Operations and Maintenance Dredging MATOC IDIQ

Active Master IDIQ Awarded

Federal agency
Awardees
8
Task orders
6
Obligated
$3,000

Vehicle facts

Agency
Combined task order value
$3,000 Current and potential, with all options
Last date to order 22% complete
Shared ceiling <1% used
$50,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The U.S. Army Corps of Engineers established this Master IDIQ for operations and maintenance dredging services on September 8, 2025, with ordering authority extending through September 7, 2030. The vehicle carries a $50 million shared ceiling and is structured as a multiple-award contract open to unrestricted competition, though the original solicitation was designated Total Small Business set-aside.

Scope covers dredging functions across tributaries, rivers, and reservoirs within the St. Louis District Area of Responsibility, including dredging operations, borrow operations, disposal operations, disposal site management, water care, and turfing. Place of performance spans navigation channels on the Kaskaskia, Mississippi, and Illinois Rivers, plus Carlyle Lake, Rend Lake, Lake Shelbyville, Wappapello Lake, and Mark Twain Lake across Illinois and Missouri.

Activity remains nascent. Six task orders have been awarded since September 15, 2025—all within the first four days of contract establishment—generating $3 thousand in combined obligated value against a shared ceiling of $50 million. All six orders are firm fixed-price delivery orders with $500 ceiling value each and ultimate completion dates of September 7, 2030; three are designated minimum guarantee task orders. No set-aside designations appear on awarded orders despite the Total Small Business designation of the solicitation.

Prime contractors are evenly distributed: Ahtna-Brennan JV, LLC; King Co Inc.; Jackson D Summers; Viking Dredging, LLC; and Dubuque Barge And Fleeting Service Co each hold one order. The St. Louis District Corps of Engineers accounts for four of the six orders; the broader Corps of Engineers organization holds two. Individual task orders under the vehicle are contractually scoped to range from approximately $20,000 to $15 million depending on available funding, though actual awarded orders to date carry $500 ceilings and represent only planning-phase or minimum-guarantee commitments. The vehicle's ordering period is still in its first year, with more than four years of remaining authority.

IDV awards

Latest task orders

Top awardees by obligations

Rank Awardee Obligated Share
1 Ahtna-Brennan JV, LLC Minimum guarantee only $500 17%
2 King Co Inc. Minimum guarantee only $500 17%
3 Jackson D Summers Minimum guarantee only $500 17%
4 Viking Dredging, LLC Minimum guarantee only $500 17%
5 Dubuque Barge And Fleeting Service Co Minimum guarantee only $500 17%
6 Magruder Construction Co Inc. $500 17%

"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Army $3,000 100%

Obligations by fiscal year

Fiscal year Obligated
FY2025 $3,000

Quick answers

What is the Operations and Maintenance Dredging MATOC IDIQ contract vehicle?

Operations and Maintenance Dredging MATOC IDIQ is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by US Army Corps of Engineers (Department of the Army), awarded on September 8, 2025.

Which companies hold Operations and Maintenance Dredging MATOC IDIQ?

8 companies hold Operations and Maintenance Dredging MATOC IDIQ's IDV awards, one each. The latest went to Davinroy Mechanical Contractor, Inc. on September 8, 2025. The awardees whose task orders obligated the most are Ahtna-Brennan JV, LLC, King Co Inc. and Jackson D Summers.

How much has been spent through Operations and Maintenance Dredging MATOC IDIQ?

6 task orders have been placed under Operations and Maintenance Dredging MATOC IDIQ, obligating $3,000.

What is the shared ceiling of Operations and Maintenance Dredging MATOC IDIQ?

Operations and Maintenance Dredging MATOC IDIQ's shared ceiling is $50,000,000; its task orders have used <1% of it.

Which agencies use Operations and Maintenance Dredging MATOC IDIQ the most?

The departments whose task orders under Operations and Maintenance Dredging MATOC IDIQ obligated the most are Department of the Army ($3,000).

How much was obligated through Operations and Maintenance Dredging MATOC IDIQ in fiscal year 2025?

Task orders under Operations and Maintenance Dredging MATOC IDIQ obligated $3,000 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle