Hill AFB, Utah Air National Guard, and Geographically Separated Locations Paving Requirement

Active Master IDIQ Awarded

Federal agency
Awardees
3
Task orders
56
Obligated
$20,746,842

Vehicle facts

Opportunity
Agency
Combined task order value
$20,746,842 Current and potential, with all options
Last date to order 63% complete
Shared ceiling 22% used
$92,500,581.60

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The Department of the Air Force Materiel Command Air Force Sustainment Center established a Master IDIQ for pavement improvements and related services at Hill Air Force Base, Utah Air National Guard, and geographically separated locations including Little Mountain Test Annex, Utah Test and Training Range, Wendover, Duggy Proving Grounds, and facilities in Wyoming, with ordering authority extending through November 14, 2028.

The vehicle is fully set aside for small business at the vehicle level. However, actual task order awards show a mixed set-aside distribution: 49 percent are unrestricted or no-set-aside orders, 49 percent are total small business set-asides, and 2 percent are competitive 8(a). The three primes dominating execution are Brinkerhoff Excavating and Construction, Inc. (14 orders, $8.4 million), Pure Enviro-Management, LLC (22 orders, $7.5 million), and DSB Construction, LLC (11 orders, $1.5 million), collectively capturing 100 percent of awarded task orders. Brinkerhoff and Pure Enviro-Management are roughly balanced in combined value, though Pure Enviro-Management leads in order count.

Approximately 74 percent of orders by value ($13.7 million of $17.4 million combined potential value) fund Air Force Sustainment Center programs; the remainder flow to broader Air Force Materiel Command and Air National Guard accounts. All 47 task orders awarded to date have obligated their full ceiling value, totaling $17.4 million against the shared ceiling of $92.5 million. Recent ordering momentum has slowed: the vehicle averaged 15–17 orders per year in 2023–2024, dropped to 13 in 2025, and shows only one order since the vehicle's establishment (most recent award March 9, 2026).

Work is firm-fixed-price, with typical task-order values ranging from under $30,000 to $3.5 million, and performance occurs at Hill Air Force Base and subordinate geographically separated locations. Nearly all recent orders are for parking lot, concrete, asphalt, and airfield pavement repair, replacement, and removal. The vehicle carries 2 years 3 months of remaining ordering authority.

Description

The scope of this IDIQ includes a broad range of exterior/interior pavement improvements and appurtenances at Hill Air Force Base (HAFB), Utah Air National Guard Base (UTANG), areas under HAFB jurisdiction, which include, but are not limited to the following Geographically Separated Locations (GSL): Little Mountain Test Annex (LMTA), Utah Test and Training Range (UTTR - North/South Range), Wendover (UT/NV), Dugway Proving Grounds (DPG), Wendover Peak, Bovine, Trout Creek, Carter Creek, Grassy, Boulder, WY. The contractor shall plan, manage, organize, direct, schedule, and control all resources, processes, activities and tasks to accomplish each Task Order

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Repair base parking lots- construction W50S9A25FA013 Pure Enviro-Management, LLC Army $2,531,418
Hafb B965 and 980 muns bunkers. To under hafb paving IDIQ contract… FA820126F0206 Pure Enviro-Management, LLC AFSC $446,971
Canberra parking lot. To under hafb paving IDIQ contract, FA820123D0007… FA820126F0215 Pure Enviro-Management, LLC AFSC $129,506
Base pavement markings. To under hafb paving IDIQ contract, FA820123D0007… FA820126F0211 Pure Enviro-Management, LLC AFSC $356,763
1289 parking lot. To under hafb paving IDIQ contract, FA820123D0005. Contractor… FA820126F0202 Brinkerhoff Excavating And Construction, Inc. AFSC $744,744
Building 120 parking lot. To under hafb paving IDIQ contract, FA820123D0005… FA820126F0203 Pure Enviro-Management, LLC AFSC $55,637
Hafb FY26 airfield maintenance. To under hafb paving IDIQ contract… FA820126F0172 Pure Enviro-Management, LLC AFSC $516,558
Hafb B748 asphalt R and R. To under hafb paving IDIQ contract, FA820123D0005… FA820126F0156 Brinkerhoff Excavating And Construction, Inc. AFSC $824,824
Hafb B243 HMA driveway. To under hafb paving IDIQ contract, FA820123D0007… FA820126F0155 Pure Enviro-Management, LLC AFSC $55,782
Tams HMA parking lot. To under hafb paving IDIQ contract, FA820123D0005… FA820126F0085 Brinkerhoff Excavating And Construction, Inc. AFSC $211,350
B843 stair and ramp repair. To under hafb paving IDIQ contract… FA820126F0059 Brinkerhoff Excavating And Construction, Inc. AFSC $74,000
Charlie echo taxiway asphalt at hill AFB. All work shall be performed in… FA820125F0271 Pure Enviro-Management, LLC AFSC $182,558
Repair building 5 dock FA820123F0213 Brinkerhoff Excavating And Construction, Inc. AFSC $557,785
B10 tower parking lot at hill AFB. FA820125F0395 Brinkerhoff Excavating And Construction, Inc. AFSC $202,404
B953 concrete addition off the paving IDIQ at hill AFB. All work shall be… FA820125F0143 Pure Enviro-Management, LLC AFSC $409,735
B1538 smic lot at hill AFB. All work shall be performed in accordance with… FA820125F0341 Pure Enviro-Management, LLC AFSC $246,838
Dorm campus lot at hill AFB. All work shall be performed in accordance with the… FA820125F0315 Pure Enviro-Management, LLC AFSC $676,525
Pzioc/ paving IDIQ: lot 18 concrete addition at hill AFB. All work shall be… FA820125F0316 Pure Enviro-Management, LLC AFSC $113,183
B10758 build concrete pad and concrete ramp at hill AFB. All work shall be… FA820125F0312 Pure Enviro-Management, LLC AFSC $61,269
4TH and D AVE storm drain replacement. FA820125F0005 DSB Construction, LLC AFSC $645,039
B275 HMA RR C130 tow way asphalt at hill AFB. FA820125F0275 Pure Enviro-Management, LLC AFSC $70,063
Pzioc/IDIQ: B269 concrete pads at hill AFB. All work shall be performed in… FA820125F0244 Pure Enviro-Management, LLC AFSC $33,668
B270 trench drain at hill AFB. FA820125F0196 Pure Enviro-Management, LLC AFSC $140,719
Alabama hawthorne HMA asphalt remove and replace at hill AFB. Due to funding… FA820125F0122 Brinkerhoff Excavating And Construction, Inc. AFSC $677,750
Foulois M and F at hill AFB FA820125F0007 Pure Enviro-Management, LLC AFSC $1,955
Show 15 more

Latest 25 of 56 listed here. See the rest on GovTribe.

Top awardees by obligations

Rank Awardee Obligated Share
1 Brinkerhoff Excavating And Construction, Inc. $10,022,149 48%
2 Pure Enviro-Management, LLC $9,229,840 44%
3 DSB Construction, LLC $1,494,854 7%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Air Force $20,746,842 100%

Obligations by fiscal year

Fiscal year Obligated
FY2026 $3,614,916
FY2025 $6,370,968
FY2024 $6,246,539
FY2023 $4,514,419

Quick answers

What is the Hill AFB, Utah Air National Guard, and Geographically Separated Locations Paving Requirement contract vehicle?

Hill AFB, Utah Air National Guard, and Geographically Separated Locations Paving Requirement is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Air Force Sustainment Center (Air Force Materiel Command), awarded on May 15, 2023.

Which companies hold Hill AFB, Utah Air National Guard, and Geographically Separated Locations Paving Requirement?

3 companies hold Hill AFB, Utah Air National Guard, and Geographically Separated Locations Paving Requirement's IDV awards, one each. The latest went to DSB Construction, LLC on May 15, 2023. The awardees whose task orders obligated the most are Brinkerhoff Excavating And Construction, Inc., Pure Enviro-Management, LLC and DSB Construction, LLC.

How much has been spent through Hill AFB, Utah Air National Guard, and Geographically Separated Locations Paving Requirement?

56 task orders have been placed under Hill AFB, Utah Air National Guard, and Geographically Separated Locations Paving Requirement, obligating $20,746,842.

What is the shared ceiling of Hill AFB, Utah Air National Guard, and Geographically Separated Locations Paving Requirement?

Hill AFB, Utah Air National Guard, and Geographically Separated Locations Paving Requirement's shared ceiling is $92,500,582; its task orders have used 22% of it.

Which agencies use Hill AFB, Utah Air National Guard, and Geographically Separated Locations Paving Requirement the most?

The departments whose task orders under Hill AFB, Utah Air National Guard, and Geographically Separated Locations Paving Requirement obligated the most are Air Force ($20,746,842).

How much was obligated through Hill AFB, Utah Air National Guard, and Geographically Separated Locations Paving Requirement in fiscal year 2025?

Task orders under Hill AFB, Utah Air National Guard, and Geographically Separated Locations Paving Requirement obligated $6,370,968 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle