USACE NW A-E Hazardous Waste 2015-2020

Ended Master IDIQ Awarded

Federal agency
Awardees
6 across 7 IDV awards
Task orders
80
Obligated
$108,713,730

Vehicle facts

Opportunity
  • W912DQ14R3001 Solicitation number
Agency
Combined task order value
  • $111,557,059 Current, with exercised options
  • $113,277,728 Potential, with all options
Last date to order 100% complete
Shared ceiling
$90,000,000.00 Less than its task orders have obligated

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The U.S. Army Corps of Engineers Engineering District Kansas City closed ordering on the USACE NW A-E Hazardous Waste 2015–2020 Master IDIQ on August 12, 2020, ending a five-year-eleven-month ordering window that began at vehicle award on August 13, 2015. The vehicle is no longer active; all 80 task orders were awarded by April 13, 2018, with the most recent order closing out nearly eight years ago. Activity peaked in 2016 with 35 awards, then dropped sharply to only five orders in 2018. The combined task-order portfolio carries a potential value of $113.3 million, of which $108.7 million (96%) is obligated.

The vehicle funded Superfund site remedial investigations, feasibility studies, remedial design, remedial action oversight, and related architect-engineer services across multiple operable units and sites. Work included pre-design investigations, remedial design and construction-phase services, engineering during construction, responsible-party oversight, and long-term monitoring. Cost-plus-fixed-fee and firm-fixed-price arrangements were both used.

Competition was concentrated among five firms holding 84% of task orders by count. WSP USA Solutions Inc. led by potential value with $40.3 million across 13 orders; CDM Federal Programs Corporation captured the most orders with 22 awards totaling $30.7 million in potential value. Arcadis U.S., Inc., Ch2M Hill, Inc., and HDR Obrien & Gere, A Joint Venture collectively held the remainder of the top-five positions. Three additional small-business contractors shared the remaining 16 orders.

Customer concentration was skewed heavily toward the Environmental Protection Agency Region 2, which placed 43 of the 80 orders valued at $83.5 million (roughly 74% of the portfolio). The Corps of Engineers Engineering District Kansas City awarded 14 orders worth $9.1 million; EPA Region 8, the Seattle District, and the Army's other divisions together accounted for the balance. All task orders were unrestricted, with no set-asides in the vehicle structure or awarded orders. Task-order values ranged from guaranteed-minimum instruments of $0 in obligated funds to mega-orders exceeding $13 million obligated, with multiple five-million-dollar-plus awards for long-term remedial action and oversight projects at Hudson River, Newark Bay, Lower Passaic River, and Welsbach Superfund sites. Place of performance was distributed across the geographic scope of the EPA regions and Corps districts served, including sites in New Jersey, New York, Colorado, Washington, Oregon, Montana, and other states nationwide.

Description

The Northwestern Division of the U. S. Army Corps of Engineers has a requirement to acquire Architect-Engineer Hazardous, Toxic, and Radioactive Waste Indefinite Delivery Contracts (IDC) for execution of its environmental mission.

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
In accordance with the SOW dated 01 march 2017, the contractor shall provide… 0009 CDM Federal Programs Corporation ENDIST Kansas City (USACE) $995,733
The contractor shall perform all the necessary work and services in… 0002 Arcadis U.s., Inc. ENDIST Kansas City (USACE) $13,153,305
Roebling historical artifact mitigation 0002 AECOM Technical Services, Inc. ENDIST Kansas City (USACE) $873,633
Remedial investigation / feasibility study at the former KIL-tone company… W912DQ17F3005 HDR Obrien & Gere, A Joint Venture ENDIST Kansas City (USACE) $857,805
Pre-design investigations/remedial design at 18 mile creek OU1 and OU2 W912DQ17F3019 CDM Federal Programs Corporation ENDIST Kansas City (USACE) $3,641,346
Pohatcong valley superfund site - operable unit 02 - engineering during… W912DQ17F3017 Ch2M Hill, Inc. ENDIST Kansas City (USACE) $674,023
In accordance with the statement of work (SOW) dated 17 april 2017, the… W912DQ17F3011 WSP USA Solutions Inc. ENDIST Kansas City (USACE) $4,267,876
Soil remediation RD at the unimatic superfund site 0006 HDR Obrien & Gere, A Joint Venture ENDIST Kansas City (USACE) $908,417
Quanta PRP oversight (OU1) 0005 HDR Obrien & Gere, A Joint Venture ENDIST Kansas City (USACE) $246,621
This task order is for the performance of a feasibility study, proposed plan… 0005 WSP USA Solutions Inc. ENDIST Kansas City (USACE) $2,257,424
This task order is for the performance of a groundwater RI/FS of OU 4 at the… 0005 Arcadis U.s., Inc. ENDIST Kansas City (USACE) $2,068,145
The purpose of this task order is to implement remedial objective compliance at… W912DW17F2030 CDM Federal Programs Corporation ENDIST Seattle (USACE) $1,071,728
In accordance with the statement of work (SOW) dated july 2016, the… 0004 Ch2M Hill, Inc. ENDIST Kansas City (USACE) $3,106,493
Vestal water supplyb well SF site OU2 - pre-design investigation W912DQ17F3018 HDR Obrien & Gere, A Joint Venture ENDIST Kansas City (USACE) $692,416
Garfield groundwater contamination superfund site remedial design, operable… 0006 Ch2M Hill, Inc. ENDIST Kansas City (USACE) $3,328,864
Groundwater and sediments rifs at the unimatic manufacturing corporation… 0006 CDM Federal Programs Corporation ENDIST Kansas City (USACE) $1,505,261
Design review and engineering support services for bunker hill kellogg, idaho EC02 Ch2M Hill, Inc. ENDIST Seattle (USACE) $1,236,764
Task order EC01 - W912DQ-15-d-3014 environmental consulting at moses lake EPA… Ch2M Hill, Inc. ENDIST Seattle (USACE) $229,745
Supplemental investigation and mass discharge activities for hamilton-lebree… EC02 CDM Federal Programs Corporation ENDIST Seattle (USACE) $387,555
Architect-engineer and surveying service, libby montana site OU6. W9128F18F0038 CDM Federal Programs Corporation ENDIST Omaha (USACE) $71,622
A-e and surveying services-libby superfund site, libby, MT P2: 458645 DK03 CDM Federal Programs Corporation ENDIST Omaha (USACE) $3,797,465
Phase 2 of the remedial investigation at the PCE plume superfund site. W912DQ17F3015 Ch2M Hill, Inc. ENDIST Kansas City (USACE) $1,202,481
Operable unit 3 (OU3) pre-remedial design investigation support at the vineland… W912DQ17F3013 Arcadis U.s., Inc. ENDIST Kansas City (USACE) $254,358
Project tasks W912DW17F2019 CDM Federal Programs Corporation ENDIST Seattle (USACE) $1,855,248
Remedial alternatives investigation and evaluation for the price landfill… W912DQ17F3009 WSP USA Solutions Inc. ENDIST Kansas City (USACE) $443,219
Show 15 more

Latest 25 of 80 listed here. See the rest on GovTribe.

Top awardees by obligations

Rank Awardee Obligated Share
1 WSP USA Solutions Inc. $37,833,340 35%
2 CDM Federal Programs Corporation $29,503,589 27%
3 Arcadis U.s., Inc. $20,114,121 19%
4 Ch2M Hill, Inc. $12,409,321 11%
5 HDR Obrien & Gere, A Joint Venture $5,733,341 5%
6 AECOM Technical Services, Inc. $2,030,937 2%
7 The Louis Berger Group (Domestic). Inc. $624,838 1%
8 Ecology And Environment Inc. $464,243 <1%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Environmental Protection Agency $88,513,445 81%
2 Department of the Army $18,420,293 17%
3 Department of Veterans Affairs $1,779,992 2%

Obligations by fiscal year

Fiscal year Obligated
FY2026 -$1,199,381
FY2025 -$190,117
FY2024 -$271,854
FY2023 -$155,111
FY2022 -$784,937
FY2021 $5,480,800
FY2020 $11,505,089
FY2019 $13,408,623
FY2018 $22,232,088
FY2017 $42,488,432
FY2016 $15,867,691
FY2015 $332,407
Show all 12

Quick answers

What is the USACE NW A-E Hazardous Waste 2015-2020 contract vehicle?

USACE NW A-E Hazardous Waste 2015-2020 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by ENDIST Kansas City (US Army Corps of Engineers), awarded on August 13, 2015.

Which companies hold USACE NW A-E Hazardous Waste 2015-2020?

6 companies hold USACE NW A-E Hazardous Waste 2015-2020's 7 IDV awards. The latest went to WSP USA Solutions Inc. on August 13, 2015. The awardees whose task orders obligated the most are WSP USA Solutions Inc., CDM Federal Programs Corporation and Arcadis U.s., Inc.

How much has been spent through USACE NW A-E Hazardous Waste 2015-2020?

80 task orders have been placed under USACE NW A-E Hazardous Waste 2015-2020, obligating $108,713,730. Their combined current value, with exercised options, is $111,557,059.

What is the shared ceiling of USACE NW A-E Hazardous Waste 2015-2020?

The shared ceiling listed for USACE NW A-E Hazardous Waste 2015-2020, $90,000,000, is less than its task orders have obligated.

Which agencies use USACE NW A-E Hazardous Waste 2015-2020 the most?

The departments whose task orders under USACE NW A-E Hazardous Waste 2015-2020 obligated the most are Environmental Protection Agency ($88,513,445), Department of the Army ($18,420,293) and Department of Veterans Affairs ($1,779,992).

How much was obligated through USACE NW A-E Hazardous Waste 2015-2020 in fiscal year 2025?

Task orders under USACE NW A-E Hazardous Waste 2015-2020 obligated -$190,117 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle