Mississippi River Stone Placement

Active Master IDIQ Awarded

Federal agency
Awardees
2
Task orders
4
Obligated
$7,561,887

Vehicle facts

Opportunity
Agency
Combined task order value
$7,561,887 Current and potential, with all options
Last date to order 49% complete
Shared ceiling 5% used
$150,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The Department of the Army Corps of Engineers awarded this Master IDIQ on May 16, 2024, for stone placement and river training structure construction along the Mississippi River within the Mississippi and Vicksburg Districts, with ordering authority extending through May 16, 2029.

The vehicle carries a shared ceiling of $150 million and no set-aside designation, making it available to all qualified contractors. Work encompasses furnishing plant, labor, materials, and equipment to construct dikes, chevrons, bendway weirs, hardpoints, revetments, and related structures, with production rates ranging from approximately 1,000 tons per day for truck-hauled placement to 8,000 tons per day for drag-off placement. Bank paving requires approximately 2,000 tons per day. Individual task orders specify work locations and scope; estimated duration and production requirements are established per order.

Four task orders have been issued to date, with two awarded in 2024 and two in 2025, suggesting a steady ordering cadence. Combined task-order potential value stands at $7.6 million, with all amounts obligated. Pine Bluff Sand And Gravel Company holds the largest share at $6.4 million across two orders; Luhr Crosby, LLC holds $1.2 million across two orders. The customer base splits between the Department of the Army Corps of Engineers ($1.2 million across three orders) and the Department of the Army ($6.4 million across one order). All awarded orders are competitively unrestricted.

Recent task orders include dike construction above Loosahatchie in Shelby County, Tennessee (awarded September 30, 2025, for $6.4 million, ceiling value), with completion by November 28, 2025; Wolf Island dike maintenance (awarded August 29, 2025, for $1.1 million), completion by December 30, 2025; and two MATOC minimum-guarantee orders with $30,000 ceilings each, awarded August 21, 2024, extending through May 15, 2030. Work is performed under variable river stage conditions requiring specialized equipment and operational capability.

IDV awards

Awardee IDV award Awarded
Pine Bluff Sand And Gravel Company W912EQ24D0002
Luhr Crosby, LLC W912EQ24D0003

Latest task orders

Top awardees by obligations

Rank Awardee Obligated Share
1 Pine Bluff Sand And Gravel Company $6,398,254 85%
2 Luhr Crosby, LLC $1,163,633 15%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Army $7,561,887 100%

Obligations by fiscal year

Fiscal year Obligated
FY2026 -$2,873
FY2025 $7,504,760
FY2024 $60,000

Quick answers

What is the Mississippi River Stone Placement contract vehicle?

Mississippi River Stone Placement is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by US Army Corps of Engineers (Department of the Army), awarded on May 16, 2024.

Which companies hold Mississippi River Stone Placement?

2 companies hold Mississippi River Stone Placement's IDV awards, one each. The latest went to Pine Bluff Sand And Gravel Company on May 16, 2024. The awardees whose task orders obligated the most are Pine Bluff Sand And Gravel Company and Luhr Crosby, LLC.

How much has been spent through Mississippi River Stone Placement?

4 task orders have been placed under Mississippi River Stone Placement, obligating $7,561,887.

What is the shared ceiling of Mississippi River Stone Placement?

Mississippi River Stone Placement's shared ceiling is $150,000,000; its task orders have used 5% of it.

Which agencies use Mississippi River Stone Placement the most?

The departments whose task orders under Mississippi River Stone Placement obligated the most are Department of the Army ($7,561,887).

How much was obligated through Mississippi River Stone Placement in fiscal year 2025?

Task orders under Mississippi River Stone Placement obligated $7,504,760 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle