Structures Engineering Research Program (SERP)

Ended Master IDIQ Awarded

Federal agency
Awardees
3
Task orders
12
Obligated
$41,512,103

Vehicle facts

Opportunity
Agency
Combined task order value
  • $51,742,250 Current, with exercised options
  • $51,742,697 Potential, with all options
Last date to order 100% complete
Shared ceiling 94% used
$44,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The Air Force Research Laboratory awarded this Master IDIQ on December 21, 2018, for structures engineering research and development supporting air and space vehicle design, but ordering closed on December 20, 2023, and the vehicle is no longer accepting new task orders. The combined potential value across all 12 awarded task orders is $51.7 million, with $40.1 million obligated to date.

This is a successor to the TRIAD Program and operates as an unrestricted, single-award vehicle to University of Dayton, which dominates the work. University of Dayton holds 6 of 12 task orders representing $32.9 million in combined potential value—64% of the vehicle's total. Booz Allen Hamilton Inc. has 4 orders totaling $13.5 million, and Arctos Technology Solutions has 2 orders valued at $5.4 million. No task orders carry small-business set-asides.

Scope encompasses conceptual design studies, experimental test planning and execution, model fabrication and modification, analytical and experimental data analyses, systems engineering assessments, technology assessments, and computational analyses across ten research areas: Structural Response Prediction, Structural Life Forecasting, Structural Integrity, Geometry Modeling and Design, Multidisciplinary Modeling and Analysis, Adaptive Structures, Multifunctional Structures, Hybrid Structures, Thermal Structures, and Experimental Validation. Recent orders cover digital-twin software engineering, aircraft structures prototyping and testing, aerospace system design and analysis, and modeling of system effectiveness. Work is performed at Air Force Research Laboratory facilities, industry and university facilities, and mutually agreed locations.

Ordering momentum has been sparse. The vehicle saw 4 orders in its first year and 4 more in 2021, but only 1 order in 2022 and 1 in 2025. All orders are Cost Plus Fixed Fee. The most recent task order, awarded December 21, 2025, carries a $17.5 million ceiling and obligated $11.6 million for multidisciplinary aerospace system design, analysis, building, and testing, completing October 21, 2026. Department of the Air Force funds roughly 88% of orders by combined potential value; the remainder funds the Air Force Research Laboratory directly.

Description

The Aerospace Vehicles Division of the Air Force Research Laboratory has been conducting Research and Development (R&D) programs through the Technology Research, Integration & Demonstration (TRIAD) Program. The SERP Program is a follow-on Master IDIQ to the TRIAD Program. Through the use of SERP Program task orders, air and space vehicle structures R&D will be conducted to deliver future air and space vehicle capabilities to the Warfighter. R&D activities will include, but is not limited to, conceptual design studies, experimental test planning and execution, model fabrication/modification, analytical and experimental data analyses, systems engineering assessments, technology assessments and evaluations, and computational analyses.

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Advancing design, analysis, prototyping, and testing for aircraft structures FA865023F2201 Booz Allen Hamilton Inc. AFRL $4,838,505
Systems modeling of effectiveness FA865021F2202 Booz Allen Hamilton Inc. AFRL $2,204,847
Design, analysis, building, and testing of multi-disciplinary aerospace… FA865023F2204 University Of Dayton AFRL $12,431,201
Systems modeling of effectiveness FA865021F2204 Arctos Technology Solutions, LLC AFRL $2,854,878
Systems modeling of effectiveness - university of dayton FA865021F2203 University Of Dayton AFRL $4,706,509
Enhancement of local research on optimization and design FA865021F2214 University Of Dayton ONR $4,999,996
Design, analysis and testing of multi-disciplinary aerospace syatem technologies FA865019F2244 University Of Dayton AFRL $4,024,995
(serp) structural concepts development & experimentation, and structures… FA865020F2212 Booz Allen Hamilton Inc. AFRL $2,791,383
Engineering analysis and design for fatigue-life-enhancing laser peening… FA865019F2247 University Of Dayton AFRL $1,055,000
Software engineering for airframe digital twin FA865019F2245 University Of Dayton AFRL $599,997
Software engineering for airframe digital twin FA865019F2246 Arctos Technology Solutions, LLC AFRL $599,997
Structural engineering research program engineering analysis FA865019F2248 Booz Allen Hamilton Inc. AFRL $404,795
Show all 12

Top awardees by obligations

Rank Awardee Obligated Share
1 University Of Dayton $27,817,699 67%
2 Booz Allen Hamilton Inc. $10,239,530 25%
3 Arctos Technology Solutions, LLC $3,454,875 8%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Air Force $41,512,103 100%

Obligations by fiscal year

Fiscal year Obligated
FY2026 $2,830,063
FY2025 $4,949,479
FY2024 $8,285,461
FY2023 $10,591,514
FY2022 $5,501,118
FY2021 $5,059,134
FY2020 $2,532,187
FY2019 $1,763,148

Quick answers

What is the SERP contract vehicle?

Structures Engineering Research Program (SERP) is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Air Force Research Laboratory (Air Force Materiel Command), awarded on December 21, 2018.

Which companies hold SERP?

3 companies hold SERP's IDV awards, one each. The latest went to University Of Dayton on December 21, 2018. The awardees whose task orders obligated the most are University Of Dayton, Booz Allen Hamilton Inc. and Arctos Technology Solutions, LLC.

How much has been spent through SERP?

12 task orders have been placed under SERP, obligating $41,512,103. Their combined current value, with exercised options, is $51,742,250.

What is the shared ceiling of SERP?

SERP's shared ceiling is $44,000,000; its task orders have used 94% of it.

Which agencies use SERP the most?

The departments whose task orders under SERP obligated the most are Air Force ($41,512,103).

How much was obligated through SERP in fiscal year 2025?

Task orders under SERP obligated $4,949,479 in fiscal year 2025.

What came before and after SERP?

SERP succeeded Technology Research, Integration, and Demonstration (TRIAD).

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle