Holloman AFB Construction MACC 2014-2019

Ended Master IDIQ Awarded

Federal agency
Awardees
5
Task orders
65
Obligated
$98,675,576

Vehicle facts

Opportunity
  • FA480111R0003 Solicitation number
Agency
Combined task order value
$106,688,984 Current and potential, with all options
Last date to order 100% complete
Shared ceiling
$75,000,000.00 Less than its task orders have obligated

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

Air Combat Command awarded this Master IDIQ for construction projects supporting Holloman Air Force Base civil engineer requirements on April 22, 2014, with ordering authority that closed on April 21, 2019. The vehicle is no longer active—no new orders may be placed.

The portfolio executed 65 task orders over five years, with peak ordering activity in 2015 (22 orders) declining sharply thereafter to a single order in 2019. Combined potential value across all task orders reached $106.7 million, of which $98.7 million (92%) has been obligated. Task order values ranged from mobilization fees of $2,000 to major facility repairs exceeding $6 million; representative examples include $6.3 million for runway asphalt repair, $4.5 million for airfield pavement demolition, and $6.4 million for training facility building repairs. Nearly all orders carried firm fixed-price structures with durations typically 12–24 months from award to completion.

Scope centered on base infrastructure maintenance and capital repair: airfield pavement and runway repair, building renovation and demolition, electrical distribution system upgrades, HVAC and mechanical system replacement, utility lateral repair, and facility-specific work including F-16 simulator spaces, precision measurement equipment laboratories, and munitions handling facilities. All funding originated from Air Combat Command; no other agencies participated.

Three primes captured nearly all activity by value. R-Con Construction Inc. held 14 orders valued at $35.7 million combined, Mirador Enterprises Inc. held 21 orders at $33.6 million, and Mesa Verde Enterprises Inc. held 22 orders at $32.1 million. Two smaller firms (E Corp and a joint venture) split the remainder. Small business set-asides dominated the distribution—47 of 65 orders (72%) were designated small business, while 18 orders (28%) competed unrestricted. All work performed at Holloman Air Force Base, New Mexico.

Description

The 49th Contracting Squadron, Holloman AFB, NM has awarded a Master IDIQ for a wide range of construction projects in support of base Civil Engineer requirements.

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Constr. F16 armament facility FA480118F2001 Mirador Enterprises, Inc. ACC $1,368,734
RPR electrical primary distribution syst FA480118F2002 Mirador Enterprises, Inc. ACC $4,718,349
Repair/demolish bldgs 222 & 811 in accordance with basic contract statement… 0006 R-Con Construction Inc. ACC $3,883,599
Kwrd 16-0025 repair TLF buildings FA480117F4002 R-Con Construction Inc. ACC $6,414,522
Repair utility lateral west FA480118F4001 R-Con Construction Inc. ACC $2,748,254
Repair utility lateral north FA480118F4002 R-Con Construction Inc. ACC $3,295,058
Repair space for BLK40 f-16 simulators FA480117F4004 R-Con Construction Inc. ACC $3,971,023
Repair backstop bldg. 1278 FA480118F3001 Mesa Verde Enterprises Inc. ACC $654,386
Repair roads FA480119FA037 Mesa Verde Enterprises Inc. ACC $830,000
Kwrd 17-0006 repair building 1062 FA480117F4001 R-Con Construction Inc. ACC $3,224,505
RPR electrical distribution system for reliability 0007 R-Con Construction Inc. ACC $2,404,928
Repair fire water main, west ramp in accordance with the basic contract terms… FA480118F4000 R-Con Construction Inc. ACC $1,860,804
Kwrd 15-0130 repair airfield lighting FA480117F3002 Mesa Verde Enterprises Inc. ACC $2,258,413
Repair electrical primary distro FA480117F2005 Mirador Enterprises, Inc. ACC $3,100,703
Construct BAY for pmats, B513 IAW basic contract statement of work (SOW) and… FA480117F2004 Mirador Enterprises, Inc. ACC $564,713
Airfield waiver/7:1 demo 0004 Mirador Enterprises, Inc. ACC $4,507,654
Repair the engine shops in bldg. 800 & 816 FA480117F2001 Mirador Enterprises, Inc. ACC $1,019,654
Repair airfield pavement, n ramp FA480117F3003 Mesa Verde Enterprises Inc. ACC $2,823,050
Repair american bar & grill, B531 IAW the basic contract statement of work… 0014 Mirador Enterprises, Inc. ACC $463,188
Kwrd 06-0081 RPR barrier sheds, RWY 16 34 0015 Mesa Verde Enterprises Inc. ACC $2,836,744
Pmel 68 degree room - the contractor shall provide all materials, equipment and… 0008 R-Con Construction Inc. ACC $899,823
Kwrd 16-0019 RPA early turn-off taxiway 16-34 0020 Mesa Verde Enterprises Inc. ACC $841,557
Kwrd 14-0104; RPR VEH maintenance bays 0014 Mesa Verde Enterprises Inc. ACC $1,954,919
Tual 15-0112, storage facility rams 0007 E Corp ACC $730,093
Kwrd 16-0081 repair walls & carpet B29 0005 R-Con Construction Inc. ACC $507,267
Show 15 more

Latest 25 of 65 listed here. See the rest on GovTribe.

Top awardees by obligations

Rank Awardee Obligated Share
1 R-Con Construction Inc. $32,422,140 33%
2 Mesa Verde Enterprises Inc. $32,064,908 32%
3 Mirador Enterprises, Inc. $28,874,137 29%
4 E Corp $5,312,391 5%
5 Dawn, Incorporated & Mctech Corp, JV LLC $2,000 <1%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Air Force $98,675,576 100%

Obligations by fiscal year

Fiscal year Obligated
FY2021 $12,961
FY2020 $51,869
FY2019 $6,133,149
FY2018 $15,226,341
FY2017 $23,658,121
FY2016 $22,129,213
FY2015 $23,204,563
FY2014 $11,554,417

Quick answers

What is the Holloman AFB Construction MACC 2014-2019 contract vehicle?

Holloman AFB Construction MACC 2014-2019 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Air Combat Command (Air Force), awarded on April 22, 2014.

Which companies hold Holloman AFB Construction MACC 2014-2019?

5 companies hold Holloman AFB Construction MACC 2014-2019's IDV awards, one each. The latest went to Mesa Verde Enterprises Inc. on April 22, 2014. The awardees whose task orders obligated the most are R-Con Construction Inc., Mesa Verde Enterprises Inc. and Mirador Enterprises, Inc.

How much has been spent through Holloman AFB Construction MACC 2014-2019?

65 task orders have been placed under Holloman AFB Construction MACC 2014-2019, obligating $98,675,576. Their combined current value, with exercised options, is $106,688,984.

What is the shared ceiling of Holloman AFB Construction MACC 2014-2019?

The shared ceiling listed for Holloman AFB Construction MACC 2014-2019, $75,000,000, is less than its task orders have obligated.

Which agencies use Holloman AFB Construction MACC 2014-2019 the most?

The departments whose task orders under Holloman AFB Construction MACC 2014-2019 obligated the most are Air Force ($98,675,576).

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle