Obligated
$21,935,237

Vehicle facts

Opportunity
Agency
Combined task order value
$22,577,706 Current and potential, with all options
Last date to order 100% complete
Shared ceiling 23% used
$95,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The U.S. Army Corps of Engineers established this Master IDIQ for civil works and flood recovery construction on November 30, 2025—the vehicle's ordering deadline has now passed, and no new task orders may be placed against it. The vehicle was awarded December 1, 2020, with a shared ceiling of $95 million. Twenty-two task orders have been issued under the vehicle; the most recent award (Columbia Bottom Levee Setback to a small business contractor) was placed November 17, 2025, just before the ordering window closed. Combined task-order potential value totals $21.5 million, representing 100 percent obligation against combined potential value.

Work contracted encompasses surveying, earthwork and borrow operations, lime-treated embankment construction, water management, stone surfacing and placement, access road repairs, stone-armored protection installation, drainage structure installation and rehabilitation, relief well rehabilitation and replacement, camera inspection and slip-lining of drainage structures, and turf establishment for levee section repairs across landside, riverside, and crown sections. Task orders show firm fixed-price delivery orders with performance periods ranging from roughly one to three years; typical single-order values range from under $250 thousand to $8.1 million.

The prime contractor base is fragmented. Eagle Eye Electric LLC dominates by potential value, holding three orders worth $14.6 million combined—representing roughly 68 percent of total vehicle value. Keller Construction Inc., Gale Construction Company of Illinois, and Bloomsdale Excavating Company round out the top tier; eight additional small firms hold the remainder. Customer concentration is high: the Department of the Army Corps of Engineers (broadly defined) accounts for 21 of 22 orders worth $21.1 million combined; the Environmental Protection Agency Region 7 issued one order. The vehicle shows a mixed set-aside posture across task orders: 68 percent (15 orders) unrestricted, 32 percent (7 orders) small business set-aside. Recent small-business task orders suggest the contracting office continues to reserve work for that category despite the vehicle's unrestricted baseline.

Ordering momentum declined sharply post-2021: after an initial surge of 11 orders in 2021, issuance fell to four orders in 2022, one in 2023, and two in 2025 before the vehicle expired. Work is geographically concentrated in the Mississippi River basin and subordinate river systems under Army Corps stewardship in the St. Louis District region.

Description

All equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities associated with Civil Works and Flood Recovery Projects to include, but not limited to surveying, earthwork operations, borrow operations, lime-treated embankment operations, care of water, various stone surfacing/placement, various access road repairs, installation of stone armored protection, installation and rehabilitation of drainage structures and associated apertures, relief well rehabilitation and replacement, camera inspection & slip-lining existing drainage structures, and establishment of turf for repairs of compromised landside, riverside, and crown levee sections in accordance with both base contract and task order specific supplemental plans and specifications.

IDV awards

Show all 11

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Columbia bottom levee setback W912P926FA004 Eagle Eye Electric LLC ENDIST St Louis (USACE) $8,564,168
Cap 14 o fallon, IL, wastewater treatment plant revetment project W912P925FA044 Better By Design LLC ENDIST St Louis (USACE) $810,674
Bois brule W912P922F0163 Eagle Eye Electric LLC ENDIST St Louis (USACE) $6,525,999
MVS civil work & flood recovery MATOC W912P921F0044 Shinn Kellogg, Llc. ENDIST St Louis (USACE) $0
ST. Peters PL84-99 project W912P924F0010 Bloomsdale Excavating Company, Incorporated ENDIST St Louis (USACE) $333,568
Carlyle revetment MATOC W912P922F0180 Gale Construction Company Of Illinois ENDIST St Louis (USACE) $2,109,136
MVS civil work & flood recovery MATOC W912P921F0050 Eagle Eye Electric LLC ENDIST St Louis (USACE) $0
EPA riffle 96. Modification (base) A00003 W912P922F0208 Syte Corporation ENDIST St Louis (USACE) $418,977
MVS civil work & flood recovery MATOC W912P921F0043 Medvolt Construction Services, LLC ENDIST St Louis (USACE) $0
MVS civil work & flood recovery MATOC W912P921F0042 Magruder Construction Co Inc. ENDIST St Louis (USACE) $0
MVS civil work & flood recovery MATOC W912P921F0045 Syte Corporation ENDIST St Louis (USACE) $0
MVS civil work & flood recovery MATOC W912P921F0053 Keller Construction Inc. ENDIST St Louis (USACE) $0
MVS civil work & flood recovery MATOC W912P921F0052 Bloomsdale Excavating Company, Incorporated ENDIST St Louis (USACE) $0
MVS civil work & flood recovery MATOC W912P921F0051 Gale Construction Company Of Illinois ENDIST St Louis (USACE) $0
Augusta FY19 construction contract W912P922F0035 Keller Construction Inc. ENDIST St Louis (USACE) $859,180
Mesd PL84-99 construction contract W912P921F0203 Keller Construction Inc. ENDIST St Louis (USACE) $1,136,815
2019 darst bottom levee district repair W912P922F0017 Magruder Construction Co Inc. ENDIST St Louis (USACE) $710,543
MVS civil work & flood recovery MATOC W912P921F0075 Medvolt Construction Services, LLC ENDIST St Louis (USACE) $218,675
Kuhs levee PL84-99 repair W912P921F0080 Bloomsdale Excavating Company, Incorporated ENDIST St Louis (USACE) $246,002
MVS civil work & flood recovery MATOC W912P921F0048 Better By Design LLC ENDIST St Louis (USACE) $500
MVS civil work & flood recovery MATOC W912P921F0049 Davinroy Mechanical Contractor, Inc. ENDIST St Louis (USACE) $500
MVS civil work & flood recovery MATOC W912P921F0041 A & H-Ambica JV LLC ENDIST St Louis (USACE) $500
Show all 22

Top awardees by obligations

Rank Awardee Obligated Share
1 Eagle Eye Electric LLC $15,090,167 69%
2 Gale Construction Company Of Illinois $2,109,136 10%
3 Keller Construction Inc. $1,995,995 9%
4 Better By Design LLC $811,174 4%
5 Magruder Construction Co Inc. $710,544 3%
6 Bloomsdale Excavating Company, Incorporated $579,570 3%
7 Syte Corporation $418,977 2%
8 Medvolt Construction Services, LLC $218,675 1%
9 Davinroy Mechanical Contractor, Inc. Minimum guarantee only $500 <1%
10 A & H-Ambica JV LLC Minimum guarantee only $500 <1%

"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Army $21,516,260 98%
2 Environmental Protection Agency $418,977 2%

Obligations by fiscal year

Fiscal year Obligated
FY2026 $8,653,066
FY2025 $190,525
FY2024 $333,568
FY2023 $44,340
FY2022 $11,181,813
FY2021 $1,531,925

Quick answers

What is the MVS Civil Work and Flood Recovery contract vehicle?

MVS Civil Work and Flood Recovery is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by US Army Corps of Engineers (Department of the Army), awarded on December 1, 2020.

Which companies hold MVS Civil Work and Flood Recovery?

11 companies hold MVS Civil Work and Flood Recovery's IDV awards, one each. The latest went to Better By Design LLC on December 1, 2020. The awardees whose task orders obligated the most are Eagle Eye Electric LLC, Gale Construction Company Of Illinois and Keller Construction Inc.

How much has been spent through MVS Civil Work and Flood Recovery?

22 task orders have been placed under MVS Civil Work and Flood Recovery, obligating $21,935,237. Their combined current value, with exercised options, is $22,577,706.

What is the shared ceiling of MVS Civil Work and Flood Recovery?

MVS Civil Work and Flood Recovery's shared ceiling is $95,000,000; its task orders have used 23% of it.

Which agencies use MVS Civil Work and Flood Recovery the most?

The departments whose task orders under MVS Civil Work and Flood Recovery obligated the most are Department of the Army ($21,516,260) and Environmental Protection Agency ($418,977).

How much was obligated through MVS Civil Work and Flood Recovery in fiscal year 2025?

Task orders under MVS Civil Work and Flood Recovery obligated $190,525 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle