USACE Midwest Construction MATOC 2014-2019
Ended Master IDIQ Awarded
- Federal agency
-
ENDIST Rock Island
- Awardees
- 3
- Task orders
- 29
- Obligated
- $8,062,159
Vehicle facts
- Opportunity
-
- W912EK14R0015 Solicitation number
- Agency
-
- ENDIST Rock Island US Army Corps of Engineers, Department of Defense
- Combined task order value
-
- $8,062,159 Current, with exercised options
- $8,212,488 Potential, with all options
- Last date to order 100% complete
- Shared ceiling 81% used
- $10,000,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The U.S. Army Corps of Engineers Engineering District Rock Island established this Master IDIQ for construction services with a shared ceiling of $10 million on September 2, 2014, with ordering authority expiring September 2, 2019. This vehicle is closed to new orders and has been inactive for nearly seven years.
The MATOC contracted general construction and trades services across mechanical systems, structural repair, site work, and facility maintenance including HVAC, plumbing, roofing, masonry (including historic stone rehabilitation), electrical and security systems, parking lot paving, concrete repair, and minor demolition. Task orders funded work primarily at Corps-managed water resource projects in the Midwest—locks and dams on the Mississippi, Illinois, and Iowa river systems; lake facilities at Red Rock, Coralville, and Saylorville; and Army Reserve Component installations at Arlington Heights (Illinois), Fort Snelling (Minnesota), and Kingsbury (Indiana).
The vehicle issued 29 task orders over its five-year life, with ordering activity declining sharply after 2016: eight orders in 2015, eight in 2016, five in 2017, three in 2018, and one in 2019. The most recent award was June 24, 2019. Combined task-order potential value reached $8.2 million, with $8.1 million obligated (98% utilization).
Two firms dominated: SAF Inc. captured 15 orders worth $4.3 million in combined potential value, and RB Construction Company won 11 orders worth $3.2 million. Emls - Futurenet Group, JV, LLC held three orders at $739 thousand. About 72 percent of task orders (21 awards) were competitive 8(a) set-asides; the remainder (8 orders) competed unrestricted. All work funded Rock Island District operations—zero funding from other agencies. Individual task-order ceilings ranged from two hundred dollars (two quality control plan deliverables) to $1.025 million (water line replacement at Red Rock), with typical construction work orders in the $100,000 to $550,000 range.
Description
Construction MATOC for services including, but not limited to: general carpentry; doors; windows; roofing; gutters; moisture & thermal protection; masonry - including rehabilitation of historic stone structures; metal buildings; lead paint and asbestos removal/remediation; interior and exterior finishes; furnishings; HVAC; plumbing; fire suppression; fuel systems; building automation systems controls; power distribution; backup generation; lighting; communications; security systems; motor controls; parking lot paving/striping; sidewalks; concrete repairs; asphalt sealing; fencing; minor earthwork; clearing/grubbing; directional boring; tree removal; minor demolition; and underground storage tank removal.
IDV awards
| Awardee | IDV award | Awarded |
|---|---|---|
| RB Construction Company | W912EK14D0006 | |
| Emls - Futurenet Group, JV, LLC | W912EK14D0004 | |
| SAF Inc. | W912EK14D0007 |
Latest task orders
Show 15 more
Latest 25 of 29 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | SAF Inc. | $4,264,873 | 53% |
| 2 | RB Construction Company | $3,057,812 | 38% |
| 3 | Emls - Futurenet Group, JV, LLC | $739,473 | 9% |
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Army | $8,062,159 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2020 | $115,440 |
| FY2019 | $881,639 |
| FY2018 | $1,229,696 |
| FY2017 | $1,753,890 |
| FY2016 | $1,731,360 |
| FY2015 | $1,699,809 |
| FY2014 | $650,325 |
Quick answers
What is the USACE Midwest Construction MATOC 2014-2019 contract vehicle?
USACE Midwest Construction MATOC 2014-2019 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by ENDIST Rock Island (US Army Corps of Engineers), awarded on September 2, 2014.
Which companies hold USACE Midwest Construction MATOC 2014-2019?
3 companies hold USACE Midwest Construction MATOC 2014-2019's IDV awards, one each. The latest went to RB Construction Company on September 3, 2014. The awardees whose task orders obligated the most are SAF Inc., RB Construction Company and Emls - Futurenet Group, JV, LLC.
How much has been spent through USACE Midwest Construction MATOC 2014-2019?
29 task orders have been placed under USACE Midwest Construction MATOC 2014-2019, obligating $8,062,159.
What is the shared ceiling of USACE Midwest Construction MATOC 2014-2019?
USACE Midwest Construction MATOC 2014-2019's shared ceiling is $10,000,000; its task orders have used 81% of it.
Which agencies use USACE Midwest Construction MATOC 2014-2019 the most?
The departments whose task orders under USACE Midwest Construction MATOC 2014-2019 obligated the most are Department of the Army ($8,062,159).
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle