USACE KC mega ERS ltra MATOC 2012-2018
Ended Master IDIQ Awarded
- Federal agency
-
ENDIST Kansas City
- Awardees
- 12
- Task orders
- 27
- Obligated
- $51,496,539
Vehicle facts
- Opportunity
-
- W912DQ12R3001, W912DQ12R3002, W912DQ11R3011 Solicitation numbers
- Agency
-
- ENDIST Kansas City US Army Corps of Engineers, Department of Defense
- Combined task order value
-
- $51,496,539 Current, with exercised options
- $52,264,362 Potential, with all options
- Last date to order 100% complete
- Shared ceiling
- $25,000,000.00 Less than its task orders have obligated
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Department of the Army Corps of Engineers Engineering District Kansas City awarded this Master IDIQ for environmental remediation and long-term response action services on September 26, 2012, with ordering authority that expired on February 10, 2018. The vehicle is now closed to new task orders and represents a completed procurement cycle.
The vehicle funded 27 task orders across a combined potential value of $52.3 million, with $51.5 million obligated (99% of potential value). Ordering activity peaked in 2013 with 13 awards, then declined sharply to a single award in 2017. The work scope spans the full environmental remediation lifecycle: preliminary assessments, site investigations, remedial investigations and feasibility studies, groundwater monitoring and pump-and-treat operations, vapor intrusion remediation, landfill capping, demolition, and long-term monitoring and operations at contaminated sites. Task-order values ranged from nominal minimum guarantees of $2,500 to $12.8 million for operation and maintenance of the former Nebraska Ordnance Plant groundwater program.
Hydrogeologic, Inc. dominated the vehicle, winning eight orders totaling $26.8 million combined potential value—roughly 51% of all task-order value. Environmental Quality Management, Inc. held the second-largest share at $12 million across two orders. PNW Joint Venture, Frontier Services, Inc., and smaller firms captured the remainder, with 12 distinct primes total. The top three primes by value held 98% of combined potential.
The customer base was heavily concentrated in the Kansas City District itself, which issued 21 of 27 orders valued at $30.1 million. The Environmental Protection Agency Region 7 placed one order for $12 million; EPA Region 2 issued three orders totaling $3.4 million. The remaining orders funded work for the Philadelphia and Seattle Corps districts.
Set-aside utilization was mixed: 41% of orders carried no set-aside designation, while 37% were Small Business awards, 15% were HUBZone, and 7% were Service-Disabled Veteran-Owned Small Business. The vehicle does not represent an active pursuit opportunity.
Description
Services that may be required in an ERS/LTRA task order include, but are not limited to: preparation of work plans; studies with associated reports; multiple phases of field investigations; preliminary assessments (PA); site investigations (SI) and remedial site inspections; remedial investigations (RI); feasibility studies (FS); Engineering Evaluation Cost Analysis (EECA); monitoring well installation and sampling; short and long term monitoring/long term operations (LTM/LTO) or Long Term Response Action (LTRA); data management; data interpretation; engineering evaluation and corrective actions; optimization studies; groundwater modeling; geophysical surveys; remediation cost estimates; management of non-hazardous and hazardous investigative derived waste (IDW); environmental and human health risk assessments; risk based remediation; air emission issues including vapor intrusion; surface water discharge, applying for environmental permits, remedial design; well abandonment; meetings; public meeting participation; preparation of presentation material both written and visual; hydrological, sediment and soil studies; project reports; engineering support and/or design; value engineering studies; operations and maintenance (O & M) for HTRW sites; energy evaluations for remediation systems; remedial action plans; remedial actions; removal action plans; removal actions; construction support; site closeout/decision documents and, future project programming and scheduling support.
IDV awards
Show all 12
Latest task orders
Show 15 more
Latest 25 of 27 listed here. See the rest on GovTribe.
Pools and SINs
| Pool or SIN | IDV awards | Ceiling | Obligated |
|---|---|---|---|
| Small Business | 8 | $7,500,000 | $46,034,647 |
| HubZone | 2 | $10,000,000 | $5,101,043 |
| SDVOSB | 2 | $7,500,000 | $360,850 |
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Hydrogeologic, Inc. | $26,749,398 | 52% |
| 2 | Environmental Quality Management, Inc. | $11,971,346 | 23% |
| 3 | PNW Joint Venture | $6,117,569 | 12% |
| 4 | Frontier Services, Inc. | $4,798,234 | 9% |
| 5 | GEO Consultants Corporation | $653,617 | 1% |
| 6 | EA Engineering, Science, And Technology, Inc., PBC | $535,217 | 1% |
| 7 | SDV Engineering & Construction Ioi, JV | $358,350 | 1% |
| 8 | Coastal Environmental Group Inc. | $302,809 | 1% |
| 9 | Kemron Environmental Services, Inc. | $2,500 | <1% |
| 10 | Bay West LLC | $2,500 | <1% |
"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Army | $36,126,486 | 70% |
| 2 | Environmental Protection Agency | $15,370,053 | 30% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2023 | -$37,928 |
| FY2022 | -$489,683 |
| FY2021 | -$80,956 |
| FY2020 | -$98,759 |
| FY2019 | $1,097,872 |
| FY2018 | -$1,725,718 |
| FY2017 | $7,429,304 |
| FY2016 | $16,534,046 |
| FY2015 | $15,529,879 |
| FY2014 | $7,322,042 |
| FY2013 | $6,011,440 |
| FY2012 | $5,000 |
Show all 12
Quick answers
What is the USACE KC mega ERS ltra MATOC 2012-2018 contract vehicle?
USACE KC mega ERS ltra MATOC 2012-2018 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by ENDIST Kansas City (US Army Corps of Engineers), awarded on September 26, 2012.
Which companies hold USACE KC mega ERS ltra MATOC 2012-2018?
12 companies hold USACE KC mega ERS ltra MATOC 2012-2018's IDV awards, one each. The latest went to Frontier Services, Inc. on February 11, 2013. The awardees whose task orders obligated the most are Hydrogeologic, Inc., Environmental Quality Management, Inc. and PNW Joint Venture.
How much has been spent through USACE KC mega ERS ltra MATOC 2012-2018?
27 task orders have been placed under USACE KC mega ERS ltra MATOC 2012-2018, obligating $51,496,539.
What is the shared ceiling of USACE KC mega ERS ltra MATOC 2012-2018?
The shared ceiling listed for USACE KC mega ERS ltra MATOC 2012-2018, $25,000,000, is less than its task orders have obligated.
Which agencies use USACE KC mega ERS ltra MATOC 2012-2018 the most?
The departments whose task orders under USACE KC mega ERS ltra MATOC 2012-2018 obligated the most are Department of the Army ($36,126,486) and Environmental Protection Agency ($15,370,053).
What pools does USACE KC mega ERS ltra MATOC 2012-2018 have?
USACE KC mega ERS ltra MATOC 2012-2018 has 3 pools, lots and SINs, including Small Business, HubZone and SDVOSB.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle