Hybrid-Cycle Power and Thermal Management System (PTMS)

Ended Master IDIQ Awarded

Federal agency
Awardees
3
Task orders
3
Obligated
$5,780,110

Vehicle facts

Opportunity
Agency
Combined task order value
$5,780,110 Current and potential, with all options
Last date to order 100% complete
Shared ceiling 24% used
$24,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The Department of the Air Force Materiel Command Research Laboratory established a Master IDIQ on June 1, 2016, to develop hybrid-cycle power and thermal management systems for next-generation fighter aircraft. The vehicle's ordering period closed on July 14, 2021, and is no longer active for new task orders.

The vehicle contracted advanced thermal management system research and design supporting fighters requiring 10x higher power levels than current tactical aircraft. Work addressed the integration of air cycle systems and vapor cycle systems with thermal energy storage to manage extreme power demands and heat rejection challenges in contested operational environments. The scope included detailed design and development activities under cost-plus fixed-fee and cost-no-fee structures.

Three task orders were issued between June 1 and July 14, 2016, exhausting the vehicle's combined potential value of $5.8 million. All work was unrestricted competitive, with no set-asides applied. The single customer was the Air Force Research Laboratory; no other agencies participated. Three primes split the awards evenly by value: Honeywell International Inc. held one order worth $2 million, General Electric Company held one order worth $2 million, and Hamilton Sundstrand Corporation held one order worth $1.7 million. All task orders obligated their full ceiling value, indicating the vehicle funded only the initially planned scope with no expansion or follow-on work.

The vehicle is closed to new ordering and generated minimal activity—only three orders in its five-year ordering window. No ordering momentum remains, and all contractual obligations under the Master IDIQ have been satisfied. Pursuit of this vehicle is not viable; existing awardees may continue performance on their respective delivery orders if active periods remain, but new entrants cannot access the platform.

Description

Next generation fighter aircraft are likely to require an unprecedented level of advanced capabilities in order to ensure air superiority in contested environments. These capabilities, which include advanced electronic attack, high-power laser, and future low-observability features, are expected to require as much as 10x higher power levels than current tactical systems. While these power system demands are significant, thermal management of these advanced systems may present a larger concern as component efficiencies and waste heat qualities are low. Modern vehicle design factors including composite aircraft skins, higher efficiency engines, and highly embedded vehicle systems compound these challenges. Further, the duty cycles of these loads can be rather varied from continuous to less than 5% of mission duration requiring wide thermal management system (TMS) full-range to nominal operational levels. Conventional air cycle systems (ACS) offer the advantages of higher temperature lifts over comparable vapor cycle systems (VCS). However, VCS are generally 10x more efficient at moving heat, resulting in reduced heat rejection demands on vehicle thermal sinks. VCS also reduce prime power requirements, typically in the form of shaft power extraction which is more efficiently supported by the engine cycle than the bleed air driven ACS. Additionally, storage in the form of chilled fuel or other thermal energy storage mechanisms can also be used to reduce the system maximum performance requirement. As such, hybrid approaches which attempt to capitalize on the benefits of various thermal cycles while minimizing their detriments may offer significant promise for these challenging applications. Further, all potential thermal sinks including engine burn-fuel, fan bypass air, third stream air, ram-air or ACM-generated sinks may not be available over the full range of aircraft operation. The ability to selectively use available heat sinks in the most optimal way to ensure sufficient and efficient cooling over the entire vehicle flight regime is a desired capability.

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Next-generation fighter power 0001 Hamilton Sundstrand Corporation DCMA $1,738,681
Next generation fighter power and thermal management system detailed design 0001 Honeywell International Inc. AFRL $2,047,048
Next generation fighter power 0001 General Electric Company AFRL $1,994,381

Top awardees by obligations

Rank Awardee Obligated Share
1 Honeywell International Inc. $2,047,048 35%
2 General Electric Company $1,994,381 35%
3 Hamilton Sundstrand Corporation $1,738,681 30%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Air Force $5,780,110 100%

Obligations by fiscal year

Fiscal year Obligated
FY2023 -$210,583
FY2022 -$30,375
FY2017 $3,321,069
FY2016 $2,700,000

Quick answers

What is the PTMS contract vehicle?

Hybrid-Cycle Power and Thermal Management System (PTMS) is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Air Force Research Laboratory (Air Force Materiel Command), awarded on June 1, 2016.

Which companies hold PTMS?

3 companies hold PTMS's IDV awards, one each. The latest went to Honeywell International Inc. on July 14, 2016. The awardees whose task orders obligated the most are Honeywell International Inc., General Electric Company and Hamilton Sundstrand Corporation.

How much has been spent through PTMS?

3 task orders have been placed under PTMS, obligating $5,780,110.

What is the shared ceiling of PTMS?

PTMS's shared ceiling is $24,000,000; its task orders have used 24% of it.

Which agencies use PTMS the most?

The departments whose task orders under PTMS obligated the most are Air Force ($5,780,110).

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle