EPA Assessment and Watershed Protection I

Ended Master IDIQ Awarded

Federal agency
Awardees
5
Task orders
52
Obligated
$31,391,695

Vehicle facts

Opportunity
  • SOLCI1100094 Solicitation number
Agency
Combined task order value
  • $35,621,553 Current, with exercised options
  • $38,471,970 Potential, with all options
Last date to order 100% complete
Shared ceiling 29% used
$107,800,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The Environmental Protection Agency Office for Water awarded this Master IDIQ on September 28, 2012, with a shared ceiling of $107.8 million and a final ordering date of September 27, 2017—now closed. This vehicle has been succeeded by EPA Assessment and Watershed Protection II, awarded August 4, 2017.

The vehicle contracted technical support for watershed assessment, Total Maximum Daily Load (TMDL) development, water-quality monitoring, and related environmental modeling across a broad geographic scope. Task orders span nitrogen and nutrient criteria development, TMDL midpoint assessments for major river systems including the Chesapeake Bay and Mississippi River, drinking-water source protection mapping, stormwater engineering support, and data systems enhancement (ATTAINS, STORET/WQX). Geographic concentration is significant: orders funded work in the Chesapeake Bay region, Alaska, Idaho, Oregon, Washington, the Great Lakes, the Mississippi River basin, Florida, Puerto Rico, and the U.S. Virgin Islands, with regional EPA offices issuing task orders alongside the central Office for Water.

Activity has closed; the most recent task order was awarded June 14, 2017. Ordering momentum declined sharply in the vehicle's final years, from 26 orders in 2013 to just one in 2017. Of 52 total task orders, 33 were placed by EPA's Office for Water, with the remainder distributed among EPA Regions 2, 3, and 10 and the Office of Research and Development. All orders were unrestricted (no set-aside designations).

Competition is highly concentrated. Tetra Tech, Inc. holds 44 percent of awarded orders by count (23 of 52) and 60 percent of combined potential value ($23.3 million of $38.5 million). Research Triangle Institute is the second-largest prime with 12 orders and $12 million in combined potential value. The Cadmus Group LLC, Michael Baker International, Inc., and ABT Global LLC account for the remainder. Of the $38.5 million in combined potential value across all task orders, $31.4 million (82 percent) has been obligated.

Task orders were typically cost-plus-fixed-fee vehicles with durations ranging from several months to multiple years. Notable large orders include Nutrient Scientific Technical Exchange Partnership System (N-STEPS) at $7.45 million potential value, Chesapeake Bay TMDL support at $5.64 million, and ATTAINS system support at $4.5 million. Representative smaller orders ranged from tens of thousands to a few hundred thousand dollars. The vehicle is now expired and unavailable for new pursuit; past performance on this IDIQ may be relevant to competing under Assessment and Watershed Protection II.

Description

Technical Support for Assessment And Watershed Protection I

IDV awards

Awardee IDV award Awarded
ABT Global LLC EPC12051
Michael Baker International, Inc. EPC12052
Tetra Tech, Inc. EPC12055
Research Triangle Institute EPC12054
The Cadmus Group LLC EPC12053

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Technical support for assessment tmdl tracking and implementation system… 0010 Research Triangle Institute SAB $3,783,354
Task order 0008 2013 watershed academy and communications support Tetra Tech, Inc. SAB $451,431
Task order 0003 chesapeake BAY tmdl midpoint assessment and watershed… Tetra Tech, Inc. SAB $5,249,610
Caribbean total maximum daily loads (tmdls) and watershed program integration 0011 Research Triangle Institute SAB $557,125
Support for storet (storage and retrieval) and WQX (water quality exchange)… 0008 Research Triangle Institute SAB $779,350
Recovery potential screening (RPS) support 0001 The Cadmus Group LLC SAB $287,878
Technical support for load reduction models; spreadsheet tool to estimate… 0013 Tetra Tech, Inc. SAB $229,393
Application of technical approach for establishing nitrogen thresholds and… 0023 Tetra Tech, Inc. SAB $695,397
Technical support for assessment and watershed protection - effect of drought… 0021 Tetra Tech, Inc. SAB $319,815
General tmdl support for alaska, idaho, oregon and washington waters 0022 Tetra Tech, Inc. SAB $376,044
Green/duwamish watershed pollutant loading assessment 0019 Tetra Tech, Inc. SAB $316,975
Task order 0017 chesapeake BAY tmdl midpoint assessment and watershed… Tetra Tech, Inc. SAB $180,894
Task order 0015 technical support for nonpoint source outreach and communication Tetra Tech, Inc. SAB $606,256
Finalization of EPA s RE-evaluation of the wissahickon creek watershed tmdl… 0010 Tetra Tech, Inc. SAB $126,188
Technical support for mississippi river hypoxia task force 0009 Tetra Tech, Inc. SAB $444,440
Task order 002 nutrient framework technical support 0002 Tetra Tech, Inc. SAB $1,794,827
US virgin islandsbasic water quality monitoring program (usvi bwqm) and… 0002 Research Triangle Institute SAB $1,117,727
Drinking water mapping application for protecting source waters (dwmaps) task… 0006 Research Triangle Institute SAB $331,570
Nutrient scientific technical exchange partnership system(n-steps) 0004 Tetra Tech, Inc. SAB $6,822,322
Task order 0006 illinois IBI development/updating and biological condition… Tetra Tech, Inc. SAB $247,832
Technical support for assessment and watershed protection 0009 The Cadmus Group LLC SAB $34,491
General tmdl support for alaska, idaho, oregon and washington waters 0005 Tetra Tech, Inc. SAB $1,816,066
Technical support for assessment and watershed protection 0010 The Cadmus Group LLC SAB $265,390
Lake ontario watershed nutrient tmdl work (sole source 2015) 0008 The Cadmus Group LLC SAB $40,652
Nutrient framework progress assessment 0002 The Cadmus Group LLC SAB $85,765
Show 15 more

Latest 25 of 52 listed here. See the rest on GovTribe.

Top awardees by obligations

Rank Awardee Obligated Share
1 Tetra Tech, Inc. $20,834,585 66%
2 Research Triangle Institute $8,162,537 26%
3 Michael Baker International, Inc. $1,203,128 4%
4 The Cadmus Group LLC $1,123,952 4%
5 ABT Global LLC Minimum guarantee only $67,493 <1%

"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Environmental Protection Agency $31,391,695 100%

Obligations by fiscal year

Fiscal year Obligated
FY2022 -$1,046
FY2021 -$65,556
FY2020 -$171,702
FY2019 -$33,797
FY2018 $284,973
FY2017 $4,130,500
FY2016 $6,628,496
FY2015 $7,333,828
FY2014 $6,593,688
FY2013 $6,692,310

Quick answers

What is the EPA Assessment and Watershed Protection I contract vehicle?

EPA Assessment and Watershed Protection I is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Office of Water (Headquarters Offices), awarded on September 28, 2012.

Which companies hold EPA Assessment and Watershed Protection I?

5 companies hold EPA Assessment and Watershed Protection I's IDV awards, one each. The latest went to ABT Global LLC on September 28, 2012. The awardees whose task orders obligated the most are Tetra Tech, Inc., Research Triangle Institute and Michael Baker International, Inc.

How much has been spent through EPA Assessment and Watershed Protection I?

52 task orders have been placed under EPA Assessment and Watershed Protection I, obligating $31,391,695. Their combined current value, with exercised options, is $35,621,553.

What is the shared ceiling of EPA Assessment and Watershed Protection I?

EPA Assessment and Watershed Protection I's shared ceiling is $107,800,000; its task orders have used 29% of it.

Which agencies use EPA Assessment and Watershed Protection I the most?

The departments whose task orders under EPA Assessment and Watershed Protection I obligated the most are Environmental Protection Agency ($31,391,695).

What came before and after EPA Assessment and Watershed Protection I?

It was followed by EPA Assessment and Watershed Protection II.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle