Luke AFB Construction MACC 2014-2019
Ended Master IDIQ Awarded
- Federal agency
-
Air Education and Training Command
- Awardees
- 5
- Task orders
- 51
- Obligated
- $41,786,650
Vehicle facts
- Opportunity
-
- FA488713R0005 Solicitation number
- Agency
-
- Air Education and Training Command Air Force, Department of Defense
- Combined task order value
-
- $41,786,650 Current, with exercised options
- $42,707,864 Potential, with all options
- Last date to order 100% complete
- Shared ceiling 44% used
- $95,000,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Air Force Air Education and Training Command awarded a Master IDIQ on July 28, 2014 for repair, maintenance, alteration, and replacement of real property facilities at Luke Air Force Base and subordinate locations in Arizona, with ordering closed on July 31, 2019. The vehicle is no longer active; the last task order was issued on July 29, 2019, and no new orders may be placed.
The vehicle executed 51 task orders over its five-year ordering window, generating $42.7 million in combined potential value with $41.8 million obligated (98% of capacity). Ordering momentum peaked in 2018 with 15 awards, declining to 4 in the final year. Work scope spans facility construction, renovation, and systems repair: recent orders include aircraft ground equipment fuel pad construction, underground storage tank removal, HVAC system replacement across five buildings, perimeter fence installation and repair, wastewater treatment facility improvements, building electrical and lighting upgrades, roof repairs, and interior renovations. A single competitive 8(a) award exceeded $6.3 million for fitness center renovation; most task orders cluster in the $50,000–$2.0 million range.
KWR Construction Inc. dominates the vehicle, holding 30 of 51 orders and $22.8 million of the $42.7 million combined potential value (53% by dollars). Rore, Inc., M & M, Premier Engineering Corp, and Herman Construction Group complete the prime roster with substantially smaller share. The vehicle was designed as a multiple-award vehicle with 5 total primes, concentrating work heavily with one contractor.
Air Education and Training Command sponsored 46 of 51 orders ($39.6 million), with the broader Department of the Air Force accounting for the remaining 5 orders ($3.0 million). Approximately 53% of task orders carried competitive 8(a) set-asides; 35% were unrestricted; and 12% flowed to small business contractors under total small business or partial small business designations. All task orders employed firm fixed pricing.
Work was performed at Luke Air Force Base and subordinate locations including Gila Bend AF Auxiliary Field and Fort Tuthill Recreation Area in Arizona. The vehicle reached its ordering ceiling on July 31, 2019, and is closed to new procurement activity.
Description
The 56th Contracting Squadron, Luke Air Force Base, AZ has awarded a Master IDIQ for repair, maintenance, alteration, and replacement, to include design-build, on real property facilities located at Luke AFB, AZ; Gila Bend AF Auxiliary Field, AZ (includes Barry M. Goldwater Range) and Fort Tuthill Recreation Area, Flagstaff, AZ.
IDV awards
Latest task orders
Show 15 more
Latest 25 of 51 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | KWR Construction Inc. | $22,092,749 | 53% |
| 2 | Rore, Inc. | $7,217,298 | 17% |
| 3 | M & M | $5,411,929 | 13% |
| 4 | Premier Engineering Corp | $3,933,832 | 9% |
| 5 | Herman Construction Group, Inc. | $3,130,843 | 7% |
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Air Force | $41,786,650 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2020 | $400,061 |
| FY2019 | $2,573,319 |
| FY2018 | $10,891,592 |
| FY2017 | $11,522,301 |
| FY2016 | $2,778,517 |
| FY2015 | $13,612,861 |
| FY2014 | $8,000 |
Quick answers
What is the Luke AFB Construction MACC 2014-2019 contract vehicle?
Luke AFB Construction MACC 2014-2019 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Air Education and Training Command (Air Force), awarded on July 28, 2014.
Which companies hold Luke AFB Construction MACC 2014-2019?
5 companies hold Luke AFB Construction MACC 2014-2019's IDV awards, one each. The latest went to KWR Construction Inc. on January 11, 2016. The awardees whose task orders obligated the most are KWR Construction Inc., Rore, Inc. and M & M.
How much has been spent through Luke AFB Construction MACC 2014-2019?
51 task orders have been placed under Luke AFB Construction MACC 2014-2019, obligating $41,786,650.
What is the shared ceiling of Luke AFB Construction MACC 2014-2019?
Luke AFB Construction MACC 2014-2019's shared ceiling is $95,000,000; its task orders have used 44% of it.
Which agencies use Luke AFB Construction MACC 2014-2019 the most?
The departments whose task orders under Luke AFB Construction MACC 2014-2019 obligated the most are Air Force ($41,786,650).
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle