Vehicle facts
- Opportunity
-
- 47PJ0020R0163 Solicitation number
- Agency
-
- Region 8 Public Buildings Service, General Services Administration
- Combined task order value
-
- $14,532,548 Current, with exercised options
- $14,540,996 Potential, with all options
- Last date to order 100% complete
- Shared ceiling 32% used
- $45,000,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The General Services Administration Public Buildings Service Region 8 established the Public Buildings Service R8 Architecture and Engineering 2020-20205 Master IDIQ on July 24, 2020, with a shared ceiling of $45 million; ordering closed on July 24, 2025, and is no longer open for new task orders.
The vehicle funded 107 delivery orders across five years, peaking at 28 orders in 2024 before dropping to seven orders in 2025 and one order in 2026. The portfolio has fully obligated its combined potential value of $14.5 million, representing a modest utilization rate against the original ceiling. Orders span design and construction-administration services for federal property within GSA Region 8's footprint — encompassing Colorado, Montana, North Dakota, South Dakota, Utah, and Wyoming — with concentrations at the Denver Federal Center in Lakewood, Colorado and IRS facilities in Ogden, Utah. Scope includes preliminary studies, feasibility assessments, design development, construction documents, and construction-phase administration for mechanical systems (HVAC, boilers, water systems), building envelope repairs, security hardening, accessibility upgrades, and modernization projects, often funded through COVID-relief and infrastructure programs.
Five firms captured 72 percent of task orders by count: Jackola Engineering & Architecture PC (22 orders, $2.2 million), Design Edge PC (21 orders, $2.4 million), Architectural Design West PC (15 orders, $1.5 million), The Schemmer Associates Inc. (10 orders, $2.5 million), and The Abo Group, Inc. (9 orders, $1.4 million). However, by potential value, The Abo Co-Op, LLC led with $2.8 million across eight orders, followed by The Schemmer Associates at $2.5 million. Activity is moderately concentrated; the top five firms held 78 percent of combined potential value. Eleven distinct primes competed under the vehicle, with a long tail of small and mid-size architecture and engineering practices.
GSA Public Buildings Service Region 8 funded 67 orders worth $6.8 million (roughly 80 percent of task orders). Secondary customers included the U.S. Marshals Service ($1.7 million across five orders), the Internal Revenue Service ($642 thousand across five orders), Customs and Border Protection ($437 thousand across five orders), and the Administrative Office of the U.S. Courts ($251 thousand across four orders).
About 85 percent of orders carried no set-aside designation (91 orders), with 14 percent designated for Small Business (15 orders) and 1 percent partial Small Business (one order). Task-order values ranged from under $10 thousand for small studies to roughly $600 thousand for major design programs; representative recent awards included a $588 thousand Denver Federal Center design (September 2025), a $443 thousand building assessment study (September 2022), and a $502 thousand South Dakota CARES Act design (September 2021). Most orders featured firm-fixed-price structures with completion windows between three and twenty-four months.
IDV awards
Latest task orders
Show 15 more
Latest 25 of 107 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | The Abo Co-Op, LLC | $2,776,645 | 19% |
| 2 | The Schemmer Associates Inc. | $2,467,824 | 17% |
| 3 | Design Edge PC | $2,393,315 | 17% |
| 4 | Jackola Engineering & Architecture PC | $2,184,834 | 15% |
| 5 | Architectural Design West PC | $1,491,392 | 10% |
| 6 | The Abo Group, Inc. | $1,411,586 | 10% |
| 7 | Coover Clark And Associates Inc. | $763,690 | 5% |
| 8 | Hollingsworth-Pack / CTA LLC | $434,161 | 3% |
| 9 | Mutchler Bartram Architects, P.C. | $373,080 | 3% |
| 10 | Foss Architecture & Interiors, Inc. | $102,895 | 1% |
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | General Services Administration | $7,069,836 | 49% |
| 2 | Department of the Interior | $2,152,908 | 15% |
| 3 | Department of Justice | $1,908,831 | 13% |
| 4 | Department of Health and Human Services | $721,667 | 5% |
| 5 | Department of Homeland Security | $648,508 | 4% |
| 6 | Department of the Treasury | $642,318 | 4% |
| 7 | Department of the Army | $588,180 | 4% |
| 8 | Administrative Office of the U.S. Courts | $251,437 | 2% |
| 9 | Environmental Protection Agency | $175,138 | 1% |
| 10 | Department of Veterans Affairs | $173,923 | 1% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | $87,365 |
| FY2025 | $2,803,557 |
| FY2024 | $3,220,189 |
| FY2023 | $1,425,370 |
| FY2022 | $3,293,534 |
| FY2021 | $3,128,556 |
| FY2020 | $573,977 |
Quick answers
What is the Public Buildings Service R8 Architecture and Engineering 2020-20205 contract vehicle?
Public Buildings Service R8 Architecture and Engineering 2020-20205 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Region 8 (Public Buildings Service), awarded on July 24, 2020.
Which companies hold Public Buildings Service R8 Architecture and Engineering 2020-20205?
10 companies hold Public Buildings Service R8 Architecture and Engineering 2020-20205's IDV awards, one each. The latest went to Design Edge PC on July 24, 2020. The awardees whose task orders obligated the most are The Abo Co-Op, LLC, The Schemmer Associates Inc. and Design Edge PC.
How much has been spent through Public Buildings Service R8 Architecture and Engineering 2020-20205?
107 task orders have been placed under Public Buildings Service R8 Architecture and Engineering 2020-20205, obligating $14,496,233. Their combined current value, with exercised options, is $14,532,548.
What is the shared ceiling of Public Buildings Service R8 Architecture and Engineering 2020-20205?
Public Buildings Service R8 Architecture and Engineering 2020-20205's shared ceiling is $45,000,000; its task orders have used 32% of it.
Which agencies use Public Buildings Service R8 Architecture and Engineering 2020-20205 the most?
The departments whose task orders under Public Buildings Service R8 Architecture and Engineering 2020-20205 obligated the most are General Services Administration ($7,069,836), Department of the Interior ($2,152,908) and Department of Justice ($1,908,831).
How much was obligated through Public Buildings Service R8 Architecture and Engineering 2020-20205 in fiscal year 2025?
Task orders under Public Buildings Service R8 Architecture and Engineering 2020-20205 obligated $2,803,557 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle