Hawaii National Guard Construction 2013-2018
Ended Master IDIQ Awarded
- Federal agency
-
Air National Guard
- Awardees
- 34
- Task orders
- 92
- Obligated
- $23,466,457
Vehicle facts
- Opportunity
-
- W912J613R0002 Solicitation number
- Agency
-
- Air National Guard Air Force, Department of Defense
- Combined task order value
- $23,466,457 Current and potential, with all options
- Last date to order 100% complete
- Shared ceiling 78% used
- $30,000,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Department of the Air Force Air National Guard established this Master IDIQ on March 22, 2013, for construction, maintenance, repair, design-build, and related services supporting Hawaii National Guard facilities, with ordering closed as of March 22, 2018. The vehicle is no longer active; no new orders may be placed.
The vehicle obligated its full combined potential value of $23.5 million across 92 task orders issued between March 2013 and September 2018. Order placement peaked in 2017 with 15 awards, declined to 12 annual awards in 2014 and 2015, dropped to 8 in 2016, and slowed to 5 in 2018 as the vehicle approached closure. Individual task-order values ranged from two hundred dollars (36 minimal awards for quality control and safety plans issued at vehicle inception) to $4.957 million for a 2018 demolition and HVAC distribution system project. A taxiway resurfacing task order awarded in September 2014 valued $2.921 million.
The awardee base spans 34 distinct primes with moderate concentration at the top. Amcee Builders, LLC leads by potential value with 9 orders totaling $7.5 million; Su-Mo Builders, Inc. and D&D Construction, Inc. follow with $4.8 million and $4 million respectively across 10 and 11 orders. These three firms together hold 83 percent of combined potential value. The remaining 31 primes captured 17 percent. About 83 percent of all orders designated Total Small Business set-asides; the remainder were unrestricted (12 percent) or set aside for single categories including competitive 8(a), HUBZone, Service-Disabled Veteran-Owned Small Business, Woman-Owned Small Business, and Economically Disadvantaged Woman-Owned Small Business (each 1 percent).
Customer concentration centered on Hawaii-based operations. The Air National Guard funded 75 orders valued at $11 million (about 47 percent of the vehicle's total potential value), while Hawaii Army National Guard funded 13 orders valued at $11.8 million. Pacific Air Forces issued 3 orders at $483 thousand, and a single unreferenced Air Force order valued $194 thousand. Work performed at Hawaii National Guard installations, including repair and maintenance at Kalaeloa, Waiawa, and Hickam facilities, emphasized building infrastructure, fire protection, HVAC, flooring, lighting, electrical systems, and airfield pavement.
Description
The Hawaii National Guard has awarded a Construction MATOC for construction projects that may include but not limited to the maintenance, repair, construction, and design build services in support of the Hawaii National Guard.
IDV awards
Show all 34
Latest task orders
Show 15 more
Latest 25 of 92 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Amcee Builders, LLC | $7,504,593 | 32% |
| 2 | Su-Mo Builders, Inc. | $4,798,459 | 20% |
| 3 | D&D Construction, Inc. | $3,987,931 | 17% |
| 4 | Talion Construction, LLC | $1,751,775 | 7% |
| 5 | BCP Construction Of Hawaii, Inc. | $1,546,849 | 7% |
| 6 | Nakasato Contracting LLC | $1,199,015 | 5% |
| 7 | Lyz, Inc. | $640,133 | 3% |
| 8 | Allied Pacific Builders Inc. | $565,842 | 2% |
| 9 | Narito Sheetmetal & Mechanical Corporation | $458,863 | 2% |
| 10 | Blackhawk-Milcon A Joint Venture | $349,548 | 1% |
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Army | $11,840,071 | 50% |
| 2 | Air Force | $11,626,386 | 50% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2021 | $52,731 |
| FY2020 | $3,316,092 |
| FY2019 | $675,639 |
| FY2018 | $3,558,242 |
| FY2017 | $3,546,646 |
| FY2016 | $2,600,296 |
| FY2015 | $3,478,762 |
| FY2014 | $5,414,802 |
| FY2013 | $823,247 |
Quick answers
What is the Hawaii National Guard Construction 2013-2018 contract vehicle?
Hawaii National Guard Construction 2013-2018 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Air National Guard (Air Force), awarded on March 22, 2013.
Which companies hold Hawaii National Guard Construction 2013-2018?
34 companies hold Hawaii National Guard Construction 2013-2018's IDV awards, one each. The latest went to Choice Sheetmetal LLC on March 22, 2013. The awardees whose task orders obligated the most are Amcee Builders, LLC, Su-Mo Builders, Inc. and D&D Construction, Inc.
How much has been spent through Hawaii National Guard Construction 2013-2018?
92 task orders have been placed under Hawaii National Guard Construction 2013-2018, obligating $23,466,457.
What is the shared ceiling of Hawaii National Guard Construction 2013-2018?
Hawaii National Guard Construction 2013-2018's shared ceiling is $30,000,000; its task orders have used 78% of it.
Which agencies use Hawaii National Guard Construction 2013-2018 the most?
The departments whose task orders under Hawaii National Guard Construction 2013-2018 obligated the most are Department of the Army ($11,840,071) and Air Force ($11,626,386).
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle