Robins AFB Mechanical-Electrical Construction 2013-2017
Ended Master IDIQ Awarded
- Federal agency
-
Air Force Materiel Command
- Awardees
- 3
- Task orders
- 189
- Obligated
- $42,921,941
Vehicle facts
- Opportunity
-
- FA850111R0002 Solicitation number
- Agency
-
- Air Force Materiel Command Air Force, Department of Defense
- Combined task order value
-
- $42,921,941 Current, with exercised options
- $43,131,268 Potential, with all options
- Last date to order 100% complete
- Shared ceiling 95% used
- $45,000,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Air Force Materiel Command established this Master IDIQ for mechanical and electrical construction, repair, and maintenance at Robins Air Force Base, Georgia, with a shared ceiling of $45 million and ordering that closed on March 24, 2018—eight years and three months ago. This vehicle is no longer active and does not support new business pursuits.
Over its five-year period of performance (March 2013 to March 2018), the IDIQ generated 189 task orders totaling $43.1 million in combined potential value, with $42.9 million obligated (100% of combined potential). Ordering activity peaked in 2015 with 47 orders and declined steadily thereafter, falling to just 8 orders in the final quarter of 2018.
Scope encompassed building-systems work across the base: HVAC system replacement and repair (chillers, boilers, coils, air-handling units), electrical infrastructure (transformer repair and replacement, cable and wiring, switchgear, grounding systems, sub-panels and outlets), fire suppression and detection systems, power distribution (ground rods, harmonic devices, soft starters, power whips), and ancillary MEP work (ADA door openers, lighting installation, intrusion detection, lightning protection). The largest single order was a $2.38 million HVAC system construction for Building 140; others in the $1–2.3 million range included cable replacement (Marchbanks overhead-to-underground conversion), fire alarm and mass notification for Building 645, and Building 943 HVAC system construction.
RCA Contracting, Inc. dominated the vehicle with 123 of 189 orders worth $36.2 million in combined potential value (84% of total value). Jamco Ventures LLC held 65 orders valued at $6.9 million. The remaining 1 order (Pruett Air Conditioning Co, $5 thousand) is immaterial. Concentration was extreme; two firms captured substantially all work under this vehicle.
The customer base was narrow: Air Force Materiel Command directly issued 142 orders ($31.9 million), while its Warner Robins Air Logistics Complex subsidiary issued 46 orders ($11.2 million). One Defense Finance and Accounting Service order ($26 thousand) was an outlier.
The set-aside mix reveals a strong HUBZone preference: 174 of 189 orders (92%) were HUBZone set-asides, with 13 unrestricted orders (7%) and 2 small-business orders (1%). Nearly all task orders were firm fixed price. Work was performed across multiple buildings at Robins AFB, with no single location accounting for the entire scope—orders were distributed basewide.
Description
Contractors under this Master IDIQ must furnish all plant, labor, equipment, materials, transportation, supervision, administration and management necessary to perform all work required for the construction, repair and maintenance of the Mechanical/Electrical subsystems, infrastructure repair and utilities support at Robins AFB, GA.
IDV awards
| Awardee | IDV award | Awarded |
|---|---|---|
| RCA Contracting, Inc. | FA850113D0003 | |
| Jamco Ventures LLC | FA850113D0001 | |
| Pruett Air Conditioning Co | FA850113D0002 |
Latest task orders
Show 15 more
Latest 25 of 189 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | RCA Contracting, Inc. | $36,031,264 | 84% |
| 2 | Jamco Ventures LLC | $6,885,677 | 16% |
| 3 | Pruett Air Conditioning Co | $5,000 | <1% |
"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Air Force | $42,921,941 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2021 | $44,204 |
| FY2019 | $23,445 |
| FY2018 | $1,270,069 |
| FY2017 | $8,074,889 |
| FY2016 | $13,934,459 |
| FY2015 | $5,056,771 |
| FY2014 | $12,315,387 |
| FY2013 | $2,202,717 |
Quick answers
What is the Robins AFB Mechanical-Electrical Construction 2013-2017 contract vehicle?
Robins AFB Mechanical-Electrical Construction 2013-2017 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Air Force Materiel Command (Air Force), awarded on March 25, 2013.
Which companies hold Robins AFB Mechanical-Electrical Construction 2013-2017?
3 companies hold Robins AFB Mechanical-Electrical Construction 2013-2017's IDV awards, one each. The latest went to RCA Contracting, Inc. on March 25, 2013. The awardees whose task orders obligated the most are RCA Contracting, Inc., Jamco Ventures LLC and Pruett Air Conditioning Co.
How much has been spent through Robins AFB Mechanical-Electrical Construction 2013-2017?
189 task orders have been placed under Robins AFB Mechanical-Electrical Construction 2013-2017, obligating $42,921,941.
What is the shared ceiling of Robins AFB Mechanical-Electrical Construction 2013-2017?
Robins AFB Mechanical-Electrical Construction 2013-2017's shared ceiling is $45,000,000; its task orders have used 95% of it.
Which agencies use Robins AFB Mechanical-Electrical Construction 2013-2017 the most?
The departments whose task orders under Robins AFB Mechanical-Electrical Construction 2013-2017 obligated the most are Air Force ($42,921,941).
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle