USACE KC mega ERS ltra MATOC 2012-2018

Ended Master IDIQ Awarded

Federal agency
Awardees
12
Task orders
27
Obligated
$51,496,539

Vehicle facts

Opportunity
  • W912DQ12R3001, W912DQ12R3002, W912DQ11R3011 Solicitation numbers
Agency
Combined task order value
  • $51,496,539 Current, with exercised options
  • $52,264,362 Potential, with all options
Last date to order 100% complete
Shared ceiling
$25,000,000.00 Less than its task orders have obligated

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The Department of the Army Corps of Engineers Engineering District Kansas City awarded this Master IDIQ for environmental remediation and long-term response action services on September 26, 2012, with ordering authority that expired on February 10, 2018. The vehicle is now closed to new task orders and represents a completed procurement cycle.

The vehicle funded 27 task orders across a combined potential value of $52.3 million, with $51.5 million obligated (99% of potential value). Ordering activity peaked in 2013 with 13 awards, then declined sharply to a single award in 2017. The work scope spans the full environmental remediation lifecycle: preliminary assessments, site investigations, remedial investigations and feasibility studies, groundwater monitoring and pump-and-treat operations, vapor intrusion remediation, landfill capping, demolition, and long-term monitoring and operations at contaminated sites. Task-order values ranged from nominal minimum guarantees of $2,500 to $12.8 million for operation and maintenance of the former Nebraska Ordnance Plant groundwater program.

Hydrogeologic, Inc. dominated the vehicle, winning eight orders totaling $26.8 million combined potential value—roughly 51% of all task-order value. Environmental Quality Management, Inc. held the second-largest share at $12 million across two orders. PNW Joint Venture, Frontier Services, Inc., and smaller firms captured the remainder, with 12 distinct primes total. The top three primes by value held 98% of combined potential.

The customer base was heavily concentrated in the Kansas City District itself, which issued 21 of 27 orders valued at $30.1 million. The Environmental Protection Agency Region 7 placed one order for $12 million; EPA Region 2 issued three orders totaling $3.4 million. The remaining orders funded work for the Philadelphia and Seattle Corps districts.

Set-aside utilization was mixed: 41% of orders carried no set-aside designation, while 37% were Small Business awards, 15% were HUBZone, and 7% were Service-Disabled Veteran-Owned Small Business. The vehicle does not represent an active pursuit opportunity.

Description

Services that may be required in an ERS/LTRA task order include, but are not limited to: preparation of work plans; studies with associated reports; multiple phases of field investigations; preliminary assessments (PA); site investigations (SI) and remedial site inspections; remedial investigations (RI); feasibility studies (FS); Engineering Evaluation Cost Analysis (EECA); monitoring well installation and sampling; short and long term monitoring/long term operations (LTM/LTO) or Long Term Response Action (LTRA); data management; data interpretation; engineering evaluation and corrective actions; optimization studies; groundwater modeling; geophysical surveys; remediation cost estimates; management of non-hazardous and hazardous investigative derived waste (IDW); environmental and human health risk assessments; risk based remediation; air emission issues including vapor intrusion; surface water discharge, applying for environmental permits, remedial design; well abandonment; meetings; public meeting participation; preparation of presentation material both written and visual; hydrological, sediment and soil studies; project reports; engineering support and/or design; value engineering studies; operations and maintenance (O & M) for HTRW sites; energy evaluations for remediation systems; remedial action plans; remedial actions; removal action plans; removal actions; construction support; site closeout/decision documents and, future project programming and scheduling support.

IDV awards

Awardee IDV award Awarded
Frontier Services, Inc. W912DQ13D3013 HubZone
Coastal Environmental Group Inc. W912DQ13D3012 HubZone
EA Engineering, Science, And Technology, Inc., PBC W912DQ13D3002 Small Business
GEO Consultants Corporation W912DQ13D3005 Small Business
Kemron Environmental Services, Inc. W912DQ13D3008 Small Business
Hydrogeologic, Inc. W912DQ13D3000 Small Business
FPM Remediations, Inc. W912DQ13D3003 Small Business
Environmental Quality Management, Inc. W912DQ13D3004 Small Business
Bay West LLC W912DQ13D3006 Small Business
PNW Joint Venture W912DQ13D3009 Small Business
SDV Engineering & Construction Ioi, JV W912DQ12D3012 SDVOSB
J2 Em-Assist Environmental Joint Venture LLC W912DQ12D3010 SDVOSB
Show all 12

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Sun cleaners for operation and maintenance (o & m) of the existing air… 0002 EA Engineering, Science, And Technology, Inc., PBC ENDIST Kansas City (USACE) $532,717
The purpose of this new task order is to perform all the necessary work and… 0007 Hydrogeologic, Inc. ENDIST Kansas City (USACE) $1,600,685
This is a firm fixed price task order for operation and maintenance (o & m), at… 0003 Hydrogeologic, Inc. ENDIST Kansas City (USACE) $1,265,306
This task order is for operation and maintenance of the groundwater… 0002 Hydrogeologic, Inc. ENDIST Kansas City (USACE) $12,768,327
The purpose of this task order is for ltra activities at the BOG creek site… 0008 Hydrogeologic, Inc. ENDIST Kansas City (USACE) $3,409,953
This is a new task order for long term remedial action (ltra) for remediation… 0006 Hydrogeologic, Inc. ENDIST Kansas City (USACE) $1,557,210
Task order for long-term monitoring at chemical insecticide corporation. 0002 SDV Engineering & Construction Ioi, JV ENDIST Kansas City (USACE) $355,850
FLW mutli site RI to RA task order 0005 Hydrogeologic, Inc. ENDIST Kansas City (USACE) $1,626,383
Complete multiple investigations, designs and remedial actions at fort… 0002 GEO Consultants Corporation ENDIST Kansas City (USACE) $653,617
The contractor shall conduct all necessary work and services for remedial… 0002 Coastal Environmental Group Inc. ENDIST Kansas City (USACE) $302,809
Treatment system o & m cosden superfund site, beverly, NJ CF01 PNW Joint Venture ENDIST Philadelphia (USACE) $2,031,036
This is a firm fixed price task order for all work and services associated with… 0004 Hydrogeologic, Inc. ENDIST Kansas City (USACE) $4,521,535
The contractor shall perform all necessary work and services required for… 0002 Environmental Quality Management, Inc. ENDIST Kansas City (USACE) $11,971,346
Landfill capping at the former forbes AFB north and south landfill sites… 0002 Frontier Services, Inc. ENDIST Kansas City (USACE) $4,798,233
Desert vista demolition EC01 PNW Joint Venture ENDIST Seattle (USACE) $4,086,532
This task order satisfies the minimum guarantee amount as stated in section b… 0001 Environmental Quality Management, Inc. ENDIST Kansas City (USACE) $0
This task order satisfies the minimum guarantee amount as stated in section b… 0001 Frontier Services, Inc. ENDIST Kansas City (USACE) $0
This task order satisfies the minimum guarantee amount as stated in section b… 0001 Coastal Environmental Group Inc. ENDIST Kansas City (USACE) $0
This task order satisfies the minimum guarantee amount as stated in section b… 0001 PNW Joint Venture ENDIST Kansas City (USACE) $0
This task order satisfies the minimum guarantee amount as stated in section b… 0001 GEO Consultants Corporation ENDIST Kansas City (USACE) $0
This task order satisfies the minimum guarantee amount as stated in section b… 0001 Hydrogeologic, Inc. ENDIST Kansas City (USACE) $0
This task order satisfies the minimum guarantee amount as stated in section b… 0001 Bay West LLC ENDIST Kansas City (USACE) $2,500
This task order satisfies the minimum guarantee amount as stated in section b… 0001 Kemron Environmental Services, Inc. ENDIST Kansas City (USACE) $2,500
This task order satisfies the minimum guarantee amount as stated in section b… 0001 EA Engineering, Science, And Technology, Inc., PBC ENDIST Kansas City (USACE) $2,500
This task order satisfies the minimum guarantee amount as stated in section b… 0001 FPM Remediations, Inc. ENDIST Kansas City (USACE) $2,500
Show 15 more

Latest 25 of 27 listed here. See the rest on GovTribe.

Pools and SINs

Pool or SIN IDV awards Ceiling Obligated
Small Business 8 $7,500,000 $46,034,647
HubZone 2 $10,000,000 $5,101,043
SDVOSB 2 $7,500,000 $360,850

Top awardees by obligations

Rank Awardee Obligated Share
1 Hydrogeologic, Inc. $26,749,398 52%
2 Environmental Quality Management, Inc. $11,971,346 23%
3 PNW Joint Venture $6,117,569 12%
4 Frontier Services, Inc. $4,798,234 9%
5 GEO Consultants Corporation $653,617 1%
6 EA Engineering, Science, And Technology, Inc., PBC $535,217 1%
7 SDV Engineering & Construction Ioi, JV $358,350 1%
8 Coastal Environmental Group Inc. $302,809 1%
9 Kemron Environmental Services, Inc. Minimum guarantee only $2,500 <1%
10 Bay West LLC Minimum guarantee only $2,500 <1%

"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Army $36,126,486 70%
2 Environmental Protection Agency $15,370,053 30%

Obligations by fiscal year

Fiscal year Obligated
FY2023 -$37,928
FY2022 -$489,683
FY2021 -$80,956
FY2020 -$98,759
FY2019 $1,097,872
FY2018 -$1,725,718
FY2017 $7,429,304
FY2016 $16,534,046
FY2015 $15,529,879
FY2014 $7,322,042
FY2013 $6,011,440
FY2012 $5,000
Show all 12

Quick answers

What is the USACE KC mega ERS ltra MATOC 2012-2018 contract vehicle?

USACE KC mega ERS ltra MATOC 2012-2018 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by ENDIST Kansas City (US Army Corps of Engineers), awarded on September 26, 2012.

Which companies hold USACE KC mega ERS ltra MATOC 2012-2018?

12 companies hold USACE KC mega ERS ltra MATOC 2012-2018's IDV awards, one each. The latest went to Frontier Services, Inc. on February 11, 2013. The awardees whose task orders obligated the most are Hydrogeologic, Inc., Environmental Quality Management, Inc. and PNW Joint Venture.

How much has been spent through USACE KC mega ERS ltra MATOC 2012-2018?

27 task orders have been placed under USACE KC mega ERS ltra MATOC 2012-2018, obligating $51,496,539.

What is the shared ceiling of USACE KC mega ERS ltra MATOC 2012-2018?

The shared ceiling listed for USACE KC mega ERS ltra MATOC 2012-2018, $25,000,000, is less than its task orders have obligated.

Which agencies use USACE KC mega ERS ltra MATOC 2012-2018 the most?

The departments whose task orders under USACE KC mega ERS ltra MATOC 2012-2018 obligated the most are Department of the Army ($36,126,486) and Environmental Protection Agency ($15,370,053).

What pools does USACE KC mega ERS ltra MATOC 2012-2018 have?

USACE KC mega ERS ltra MATOC 2012-2018 has 3 pools, lots and SINs, including Small Business, HubZone and SDVOSB.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle