Red River Army Depot Construction IDIQ 2014-2019
Ended Master IDIQ Awarded
- Federal agency
-
ACC Warren
+ 1 more agency
- Awardees
- 11
- Task orders
- 96
- Obligated
- $87,560,236
Vehicle facts
- Opportunity
-
- W911RQ13R0033 Solicitation number
- Agencies
-
- ACC Warren Army Contracting Command, Department of Defense
- TACOM Life Cycle Management Command Army Materiel Command, Department of Defense
- Combined task order value
-
- $87,560,236 Current, with exercised options
- $88,941,736 Potential, with all options
- Last date to order 100% complete
- Shared ceiling
- $48,000,000.00 Less than its task orders have obligated
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Department of the Army Materiel Command, TACOM Life Cycle Management Command, established a Master IDIQ for construction services at Red River Army Depot in January 2014 with a shared ceiling of $48 million; the vehicle's ordering period closed on January 26, 2019, making this contract inactive and unsuitable for new business pursuit.
The vehicle executed 96 task orders over its five-year life, with ordering momentum strongest in 2015 (18 orders) and declining thereafter through 2019 (1 order). Combined task-order potential value totaled $88.9 million, with $87.6 million obligated (98% of combined potential), indicating near-full utilization of awarded capacity. The work was highly concentrated geographically at Red River Army Depot in Texas and included building renovations, roof repairs, electrical upgrades, HVAC replacements, facility restoration, and specialized projects such as ballistic door installation and molten salt bath equipment.
Four Thirteen Inc. dominated the competitive landscape, holding 55 orders representing $50.8 million in combined potential value (57% of vehicle total). Altech Inc. held the second position with 24 orders and $36.5 million, creating a two-firm concentration of roughly 98% of awarded work. Jireh Group, Bering Straits Technical Services, Heritage Constructors, and six additional smaller firms split the remainder. All orders funded TACOM Life Cycle Management Command; no cross-agency funding occurred.
Set-aside distribution was split: 54 orders (56%) were designated for small business, while 42 orders (44%) used no set-aside. Task-order values ranged widely from minimum guarantees of $2.5 thousand on early safety-plan orders to large restoration projects exceeding $5.7 million (such as Building 373 restoration at $5.3 million obligated and Building 321 restoration at $5.4 million obligated). Firm fixed-price terms governed all awards. Performance completion dates extended well beyond the vehicle's ordering deadline, with some task orders not completed until 2022.
IDV awards
Show all 11
Latest task orders
Show 15 more
Latest 25 of 96 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Four Thirteen Inc. | $49,379,610 | 56% |
| 2 | Altech Inc. | $36,528,482 | 42% |
| 3 | Jireh Group, LLC | $862,548 | 1% |
| 4 | Bering Straits Technical Services, LLC | $411,684 | <1% |
| 5 | Heritage Constructors, Inc. | $362,913 | <1% |
| 6 | Abba Construction, Inc. | $2,500 | <1% |
| 7 | Pentacon, LLC | $2,500 | <1% |
| 8 | Blackhawk-Milcon A Joint Venture | $2,500 | <1% |
| 9 | Jamco Ventures LLC | $2,500 | <1% |
| 10 | American Contractor And Technology, Inc. | $2,500 | <1% |
"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Army | $87,560,236 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2023 | -$168,650 |
| FY2022 | $145,805 |
| FY2021 | $132,499 |
| FY2020 | $679,757 |
| FY2019 | $11,694,439 |
| FY2018 | $15,490,203 |
| FY2017 | $10,434,585 |
| FY2016 | $19,500,412 |
| FY2015 | $12,749,904 |
| FY2014 | $16,901,281 |
Quick answers
What is the Red River Army Depot Construction IDIQ 2014-2019 contract vehicle?
Red River Army Depot Construction IDIQ 2014-2019 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by ACC Warren (Army Contracting Command) and TACOM Life Cycle Management Command (Army Materiel Command), awarded on January 27, 2014.
Which companies hold Red River Army Depot Construction IDIQ 2014-2019?
11 companies hold Red River Army Depot Construction IDIQ 2014-2019's IDV awards, one each. The latest went to Four Thirteen Inc. on January 27, 2014. The awardees whose task orders obligated the most are Four Thirteen Inc., Altech Inc. and Jireh Group, LLC.
How much has been spent through Red River Army Depot Construction IDIQ 2014-2019?
96 task orders have been placed under Red River Army Depot Construction IDIQ 2014-2019, obligating $87,560,236.
What is the shared ceiling of Red River Army Depot Construction IDIQ 2014-2019?
The shared ceiling listed for Red River Army Depot Construction IDIQ 2014-2019, $48,000,000, is less than its task orders have obligated.
Which agencies use Red River Army Depot Construction IDIQ 2014-2019 the most?
The departments whose task orders under Red River Army Depot Construction IDIQ 2014-2019 obligated the most are Department of the Army ($87,560,236).
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle