NWD Crane Rehabilitation and Replacement

Ended Master IDIQ Awarded

Federal agency
Awardees
5
Task orders
11
Obligated
$86,498,520

Vehicle facts

Opportunity
Agency
  • ENDIST Omaha US Army Corps of Engineers, Department of Defense
Combined task order value
  • $86,498,520 Current, with exercised options
  • $89,425,304 Potential, with all options
Last date to order 100% complete
Shared ceiling 87% used
$99,900,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The Department of the Army Corps of Engineers Engineering District Omaha established this Master IDIQ for crane rehabilitation and replacement work at Northwestern Division hydropower, navigation, and flood risk management facilities on March 4, 2019, with a shared ceiling of $99.9 million. The vehicle's ordering period closed on March 3, 2024, and is no longer accepting new task orders.

The vehicle is fully exhausted. Of the $99.9 million ceiling, task orders totaling $89.4 million in combined potential value have been awarded, with $86.5 million already obligated—97 percent of combined potential value. Eleven task orders were placed across a five-year active period, with ordering momentum concentrated in 2019 and 2020 (four orders each) and tapering sharply thereafter (one order per year in 2021, 2022, and 2023). The most recent award was issued August 28, 2023.

Work spans crane and hoist replacement and rehabilitation at specific facilities across the Columbia, Missouri, and Snake Rivers. Task orders include intake gantry crane replacements at Big Bend Dam and Fort Randall Dam (South Dakota), trashrake crane and rake upgrades across Lower Snake River dams, spillway monorail crane replacement at Oahe Dam, powerhouse and tailrace gantry crane rehabilitation at Libby and Dworshak dams (Idaho and Montana), lock and dam crane replacements at McNary Dam (Washington-Oregon), and emergency gate hoist replacement at Lower Monumental Dam (Washington). Individual task-order values range from approximately $1.2 million to $17.8 million, with most ceilings priced firm-fixed.

Competition concentrated among four primes. Reel COH Inc. holds the largest share by combined potential value at $43.2 million across three orders, followed by Garco Wemco A Joint Venture at $33.5 million across five orders. Crane Technologies Group, Inc. and Knight Const. & Supply, Inc. hold $7.2 million and $5.5 million, respectively. All task orders were unrestricted (no set-aside). Customer agencies include the Department of the Army Corps of Engineers ($39.7 million), Department of the Army ($35.6 million), and Department of Energy Bonneville Power Administration ($14.1 million).

This vehicle is closed to new ordering and functionally exhausted. Pursuit is not viable.

Description

The scope of project work associated with this Master IDIQ involves construction, rehabilitation and replacement of cranes, hoists and lifting devices. Work will consist of design-build (D-B)/design-bid-build (D-B-B) projects at hydropower, navigation, and flood risk management facilities located within the Northwestern Division's (NWD) Civil Works Area of Responsibility.

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Replacement of intake gantry crane at fort randall DAM, SD W9128F22F0242 Garco Wemco A Joint Venture ENDIST Omaha (USACE) $10,778,684
Mcnary DAM cranes 4 & 5 replacement W912EF20F8003 Reel COH Inc. ENDIST Walla Walla (USACE) $17,842,827
Lower snake river trashrake crane and rake upgrades, lower granite, little… W912EF21F8004 Reel COH Inc. ENDIST Walla Walla (USACE) $17,682,867
Fabricate and deliver emergency gate hoists W912EF19F8003 Garco Wemco A Joint Venture ENDIST Walla Walla (USACE) $4,056,451
Replace intake gantry crane at big bend DAM, SD W9128F23F0172 Garco Wemco A Joint Venture ENDIST Omaha (USACE) $9,791,399
Gantry crane rehabilitation W912DW20F2045 Garco Wemco A Joint Venture ENDIST Seattle (USACE) $6,168,865
Oahe spillway monorail crane replacement at oahe DAM, south dakota W9128F20F0267 Garco Wemco A Joint Venture ENDIST Omaha (USACE) $1,339,500
New 85-ton intake gantry crane replacement at the harry s. Truman lake… W912DQ19F1060 Reel COH Inc. ENDIST Kansas City (USACE) $6,755,459
BB replace draft tube crane W9128F19F0218 Knight Const. & Supply, Inc. ENDIST Omaha (USACE) $4,273,353
Mechanical & structural rehab of bridge crane W912DW20F2006 Crane Technologies Group, Inc. ENDIST Seattle (USACE) $6,616,308
Dworshak tailrace gantry crane rehab W912EF20F8002 Knight Const. & Supply, Inc. ENDIST Walla Walla (USACE) $1,192,805
Show all 11

Top awardees by obligations

Rank Awardee Obligated Share
1 Reel COH Inc. $42,281,155 49%
2 Garco Wemco A Joint Venture $32,134,899 37%
3 Crane Technologies Group, Inc. $6,616,308 8%
4 Knight Const. & Supply, Inc. $5,466,158 6%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Army $73,713,347 85%
2 Department of Energy $12,785,173 15%

Obligations by fiscal year

Fiscal year Obligated
FY2026 $490,965
FY2025 $1,065,304
FY2024 $4,777,893
FY2023 $16,135,772
FY2022 $21,964,737
FY2021 $12,680,325
FY2020 $14,944,323
FY2019 $14,439,200

Quick answers

What is the NWD Crane Rehabilitation and Replacement contract vehicle?

NWD Crane Rehabilitation and Replacement is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by ENDIST Omaha (US Army Corps of Engineers), awarded on March 4, 2019.

Which companies hold NWD Crane Rehabilitation and Replacement?

5 companies hold NWD Crane Rehabilitation and Replacement's IDV awards, one each. The latest went to Reel COH Inc. on March 4, 2019. The awardees whose task orders obligated the most are Reel COH Inc., Garco Wemco A Joint Venture and Crane Technologies Group, Inc.

How much has been spent through NWD Crane Rehabilitation and Replacement?

11 task orders have been placed under NWD Crane Rehabilitation and Replacement, obligating $86,498,520.

What is the shared ceiling of NWD Crane Rehabilitation and Replacement?

NWD Crane Rehabilitation and Replacement's shared ceiling is $99,900,000; its task orders have used 87% of it.

Which agencies use NWD Crane Rehabilitation and Replacement the most?

The departments whose task orders under NWD Crane Rehabilitation and Replacement obligated the most are Department of the Army ($73,713,347) and Department of Energy ($12,785,173).

How much was obligated through NWD Crane Rehabilitation and Replacement in fiscal year 2025?

Task orders under NWD Crane Rehabilitation and Replacement obligated $1,065,304 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle