klutina River Contractors $57,609,259 100%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Army $57,609,259 100%

Obligations by fiscal year

Fiscal year Obligated
FY2025 -$2,186,550
FY2021 $4,867,289
FY2020 $51,150,656
FY2019 $3,777,863

Quick answers

What is the USACE Rapid Disaster Infrastructure 8a MATOC contract vehicle?

USACE Rapid Disaster Infrastructure 8a MATOC is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by ENDIST Omaha (US Army Corps of Engineers), awarded on August 19, 2019.

Which companies hold USACE Rapid Disaster Infrastructure 8a MATOC?

3 companies hold USACE Rapid Disaster Infrastructure 8a MATOC's IDV awards, one each. The latest went to Klutina River Contractors on August 19, 2019. The awardees whose task orders obligated the most are Klutina River Contractors.

How much has been spent through USACE Rapid Disaster Infrastructure 8a MATOC?

2 task orders have been placed under USACE Rapid Disaster Infrastructure 8a MATOC, obligating $57,609,259.

What is the shared ceiling of USACE Rapid Disaster Infrastructure 8a MATOC?

USACE Rapid Disaster Infrastructure 8a MATOC's shared ceiling is $95,000,000; its task orders have used 61% of it.

Which agencies use USACE Rapid Disaster Infrastructure 8a MATOC the most?

The departments whose task orders under USACE Rapid Disaster Infrastructure 8a MATOC obligated the most are Department of the Army ($57,609,259).

How much was obligated through USACE Rapid Disaster Infrastructure 8a MATOC in fiscal year 2025?

Task orders under USACE Rapid Disaster Infrastructure 8a MATOC obligated -$2,186,550 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle