USACE Midwest Construction MATOC 2014-2019

Ended Master IDIQ Awarded

Federal agency
Awardees
3
Task orders
29
Obligated
$8,062,159

Vehicle facts

Opportunity
  • W912EK14R0015 Solicitation number
Agency
Combined task order value
  • $8,062,159 Current, with exercised options
  • $8,212,488 Potential, with all options
Last date to order 100% complete
Shared ceiling 81% used
$10,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The U.S. Army Corps of Engineers Engineering District Rock Island established this Master IDIQ for construction services with a shared ceiling of $10 million on September 2, 2014, with ordering authority expiring September 2, 2019. This vehicle is closed to new orders and has been inactive for nearly seven years.

The MATOC contracted general construction and trades services across mechanical systems, structural repair, site work, and facility maintenance including HVAC, plumbing, roofing, masonry (including historic stone rehabilitation), electrical and security systems, parking lot paving, concrete repair, and minor demolition. Task orders funded work primarily at Corps-managed water resource projects in the Midwest—locks and dams on the Mississippi, Illinois, and Iowa river systems; lake facilities at Red Rock, Coralville, and Saylorville; and Army Reserve Component installations at Arlington Heights (Illinois), Fort Snelling (Minnesota), and Kingsbury (Indiana).

The vehicle issued 29 task orders over its five-year life, with ordering activity declining sharply after 2016: eight orders in 2015, eight in 2016, five in 2017, three in 2018, and one in 2019. The most recent award was June 24, 2019. Combined task-order potential value reached $8.2 million, with $8.1 million obligated (98% utilization).

Two firms dominated: SAF Inc. captured 15 orders worth $4.3 million in combined potential value, and RB Construction Company won 11 orders worth $3.2 million. Emls - Futurenet Group, JV, LLC held three orders at $739 thousand. About 72 percent of task orders (21 awards) were competitive 8(a) set-asides; the remainder (8 orders) competed unrestricted. All work funded Rock Island District operations—zero funding from other agencies. Individual task-order ceilings ranged from two hundred dollars (two quality control plan deliverables) to $1.025 million (water line replacement at Red Rock), with typical construction work orders in the $100,000 to $550,000 range.

Description

Construction MATOC for services including, but not limited to: general carpentry; doors; windows; roofing; gutters; moisture & thermal protection; masonry - including rehabilitation of historic stone structures; metal buildings; lead paint and asbestos removal/remediation; interior and exterior finishes; furnishings; HVAC; plumbing; fire suppression; fuel systems; building automation systems controls; power distribution; backup generation; lighting; communications; security systems; motor controls; parking lot paving/striping; sidewalks; concrete repairs; asphalt sealing; fencing; minor earthwork; clearing/grubbing; directional boring; tree removal; minor demolition; and underground storage tank removal.

IDV awards

Awardee IDV award Awarded
RB Construction Company W912EK14D0006
Emls - Futurenet Group, JV, LLC W912EK14D0004
SAF Inc. W912EK14D0007

Latest task orders

Task order Awardee Awarding agency Obligated Last action
88TH RSC, usarc building 200, base and option a, arlington heights, IL 60005. W912EK18F0119 SAF Inc. ENDIST Rock Island (USACE) $896,762
Red rock water lines W912EK19F0073 RB Construction Company ENDIST Rock Island (USACE) $875,601
MATOC task order for mississippi river basin clinton, IA, 2017 event erosion… W912EK18F0116 RB Construction Company ENDIST Rock Island (USACE) $296,105
Task order for ilww peoria roofs repair, multi building at lock and dams… W912EK17F0042 SAF Inc. ENDIST Rock Island (USACE) $333,944
Coralville embankment slide repair W912EK18F0127 SAF Inc. ENDIST Rock Island (USACE) $171,792
RSC141 - site perimeter fence repair, 88TH RSC; schulstad usarc, arlington… W912EK17F0020 SAF Inc. ENDIST Rock Island (USACE) $478,227
Task order for DES moines river basin, lake red rock, knoxville, IA… W912EK17F0026 RB Construction Company ENDIST Rock Island (USACE) $381,203
Base bid-clock tower stone repair rock island, illinois. 0006 RB Construction Company ENDIST Rock Island (USACE) $102,692
Iowa river basin, coralville lake, admin bldg HVAC repair coralville, IA 0011 SAF Inc. ENDIST Rock Island (USACE) $272,868
Illinois river basin lockport pool lockport, IL, lockport pool major… 0008 RB Construction Company ENDIST Rock Island (USACE) $221,105
Task order 0001: 88TH RSC, usarc building, kingsbury, in; replace DDC system… Emls - Futurenet Group, JV, LLC ENDIST Rock Island (USACE) $709,473
Restroom repair and finishes arlington heights illinois. 0005 RB Construction Company ENDIST Rock Island (USACE) $528,652
Peoria lock boiler replacement, MATOC task order peoria, IL 61607 0007 RB Construction Company ENDIST Rock Island (USACE) $162,703
Task order is for HVAC upgrade, 3RD floor clock tower building. Rock island… 0010 SAF Inc. ENDIST Rock Island (USACE) $383,664
Task order is for 88TH RSC, fort snelling, MN, multi-building exterior lighting… 0009 SAF Inc. ENDIST Rock Island (USACE) $194,813
PM conference room & security remodel, clock tower building, US army corps of… 0007 SAF Inc. ENDIST Rock Island (USACE) $171,767
Coralville emergency sewer repairs 0004 RB Construction Company ENDIST Rock Island (USACE) $93,718
Clock tower annex stone & masonry repairs - 61204 0002 RB Construction Company ENDIST Rock Island (USACE) $202,255
Arlington heights, building 200, interior upgrade, phase i, cook county, 60602. 0004 SAF Inc. ENDIST Rock Island (USACE) $529,569
MATOC task order - illinois river basin, starved rock lock and DAM, starved… 0006 SAF Inc. ENDIST Rock Island (USACE) $216,621
DES moines river, lake red rock, pella, IA, sewage lift stations, whitebreast… 0003 RB Construction Company ENDIST Rock Island (USACE) $193,579
MATOC task order : illinois river basin, illinois waterway, morris IL - replace… 0008 SAF Inc. ENDIST Rock Island (USACE) $80,061
Award - 88TH RSC, fort snelling, fort snelling, MN - POV parking lot lighting… 0005 SAF Inc. ENDIST Rock Island (USACE) $258,318
Illinois river basin, illinois waterway visitors center, ottawa, IL, roof… 0003 Emls - Futurenet Group, JV, LLC ENDIST Rock Island (USACE) $29,800
DES moines river basin; saylorville lake; DES moines, IA; visitors center… 0003 SAF Inc. ENDIST Rock Island (USACE) $154,518
Show 15 more

Latest 25 of 29 listed here. See the rest on GovTribe.

Top awardees by obligations

Rank Awardee Obligated Share
1 SAF Inc. $4,264,873 53%
2 RB Construction Company $3,057,812 38%
3 Emls - Futurenet Group, JV, LLC $739,473 9%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Army $8,062,159 100%

Obligations by fiscal year

Fiscal year Obligated
FY2020 $115,440
FY2019 $881,639
FY2018 $1,229,696
FY2017 $1,753,890
FY2016 $1,731,360
FY2015 $1,699,809
FY2014 $650,325

Quick answers

What is the USACE Midwest Construction MATOC 2014-2019 contract vehicle?

USACE Midwest Construction MATOC 2014-2019 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by ENDIST Rock Island (US Army Corps of Engineers), awarded on September 2, 2014.

Which companies hold USACE Midwest Construction MATOC 2014-2019?

3 companies hold USACE Midwest Construction MATOC 2014-2019's IDV awards, one each. The latest went to RB Construction Company on September 3, 2014. The awardees whose task orders obligated the most are SAF Inc., RB Construction Company and Emls - Futurenet Group, JV, LLC.

How much has been spent through USACE Midwest Construction MATOC 2014-2019?

29 task orders have been placed under USACE Midwest Construction MATOC 2014-2019, obligating $8,062,159.

What is the shared ceiling of USACE Midwest Construction MATOC 2014-2019?

USACE Midwest Construction MATOC 2014-2019's shared ceiling is $10,000,000; its task orders have used 81% of it.

Which agencies use USACE Midwest Construction MATOC 2014-2019 the most?

The departments whose task orders under USACE Midwest Construction MATOC 2014-2019 obligated the most are Department of the Army ($8,062,159).

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle