Pittsburgh-Butler-Erie Construction MATOC

Active Master IDIQ Awarded

Federal agency
Awardees
9
Task orders
32
Obligated
$41,293,566

Vehicle facts

Agency
Combined task order value
$41,293,566 Current and potential, with all options
Last date to order 25% complete
Shared ceiling 17% used
$250,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

Veterans Affairs Veterans Integrated Service Network 4 awarded a Master IDIQ for construction services in the Pittsburgh, Butler, and Erie areas on July 23, 2025, with ordering authority extending through July 22, 2030, against a $250 million shared ceiling. The vehicle is fully set aside for small business, with a tiered competitive evaluation starting at Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), followed by Veteran-Owned Small Businesses (VOSBs), then all small businesses.

Twenty-eight task orders totaling $30.8 million in combined potential value have been awarded since vehicle inception. Obligated dollars equal 100% of combined potential value, indicating all issued orders are fully funded. Ordering activity peaked in 2025 with 18 awards and has moderated to 10 awards through mid-2026. Among the 28 orders, 64% are SDVOSB set-asides, 29% are unrestricted small business, and 7% carry no set-aside designation.

Competition concentrates among five firms. Rbvetco, LLC leads with six orders and $11 million in potential value, followed by Fluharty Erie, LLC and Serviam Construction LLC (each six orders), and TBI Payne JV, LLC (three orders, $5.8 million). These four primes hold 93% of combined potential value. Task order values cluster at the lower end, with most awards in the range of $27,205 to $380,000; however, three mega-orders exceed this pattern: EEPG III at $3.8 million, Pittsburgh Butler Erie HZ Generator Site Prep at $5.79 million, and UD Replace Domestic Water Branch Piping Phases 4 & 5 at $7.7 million. Small minimum-guarantee orders ($5,000) appear to hold contractor positions but carry no execution value. All 28 orders fund VISN 4 operations. Place of performance is the Pittsburgh, Butler, and Erie regions of Pennsylvania. Typical order durations range from under one year to 27 months.

Remaining vehicle life is substantial at over four years. The $250 million ceiling accommodates only $30.8 million in awards to date, leaving significant headroom. Competitiveness remains tractable for small businesses meeting SDVOSB, VOSB, or general small business status.

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Signage and wayfinding 36C24426N0516 Serviam Construction LLC VISN-4 $238,287
Pittsburgh butler erie MATOC- 646-20-108 HZ generator site prep B49/52 36C24426N0055 TBI Payne JV, LLC VISN-4 $5,910,800
Pittsburgh butler erie construction MATOC 36C24425N1023 District Veterans Contracting, Inc. VISN-4 $0
Replace elevator cables - erie 36C24426N1068 Serviam Construction LLC VISN-4 $262,457
Pittsburgh butler erie 5 year construction MATOC 36C24425N0907 Rbvetco, LLC VISN-4 $2,753,113
Emergency repair of terrazzo floor to eliminate tripping hazard 36C24426N1137 TBI Payne JV, LLC VISN-4 $37,900
Pittsburgh butler erie MATOC 5 years 36C24426N0285 Valiant Construction LLC VISN-4 $2,139,076
562-26-307 replace subbasement drain pipe 36C24426N0694 Fluharty Erie, LLC VISN-4 $123,177
Pittsburgh UD gates and barriers 36C24426N0392 Fluharty Erie, LLC VISN-4 $1,378,358
Erie door project 36C24426N0559 Fluharty Erie, LLC VISN-4 $87,643
EO 14398 36C24426N0988 Serviam Construction LLC VISN-4 $370,450
Bldg 6 36C24426N0763 Richard Group LLC VISN-4 $9,662,538
529-23-106 upgrade fire and alarm systems 36C24425N1207 Serviam Construction LLC VISN-4 $1,741,682
Replace crac equipment in B13A 36C24426N0808 Serviam Construction LLC VISN-4 $267,321
Replace fill in towers UD 36C24425N1310 Serviam Construction LLC VISN-4 $764,396
Eepg III 36C24426N0075 Fluharty Erie, LLC VISN-4 $3,843,207
Water monitoring 36C24426N0413 Venergy Group LLC VISN-4 $2,700,000
Pittsburgh butler erie 5 year construction MATOC- 646-21-110 UD east vault… 36C24426N0064 Rbvetco, LLC VISN-4 $376,054
Elopement system 36C24426N0580 Serviam Construction LLC VISN-4 $241,454
UD replace domestic water branch piping phase 4 & 5 36C24425N1187 Rbvetco, LLC VISN-4 $7,727,073
Emergent repairs to the heinz police gate house 36C24426N0415 TBI Payne JV, LLC VISN-4 $39,200
HVAC erie VAMC 36C24426N0546 Fluharty Erie, LLC VISN-4 $380,000
646A4-25-205 emergency heinz boiler master control panel repair 36C24425N1329 Rbvetco, LLC VISN-4 $182,175
Sanitary drain repair - emergency 36C24425N1128 Rbvetco, LLC VISN-4 $27,205
Pittsburgh butler erie MATOC 36C24425N1025 Paramount Construction Group, LLC VISN-4 $5,000
Show 15 more

Latest 25 of 32 listed here. See the rest on GovTribe.

Top awardees by obligations

Rank Awardee Obligated Share
1 Rbvetco, LLC $11,070,620 27%
2 Richard Group LLC $9,667,538 23%
3 TBI Payne JV, LLC $5,992,900 15%
4 Fluharty Erie, LLC $5,817,385 14%
5 Serviam Construction LLC $3,891,047 9%
6 Venergy Group LLC $2,705,000 7%
7 Valiant Construction LLC $2,144,076 5%
8 Paramount Construction Group, LLC $5,000 <1%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of Veterans Affairs $41,293,566 100%

Obligations by fiscal year

Fiscal year Obligated
FY2027 To date $115,800
FY2026 $28,205,341
FY2025 $12,972,425

Quick answers

What is the Pittsburgh-Butler-Erie Construction MATOC contract vehicle?

Pittsburgh-Butler-Erie Construction MATOC is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Veterans Integrated Service Network 4 (Veterans Health Administration), awarded on July 23, 2025.

Which companies hold Pittsburgh-Butler-Erie Construction MATOC?

9 companies hold Pittsburgh-Butler-Erie Construction MATOC's IDV awards, one each. The latest went to Paramount Construction Group, LLC on July 23, 2025. The awardees whose task orders obligated the most are Rbvetco, LLC, Richard Group LLC and TBI Payne JV, LLC.

How much has been spent through Pittsburgh-Butler-Erie Construction MATOC?

32 task orders have been placed under Pittsburgh-Butler-Erie Construction MATOC, obligating $41,293,566.

What is the shared ceiling of Pittsburgh-Butler-Erie Construction MATOC?

Pittsburgh-Butler-Erie Construction MATOC's shared ceiling is $250,000,000; its task orders have used 17% of it.

Which agencies use Pittsburgh-Butler-Erie Construction MATOC the most?

The departments whose task orders under Pittsburgh-Butler-Erie Construction MATOC obligated the most are Department of Veterans Affairs ($41,293,566).

How much was obligated through Pittsburgh-Butler-Erie Construction MATOC in fiscal year 2025?

Task orders under Pittsburgh-Butler-Erie Construction MATOC obligated $12,972,425 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle