Metal Fabrication, Refurbishment, and Installation MATOC
Active Master IDIQ Awarded
- Federal agency
-
US Army Corps of Engineers
- Awardees
- 9 across 12 IDV awards
- Task orders
- 30
- Obligated
- $80,215,002
Vehicle facts
- Opportunity
-
- FY22 USACE LRD Various Metal Fabrication, Refurbishment, and Installation Multiple Award Task Order Contracts (MATOCs) Pre-Solicitation · W911WN22R0002 · Posted Aug 20, 2021
- Agency
-
- US Army Corps of Engineers Department of the Army, Department of Defense
- Combined task order value
-
- $80,215,002 Current, with exercised options
- $101,815,324 Potential, with all options
- Last date to order 78% complete
- Shared ceiling 50% used
- $160,000,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Department of the Army Corps of Engineers established this master IDIQ on November 21, 2022, to procure metal fabrication, refurbishment, and installation services supporting locks, dams, and related infrastructure across the Great Lakes and Ohio River Division. Ordering authority runs through November 20, 2027, leaving approximately 16 months for new task-order placement against the $160 million shared ceiling.
Activity has moderated since the vehicle's launch. The contracting office issued 14 task orders in 2022 (the initial award year), declining to 4 in 2023 and stabilizing at 6 annually in 2024 and 2025. The most recent award occurred on September 29, 2025. Of the 30 total task orders, 25 are unrestricted and 5 carry small-business set-asides. Combined potential value across all orders totals $101.8 million, with $80.2 million obligated (79% of potential), indicating a moderately active vehicle with meaningful room for additional orders before the ceiling is approached.
Competition is concentrated among a small set of established primes. G & G Steel Inc. dominates by both order count and value, holding 7 orders worth $46.2 million combined potential value. Steward Machine Co Inc. ranks second with 6 orders valued at $16.1 million, while Precision Build Solutions LLC and Marine Diving Solutions, LLC each hold 3 orders valued at $20.1 million and $14.3 million respectively. These five firms account for 77% of all orders and 99% of combined potential value; the remaining four primes hold minimal share.
Customer concentration mirrors the geographic scope of the vehicle. The Department of the Army Corps of Engineers Engineering District Louisville dominates by potential value, with 4 orders worth $52.4 million. The parent agency, Department of the Army Corps of Engineers, accounts for 21 orders valued at $17.2 million across divisions, while the Huntington District holds 1 order worth $19.1 million. Task orders typically involve fabrication and delivery of high-value lock and dam components—miter gates, emergency bulkheads, valves, and related structural steel assemblies—with firm-fixed-price terms. Recent orders show individual ceilings ranging from approximately $180,000 to $38.9 million, with durations extending to 2029 for the largest projects.
Description
Provide and deliver new metal castings, forgings or built-up steel components; heat treated steel components; stress relieved components; stainless steel overlays, hard chrome overlays, various types of bushings and bearings; precise milling, turning, grinding, planning, slotting, and other machine work; and pressure vessel manufacturing and certification. Contractor shall be capable of supplying and delivering new or refurbished existing hydraulic cylinders, strut arm spring assemblies; structural steel or aluminum fabrication; welding and bolting of structural steels, castings, and forgings; galvanized coating, vinyl painting or other approved coating systems; and other operations that are necessary to provide complete products or parts that are necessary to the operation of the locks, dams and facilities of the Districts located in the Great Lakes and Ohio River Division.
IDV awards
Show all 12
Latest task orders
Show 15 more
Latest 25 of 30 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | G & G Steel Inc. | $25,362,113 | 32% |
| 2 | Precision Build Solutions LLC | $20,129,673 | 25% |
| 3 | Steward Machine Co Inc. | $15,374,186 | 19% |
| 4 | Marine Diving Solutions, Llc. | $14,212,340 | 18% |
| 5 | Alltech Engineering Corp | $3,711,596 | 5% |
| 6 | Ahtna - J.f. Brennan JV | $885,000 | 1% |
| 7 | Oceanetics Inc. | $520,093 | 1% |
| 8 | Hohl Industrial Services Inc. | $10,000 | <1% |
| 9 | J.f. Brennan Company, Inc. | $10,000 | <1% |
"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Army | $80,215,002 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | $9,987 |
| FY2025 | $46,731,902 |
| FY2024 | $19,452,037 |
| FY2023 | $8,177,333 |
| FY2022 | $5,843,742 |
Quick answers
What is the Metal Fabrication, Refurbishment, and Installation MATOC contract vehicle?
Metal Fabrication, Refurbishment, and Installation MATOC is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by US Army Corps of Engineers (Department of the Army), awarded on November 21, 2022.
Which companies hold Metal Fabrication, Refurbishment, and Installation MATOC?
9 companies hold Metal Fabrication, Refurbishment, and Installation MATOC's 12 IDV awards. The latest went to Precision Build Solutions LLC on November 21, 2022. The awardees whose task orders obligated the most are G & G Steel Inc., Precision Build Solutions LLC and Steward Machine Co Inc.
How much has been spent through Metal Fabrication, Refurbishment, and Installation MATOC?
30 task orders have been placed under Metal Fabrication, Refurbishment, and Installation MATOC, obligating $80,215,002.
What is the shared ceiling of Metal Fabrication, Refurbishment, and Installation MATOC?
Metal Fabrication, Refurbishment, and Installation MATOC's shared ceiling is $160,000,000; its task orders have used 50% of it.
Which agencies use Metal Fabrication, Refurbishment, and Installation MATOC the most?
The departments whose task orders under Metal Fabrication, Refurbishment, and Installation MATOC obligated the most are Department of the Army ($80,215,002).
How much was obligated through Metal Fabrication, Refurbishment, and Installation MATOC in fiscal year 2025?
Task orders under Metal Fabrication, Refurbishment, and Installation MATOC obligated $46,731,902 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle