Agency
Combined task order value
$55,842,716 Current and potential, with all options
Last date to order 39% complete
Shared ceiling 56% used
$99,500,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The U.S. Army Corps of Engineers established a Master IDIQ for the Mississippi River and Tributaries (MR&T) Mississippi River Levees (MRL) Program on October 31, 2024, with ordering authority extending through January 14, 2030. The vehicle carries a shared ceiling of $99.5 million and is unrestricted at the vehicle level, though task orders show a mixed set-aside distribution.

Ordering momentum has slowed: six task orders were awarded in 2025, followed by three in 2026 (the most recent on March 26, 2026). The combined potential value of the nine awarded task orders is $48.9 million, with $48.7 million obligated—effectively 100 percent of combined potential. This heavy obligation rate suggests limited remaining capacity under the stated shared ceiling to absorb new task orders.

Work is limited to levee enlargement, berm construction, embankment work, and related civil infrastructure repair on the Mississippi River Levee system. Task orders reflect firm fixed price contracts for compacted and semi-compacted embankment construction, drainage structure rehabilitation, and slide repair at specific levee items in Louisiana and Mississippi.

Four prime contractors hold all awarded orders. Circle, LLC dominates by potential value with $23.9 million across three orders; Affolter Contracting Company, Inc. follows with $19.4 million across two orders; Tarpan Construction, LLC holds $5.6 million across two orders; and B & K Construction Co L.l.c accounts for $5 thousand across two orders. The top two primes capture roughly 89 percent of combined potential value. Four of the nine awards are minimum guarantees of $5 thousand each (issued March 20, 2025 to each prime contractor), with the remainder representing substantial single or multiple-item contracts ranging from approximately $5.6 million to $19.4 million.

All task orders fund the Corps of Engineers Vicksburg District. The mix includes five unrestricted orders and four total small business set-aside orders. Typical durations range from 16 months to just over two years, with recent large awards completing through late 2026 and into 2028. Places of performance center on Louisiana levee systems (Tensas Parish and related segments) and Mississippi locations including the Sardis Levee.

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
MRL item 465-L slide repair W912EE26FA054 Circle, LLC ENDIST Vicksburg (USACE) $7,927,410
Task order - tensas parish, louisiana, levee enlargement and berms, items… W912EE26FA017 Circle, LLC ENDIST Vicksburg (USACE) $15,952,510
Tensas parish, LA, point pleasant-yucatan, LA, levee enlargement and berms, MRL… W912EE25FA038 Affolter Contracting Company, Inc. ENDIST Vicksburg (USACE) $19,402,996
Circle LLC MRL MATOC minimum guarantee W807PM50589577-0003 W912EE25FA029 Circle, LLC ENDIST Vicksburg (USACE) $5,000
MRL 615-L W912EE26FA040 Tarpan Construction, LLC ENDIST Vicksburg (USACE) $5,587,280
Tarpan construction LLC MATOC minimum guarantee - W807PM50589577-0004 W912EE25FA030 Tarpan Construction, LLC ENDIST Vicksburg (USACE) $5,000
Bolivar county, mississippi FC/MR and T, ebmrl seepage remediation deeson, item… W912EE26FA059 Affolter Contracting Company, Inc. ENDIST Vicksburg (USACE) $6,951,644
B K construction company LLC MRL MATOC minimum guarantee - W807PM50589577-0002 W912EE25FA028 B & K Construction Co L.l.c ENDIST Vicksburg (USACE) $5,000
MRL MATOC minimum guarantee - affolter W912EE25FA027 Affolter Contracting Company, Inc. ENDIST Vicksburg (USACE) $5,000
The USACE MVK operations division has a requirement to rehabilitate existing… W912EE25FA077 B & K Construction Co L.l.c ENDIST Vicksburg (USACE) $0

Top awardees by obligations

Rank Awardee Obligated Share
1 Affolter Contracting Company, Inc. $26,359,640 47%
2 Circle, LLC $23,884,920 43%
3 Tarpan Construction, LLC $5,592,280 10%
4 B & K Construction Co L.l.c Minimum guarantee only $5,000 <1%

"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Army $55,841,840 100%

Obligations by fiscal year

Fiscal year Obligated
FY2026 $36,560,060
FY2025 $19,281,780

Quick answers

What is the Mississippi River and Tributaries (MR&T) Mississippi River Levees (MRL) Program MATOC contract vehicle?

Mississippi River and Tributaries (MR&T) Mississippi River Levees (MRL) Program MATOC is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by US Army Corps of Engineers (Department of the Army), awarded on October 31, 2024.

Which companies hold Mississippi River and Tributaries (MR&T) Mississippi River Levees (MRL) Program MATOC?

4 companies hold Mississippi River and Tributaries (MR&T) Mississippi River Levees (MRL) Program MATOC's IDV awards, one each. The latest went to B & K Construction Co L.l.c on October 31, 2024. The awardees whose task orders obligated the most are Affolter Contracting Company, Inc., Circle, LLC and Tarpan Construction, LLC.

How much has been spent through Mississippi River and Tributaries (MR&T) Mississippi River Levees (MRL) Program MATOC?

10 task orders have been placed under Mississippi River and Tributaries (MR&T) Mississippi River Levees (MRL) Program MATOC, obligating $55,841,840. Their combined current value, with exercised options, is $55,842,716.

What is the shared ceiling of Mississippi River and Tributaries (MR&T) Mississippi River Levees (MRL) Program MATOC?

Mississippi River and Tributaries (MR&T) Mississippi River Levees (MRL) Program MATOC's shared ceiling is $99,500,000; its task orders have used 56% of it.

Which agencies use Mississippi River and Tributaries (MR&T) Mississippi River Levees (MRL) Program MATOC the most?

The departments whose task orders under Mississippi River and Tributaries (MR&T) Mississippi River Levees (MRL) Program MATOC obligated the most are Department of the Army ($55,841,840).

How much was obligated through Mississippi River and Tributaries (MR&T) Mississippi River Levees (MRL) Program MATOC in fiscal year 2025?

Task orders under Mississippi River and Tributaries (MR&T) Mississippi River Levees (MRL) Program MATOC obligated $19,281,780 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle