USACE New England District MACC 2021 - 2026

Ended Master IDIQ Awarded

Federal agency
Awardees
6
Task orders
18
Obligated
$46,947,714

Vehicle facts

Opportunity
Agency
Combined task order value
  • $46,947,714 Current, with exercised options
  • $47,084,184 Potential, with all options
Last date to order 100% complete
Shared ceiling 52% used
$90,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The U.S. Army Corps of Engineers New England District established a Master IDIQ for vertical construction and incidental civil/site work with a shared ceiling of $90 million and a last order date of May 17, 2026. Ordering closed over one month ago, making this vehicle no longer active for new task-order awards.

The vehicle is fully obligated. Eighteen task orders totaling $47 million in combined potential value have been issued since May 2021, with $46.9 million already obligated. Order velocity declined sharply after 2022: seven orders in 2021, six in 2022, three in 2023, and one each in 2024 and 2025, with the final order awarded January 22, 2025. The gap in recent awards and the closed ordering period indicate the vehicle has completed its effective life cycle.

Awarded scope encompasses HVAC upgrades, roof replacements, facility renovations, structural work, and environmental abatement at military installations and federal research facilities across New England, including work at Westover Air Reserve Base, Natick Soldier Systems Center, Fort Devens, Naval Undersea Warfare Center Newport, and the Cold Regions Research and Engineering Laboratory. Recent orders include an $8.06 million commercial access point at Natick Soldier Systems Center (awarded December 2024) and a $5.75 million bio-environmental engineering facility at Westover Air Reserve Base (awarded January 2025).

P&S Construction Inc. dominates the prime field, holding five orders worth $24.8 million, or roughly 53 percent of combined potential value. Benaka, Inc., Structural Associates Inc., and Tantara Associates Corp follow with smaller portfolios. Six firms were awarded contracts across the 18 task orders.

Nearly all funding comes from the Army Corps of Engineers New England District itself, which placed 17 orders worth $41.3 million. Only one order funded the Army Corps of Engineers Louisville District ($5.8 million).

The set-aside mix shifted over time. Four orders (22 percent) used the Total Small Business set-aside, while 14 orders (78 percent) were unrestricted, indicating the vehicle operated as a mixed vehicle despite originating as a small-business-set-aside procurement.

Task orders ranged from $155,000 to $14.8 million, with most falling between $1 million and $8.5 million. All awards carried firm-fixed-price pricing.

Description

Construction tasks to include, but not limited to: minor new construction, renovation, repairs, upgrades, alterations, and preventive maintenance for vertical construction-type projects. The scope of work for vertical construction may include but is not limited to: structural systems, roof systems, mechanical systems, plumbing systems, heating, ventilation and air conditioning (HVAC) systems, fire suppression systems, fire alarm systems, electrical systems, telecommunication systems, building security systems, and associated civil/site features (utilities, stormwater and wastewater management, parking, roadways, grading, landscaping, and site security). Task orders issued under this contract may also include minor standalone civil/site/infrastructure projects and the following types of work incidental to the vertical construction project: environmental abatement (such as lead paint or asbestos), general earthwork, miscellaneous interior/exterior elements, system testing, building commissioning, requirements for anti-terrorism and force protection (ATFP), LEED, LID, EISA, EPACT, historical building renovations, or incidental design.

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Construction of a BIO-environmental engineering facility located at westover… W912QR25F0210 Structural Associates Inc. ENDIST Louisville (USACE) $5,719,118
Commercial access point at natick soldier systems center, natick, MA W912WJ25F0001 P & S Construction Inc. ENDIST New England (USACE) $8,056,765
Heating, ventiliaiton, and cooling upgrades for building 644 at fort devens… W912WJ23F0135 P & S Construction Inc. ENDIST New England (USACE) $1,368,081
Repair fuel cell hangar, bldg. 27, barnes air national guard base, westfield MA W912WJ23F0076 Benaka, Inc. ENDIST New England (USACE) $8,176,869
2ND floor HVAC upgrades, ICE engineering facility cold regions research and… W912WJ22F0140 Tantara Associates Corp ENDIST New England (USACE) $4,752,284
Minimum guarantee for the small construction MATOC for the U.S. Army corps of… W912WJ21F0079 Structural Associates Inc. ENDIST New England (USACE) $0
Renovate and add to building 264 at new hampshire air guard, pease, portsmouth… W912WJ22F0052 P & S Construction Inc. ENDIST New England (USACE) $14,807,912
Standby generator replacement at stamford hurricane barrier, stamford, CT W912WJ22F0123 J & J Contractors, Inc. ENDIST New England (USACE) $2,018,984
Building 119 roof replacement at NUWC in newport, RI W912WJ22F0044 P & S Construction Inc. ENDIST New England (USACE) $545,700
Tully lake garage addition, royalston, MA W912WJ23F0139 Tantara Associates Corp ENDIST New England (USACE) $648,900
Construct tower foundation at cape COD space force station in bourne… W912WJ22F0094 H.v. Collins Company, Inc. ENDIST New England (USACE) $398,000
General construction multiple award task order contract, indefinite delivery… W912WJ21F0078 J & J Contractors, Inc. ENDIST New England (USACE) $0
Culvert replacement at north hartland DAM in north hartland, vermont W912WJ21F0136 Benaka, Inc. ENDIST New England (USACE) $300,102
Minimum guarantee for construction mato for U.S. Army corps of engineers, new… W912WJ21F0077 H.v. Collins Company, Inc. ENDIST New England (USACE) $0
Minimum guarantee for construction MATOC for U.S. Army corps of engineers… W912WJ21F0075 Benaka, Inc. ENDIST New England (USACE) $0
Minimum guarantee for construction MATOC for U.S. Army corps of engineers… W912WJ21F0081 Tantara Associates Corp ENDIST New England (USACE) $0
Construction services of the main lab building, CMU wall removal (MTS lab) at… W912WJ22F0059 Tantara Associates Corp ENDIST New England (USACE) $155,000
Minimum guarantee for construction MATOC for US army corps of engineers, new… W912WJ21F0080 P & S Construction Inc. ENDIST New England (USACE) $0
Show all 18

Top awardees by obligations

Rank Awardee Obligated Share
1 P & S Construction Inc. $24,778,458 53%
2 Benaka, Inc. $8,476,970 18%
3 Structural Associates Inc. $5,719,118 12%
4 Tantara Associates Corp $5,556,184 12%
5 J & J Contractors, Inc. $2,018,984 4%
6 H.v. Collins Company, Inc. $398,000 1%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Army $46,947,714 100%

Obligations by fiscal year

Fiscal year Obligated
FY2026 $733,021
FY2025 $13,151,527
FY2024 $1,418,313
FY2023 $10,562,159
FY2022 $20,675,697
FY2021 $406,997

Quick answers

What is the USACE New England District MACC 2021 - 2026 contract vehicle?

USACE New England District MACC 2021 - 2026 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by ENDIST New England (US Army Corps of Engineers), awarded on May 17, 2021.

Which companies hold USACE New England District MACC 2021 - 2026?

6 companies hold USACE New England District MACC 2021 - 2026's IDV awards, one each. The latest went to Tantara Associates Corp on May 17, 2021. The awardees whose task orders obligated the most are P & S Construction Inc., Benaka, Inc. and Structural Associates Inc.

How much has been spent through USACE New England District MACC 2021 - 2026?

18 task orders have been placed under USACE New England District MACC 2021 - 2026, obligating $46,947,714.

What is the shared ceiling of USACE New England District MACC 2021 - 2026?

USACE New England District MACC 2021 - 2026's shared ceiling is $90,000,000; its task orders have used 52% of it.

Which agencies use USACE New England District MACC 2021 - 2026 the most?

The departments whose task orders under USACE New England District MACC 2021 - 2026 obligated the most are Department of the Army ($46,947,714).

How much was obligated through USACE New England District MACC 2021 - 2026 in fiscal year 2025?

Task orders under USACE New England District MACC 2021 - 2026 obligated $13,151,527 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle