NGB Fire Protection National AE IDIQ

Active Master IDIQ Awarded

Federal agency
Awardees
4
Task orders
11
Obligated
$1,835,197

Vehicle facts

Agency
Combined task order value
$1,835,197 Current and potential, with all options
Last date to order 55% complete
Shared ceiling 1% used
$150,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The Department of the Air Force Air National Guard awarded the NGB Fire Protection National AE IDIQ on January 19, 2024, to procure non-personal architect-engineer and construction management services for fire protection projects across the continental United States, Alaska, Hawaii, Puerto Rico, and the District of Columbia; task orders may be placed through January 18, 2029, with a shared ceiling of $150 million.

Ordering authority remains open for approximately two and a half years. The vehicle is unrestricted (no set-aside), established as a multiple-award IDIQ with a stated minimum of two awardees. Since inception, the vehicle has issued 11 task orders with combined potential value of $1.8 million, with all potential value obligated; recent ordering activity averaged 5.5 orders per year in 2024–2025, most recent award September 1, 2025. The originating solicitation projected task-order values typically between $70 thousand and $10 million for individual projects, though the portfolio to date shows much lighter utilization at substantially lower values.

Scope covers architect-engineer and construction management services including design, Title I and Title II services, fire suppression system design and repair, fire alarm system upgrades, foam tank demolition and replacement, pump house repair, and site investigation and coordination. Work is performed nationwide within the specified geographic scope.

HDR Engineering Inc. dominates the competitive field, capturing 6 of 11 orders and $1.2 million of $1.8 million in combined potential value (approximately 67 percent). Burns & Mcdonnell Engineering Company, Inc. holds 3 orders worth $629 thousand; Jensen Hughes, Inc. and Pond & Company each hold 1 order at $3 thousand. Customer concentration is moderate: the Air National Guard has placed 8 orders worth $899 thousand (roughly 50 percent), the Air Force (non-Guard) 2 orders worth $842 thousand, and Defense Finance and Accounting Service 1 order worth $94 thousand.

Task orders are issued firm-fixed-price with typical completion windows of 5–12 months. Individual ceiling values in the recent portfolio range from $2,500 (minimum guarantee orders issued at vehicle inception) to $536,834. The vehicle shows minimal utilization relative to its $150 million shared ceiling, suggesting substantial untapped capacity or limited agency demand to date.

Description

Under this IDIQ the work may include, but is not specifically limited to: the preparation of plans, specifications, calculations, and cost estimates; the development of cost management, quality control and quality assurance plans; construction inspection, testing and management services; development of engineering standards; preparations for design submissions; technical, economic, planning, environmental, value engineering and other studies, analyses, surveys, investigations, and reports; development of performance criteria for bridging documents for design build projects; development of documents to support various government construction programs.

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
The project is intended to modernize and replace base wide fire alarm panels… W50S8Q25FA018 HDR Engineering Inc. Army $470,168
Fire suppression design services for B208. W50S9G25FA013 HDR Engineering Inc. Army $305,585
Fire suppressions for ANG hangars W50S9D25FA001 Burns & Mcdonnell Engineering Company, Inc. Army $536,834
Non-personal architect-engineer (a-e) construction management (title II)… W50S7525FA022 HDR Engineering Inc. Army $97,606
Non-personal architect-engineer (a-e) construction management (title II)… W50S7525FA019 HDR Engineering Inc. Army $233,376
Minimum guarantee task order for fire suppression indefinite delivery… W9133L24F6101 HDR Engineering Inc. Readiness Center (ARNG) $0
Determine site visit time and travel REQ W50S8W24F0007 Burns & Mcdonnell Engineering Company, Inc. Army $89,990
Repair pump house B1203 - title i AE SVS W50S7524F0007 HDR Engineering Inc. Army $94,138
Minimum guarantee task order for fire suppression indefinite delivery… W9133L24F6102 Pond & Company Readiness Center (ARNG) $2,500
Minimum guarantee task order for fire suppression indefinite delivery… W9133L24F6103 Jensen Hughes, Inc. Readiness Center (ARNG) $2,500
Minimum guarantee task order for fire suppression indefinite delivery… W9133L24F6104 Burns & Mcdonnell Engineering Company, Inc. Readiness Center (ARNG) $2,500
Show all 11

Top awardees by obligations

Rank Awardee Obligated Share
1 HDR Engineering Inc. $1,200,872 65%
2 Burns & Mcdonnell Engineering Company, Inc. $629,324 34%
3 Jensen Hughes, Inc. Minimum guarantee only $2,500 <1%
4 Pond & Company Minimum guarantee only $2,500 <1%

"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Air Force $1,835,197 100%

Obligations by fiscal year

Fiscal year Obligated
FY2026 -$1,437
FY2025 $1,642,506
FY2024 $194,128

Quick answers

What is the NGB Fire Protection National AE IDIQ contract vehicle?

NGB Fire Protection National AE IDIQ is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Air National Guard (Air Force), awarded on January 19, 2024.

Which companies hold NGB Fire Protection National AE IDIQ?

4 companies hold NGB Fire Protection National AE IDIQ's IDV awards, one each. The latest went to Burns & Mcdonnell Engineering Company, Inc. on January 19, 2024. The awardees whose task orders obligated the most are HDR Engineering Inc., Burns & Mcdonnell Engineering Company, Inc. and Jensen Hughes, Inc.

How much has been spent through NGB Fire Protection National AE IDIQ?

11 task orders have been placed under NGB Fire Protection National AE IDIQ, obligating $1,835,197.

What is the shared ceiling of NGB Fire Protection National AE IDIQ?

NGB Fire Protection National AE IDIQ's shared ceiling is $150,000,000; its task orders have used 1% of it.

Which agencies use NGB Fire Protection National AE IDIQ the most?

The departments whose task orders under NGB Fire Protection National AE IDIQ obligated the most are Air Force ($1,835,197).

How much was obligated through NGB Fire Protection National AE IDIQ in fiscal year 2025?

Task orders under NGB Fire Protection National AE IDIQ obligated $1,642,506 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle