About this vehicle

The Federal Highway Administration established this Master IDIQ on May 12, 2016, with a final ordering date of August 2, 2021. The vehicle is now closed to new task-order awards.

The FHA Roadwork Architect Engineering IDIQ funded rapid-response architecture and engineering services for repetitive road construction and repair on low-volume and low-speed gravel roads across Wyoming, Colorado, Nebraska, and Kansas, with secondary activity in California, Arizona, New Mexico, Nevada, Utah, and other Western states. Work supported Air Force Space Command OMAD programs, the Refuge Road Program, the Emergency Relief for Federally Owned Roads Program, and the Forest Land Access Program. Scope included site scoping, preliminary and final design, post-design services, environmental and cultural resources studies, and construction support spanning design phases from 0–30% concept through 100% final design and permitting.

Over its five-year life, the vehicle generated 197 task orders totaling $54.8 million in combined potential value, with 100 percent of that value obligated by the final order date. Order activity peaked in 2019 and 2020 (49 and 51 orders respectively) before declining sharply in 2021 (16 orders) as the ordering period drew to a close. All task orders were awarded as unrestricted (no set-aside).

Three prime contractors dominated the vehicle. HDR Engineering, Inc. received 105 orders valued at $16.9 million combined potential; Ch2M Hill, Inc. held 87 orders valued at $18 million; Pine Bluffs Gravel & Excavating, Inc. won only 5 orders but captured $19.8 million, reflecting higher per-order values. Task-order ceilings ranged from under $1,000 to approximately $6.8 million for construction mega-orders, with typical design-phase orders ranging from $20,000 to $300,000. All 197 task orders funded Federal Highway Administration programs exclusively—no other federal agencies placed orders.

Description

CFL has a need for a rapid response road construction and repair contracting tool for repetitive 1R, 2R and 3R work on gravel roads in the Midwest and Inter-Mountain Regions. Projects primarily include improvements to low-volume and low-speed roadways. Projects may be located in environmentally sensitive areas that necessitate context-sensitive construction techniques and processes. The predominant geographic area includes Wyoming, Colorado, Nebraska and Kansas. These projects are primarily part of the Air Force Space Command OMAD program, the Refuge Road Program (RRP),) and to a lesser extent the Emergency Relief for Federally Owned Roads Program (ERFO) and the Forest Land Access Program (FLAP).

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
CA flap MRN CR107(1) muir woods road: ENV and prelim design 6982AF20F000069 Ch2M Hill, Inc. FHWA $668,458
FLH geotechnical guideline revisions: pddm-chapter 6 and geotechnical technical… 0021 HDR Engineering, Inc. FHWA $96,733
HI ftnp havo 10(98) crater rim geotech investigation geotech investigations 0029 HDR Engineering, Inc. FHWA $40,023
KS flap KIN 50(1) cheney reservoir access scoping design task order for road… 6982AF20F000068 HDR Engineering, Inc. FHWA $25,300
CA flap MRN CR107(1) muir woods road 6982AF20F000001 Ch2M Hill, Inc. FHWA $321,003
Engineering services necessary for the preparation of the plans… 6982AF18F000050 HDR Engineering, Inc. FHWA $471,532
HDR FWS joho design scoping report 0018 HDR Engineering, Inc. FHWA $43,039
Clin 00001 - 15F0 funds TX FWS anah various routes routes 010, 011, 012, 101… 6982AF20F000005 HDR Engineering, Inc. FHWA $47,210
CA ftbr MTN quarry bridge bridge improvements & CA ftbr ponderosa bridge (1)… 6982AF20F000027 HDR Engineering, Inc. FHWA $998,127
NE ftfw ftni trail (1) fort falls trail and NE ftfw vale 13(1)&100(1) auto tour… 6982AF19F000096 HDR Engineering, Inc. FHWA $156,624
Clin 00001 - K200 funds CA flap DN 511(1) klamath beach road cultural… 6982AF19F000079 HDR Engineering, Inc. FHWA $54,200
NM ftfw rimo 10(1) entrance road and parking areas scoping design services… 6982AF19F000044 HDR Engineering, Inc. FHWA $61,864
HI STP 360 hana highway bridges task order to begin environmental services… 6982AF19F000006 HDR Engineering, Inc. FHWA $2,173,664
Clin 00001 CA ftfw region 8 scoping R8 FY19 scoping for fltp projects scoping… 6982AF18F000130 HDR Engineering, Inc. FHWA $169,076
Work to be performed in accordance with the attached scope of work (SOW)… 6982AF20F000064 Ch2M Hill, Inc. FHWA $938,234
AZ flap 202(2) red cloud mine road 6982AF21F000066 Ch2M Hill, Inc. FHWA $6,424
Work to be performed in accordance with the attached scope of work (SOW)… 6982AF20F000066 Ch2M Hill, Inc. FHWA $401,438
Clin 0001 funds 83T0 6982AF20F000076 Ch2M Hill, Inc. FHWA $375,831
CA flap SCR T5(1)(2) monterey BAY sanctuary scenic trail 6982AF21F000073 Ch2M Hill, Inc. FHWA $227,975
CA ftfw modo various routes 010, 900, 901, 300 6982AF21F000001 Ch2M Hill, Inc. FHWA $115,187
CO flap PIT 82(1) brush creek parking 6982AF20F000015 Ch2M Hill, Inc. FHWA $176,950
CA flap SCR T5(2) monterey BAY sanctuary scenic trail: final design 6982AF20F000044 Ch2M Hill, Inc. FHWA $69,604
Clin 00001 - K700 funds ND ftnp thro 11(10) south unit scenic loop slide repair… 6982AF20F000009 HDR Engineering, Inc. FHWA $656,090
CA flap LA CR2N40(1) santa anita canyon road 6982AF21F000120 Ch2M Hill, Inc. FHWA $63,196
CO flap PUW16(1) nichols road post design services task order 6982AF21F000110 HDR Engineering, Inc. FHWA $33,444
Show 15 more

Latest 25 of 197 listed here. See the rest on GovTribe.

Top awardees by obligations

Rank Awardee Obligated Share
1 Pine Bluffs Gravel & Excavating, Inc. $19,816,512 36%
2 Ch2M Hill, Inc. $18,028,858 33%
3 HDR Engineering, Inc. $16,941,789 31%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of Transportation $54,787,158 100%

Obligations by fiscal year

Fiscal year Obligated
FY2025 -$91,596
FY2024 -$44,749
FY2023 -$16,757
FY2022 $372,275
FY2021 $2,187,450
FY2020 $17,576,673
FY2019 $16,545,410
FY2018 $5,950,788
FY2017 $8,853,821
FY2016 $3,453,843

Quick answers

What is the FHA Roadwork Architect Engineering IDIQ 2016-2021 contract vehicle?

FHA Roadwork Architect Engineering IDIQ 2016-2021 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Federal Highway Administration (Department of Transportation), awarded on May 12, 2016.

Which companies hold FHA Roadwork Architect Engineering IDIQ 2016-2021?

4 companies hold FHA Roadwork Architect Engineering IDIQ 2016-2021's IDV awards, one each. The latest went to American Civil Constructors LLC on August 3, 2016. The awardees whose task orders obligated the most are Pine Bluffs Gravel & Excavating, Inc., Ch2M Hill, Inc. and HDR Engineering, Inc.

How much has been spent through FHA Roadwork Architect Engineering IDIQ 2016-2021?

197 task orders have been placed under FHA Roadwork Architect Engineering IDIQ 2016-2021, obligating $54,787,158.

Which agencies use FHA Roadwork Architect Engineering IDIQ 2016-2021 the most?

The departments whose task orders under FHA Roadwork Architect Engineering IDIQ 2016-2021 obligated the most are Department of Transportation ($54,787,158).

How much was obligated through FHA Roadwork Architect Engineering IDIQ 2016-2021 in fiscal year 2025?

Task orders under FHA Roadwork Architect Engineering IDIQ 2016-2021 obligated -$91,596 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle