Eglin AFB Telecommunications System Installation 2010-2014

Ended Master IDIQ Awarded

Federal agency
Awardees
2
Task orders
42
Obligated
$1,673,970

Vehicle facts

Opportunity
  • F1T1DH92221958 Solicitation number
Agency
Combined task order value
$1,673,970 Current and potential, with all options
Last date to order 100% complete
Shared ceiling 48% used
$3,500,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The Department of the Air Force Materiel Command Test Center awarded this Master IDIQ for Base Telecommunications System operations and maintenance services on July 23, 2010, with the last date to place orders on January 22, 2014—meaning this vehicle is no longer active and has been closed to new business for over 12 years. The ordering period was finite and exhausted; no further pursuit is viable.

The vehicle carried a combined potential value of $1.7 million across 42 task orders. All work was HUBZone set-aside, exclusively reserved for HUBZone-certified contractors. Actual scope centered on inside and outside plant cabling installations, fiber optic deployments, LAN and voice drops, and connectivity work across Eglin Air Force Base facilities. Task orders ranged from small single-building jobs (often $5,000–$30,000) to larger multi-building installations in the $100,000–$360,000 range, with durations typically 2–8 months. All task orders were firm fixed price. The combined potential value of $1.7 million has been fully obligated.

Competitive activity was dominated by two HUBZone contractors. GLC Contracting, Inc. held 28 of 42 orders and $1.3 million in combined potential value (roughly 75% of the vehicle's activity by order count and value), while Unified Communication, Inc. held the remaining 14 orders and $377 thousand. Customer concentration was equally narrow: the Department of the Air Force Materiel Command Test Center (the procuring activity itself) placed 39 of 42 orders totaling $1.2 million, with the remainder split between the Air Force Materiel Command Lifecycle Management Center at Eglin (2 orders, $427 thousand) and Army Special Operations Command (1 order, $13 thousand). Ordering momentum declined sharply in the vehicle's final years—10 orders in 2010, 15 in 2011, 11 in 2012, 5 in 2013, and just 1 in early 2014 before the window closed.

Description

The 96th Contracting Squadron at Eglin Air Force Base, Florida, has awarded a Master IDIQ for Base Telecommunications System (BTS) Operations and Maintenance Services. Requirements under this vehicle include performance based service specifications to provide for inside and outside plant installations and materials in accordance with 96 Communications Group wire specs.

IDV awards

Awardee IDV award Awarded
Unified Communication, Inc. FA282310D0009
GLC Contracting, Inc. FA282310D0008

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Base cabling installation services 0028 GLC Contracting, Inc. AFTC $66,959
Base cabling installation services 0026 GLC Contracting, Inc. AFTC $359,680
Base cabling-labor/material cost 0027 GLC Contracting, Inc. AFTC $13,416
Base cabling installation services 0015 Unified Communication, Inc. AFTC $22,219
Base cabling installation services 0025 GLC Contracting, Inc. AFTC $56,482
Base cabling installation services 0024 GLC Contracting, Inc. AFTC $28,601
Base cabling installation services 0023 GLC Contracting, Inc. AFTC $5,840
Cabling reroute duke field 0022 GLC Contracting, Inc. AFTC $57,924
Nipr/sipr lines bldg 4 0021 GLC Contracting, Inc. AFTC $94,911
Base cabling installation services 0020 GLC Contracting, Inc. AFTC $5,902
Base cabling installation services 0019 GLC Contracting, Inc. AFTC $5,863
Base cabling installation services; OY1 0013 Unified Communication, Inc. AFTC $6,495
Base cabling installation services 0018 GLC Contracting, Inc. AFTC $12,358
Base cabling installation services; OY1 0011 Unified Communication, Inc. AFTC $3,930
Install niprnet fiber to BLD 351 RM 109 0009 Unified Communication, Inc. AFTC $28,991
Bldg 1190 alarm circuit line 0017 GLC Contracting, Inc. AFTC $12,074
Install LAN and phone drops BLD 3025 0012 Unified Communication, Inc. AFTC $18,908
Nipr/sipr lines bldg 351 RM 601 0010 Unified Communication, Inc. AFTC $12,433
Provide COM/LAN capability for BLD 1380 0015 GLC Contracting, Inc. AFTC $23,535
Install 2 siprnet drops in BLD 351 0016 GLC Contracting, Inc. AFTC $4,595
Base cabling installation services; OY1 0008 Unified Communication, Inc. AFTC $119,596
Fiber CON for XR BLD 349 RM 325H 0007 Unified Communication, Inc. AFTC $7,764
Labor: installation cost 0014 GLC Contracting, Inc. AFTC $10,620
Install fiber optic to BLD 709 0013 GLC Contracting, Inc. AFTC $23,904
Install fiber connectivity to bldg 92 0012 GLC Contracting, Inc. AFTC $39,556
Show 15 more

Latest 25 of 42 listed here. See the rest on GovTribe.

Top awardees by obligations

Rank Awardee Obligated Share
1 GLC Contracting, Inc. $1,296,633 77%
2 Unified Communication, Inc. $377,337 23%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Air Force $1,660,554 99%
2 Department of the Army $13,416 1%

Obligations by fiscal year

Fiscal year Obligated
FY2014 $107,628
FY2013 $445,567
FY2012 $230,798
FY2011 $524,479
FY2010 $365,498

Quick answers

What is the Eglin AFB Telecommunications System Installation 2010-2014 contract vehicle?

Eglin AFB Telecommunications System Installation 2010-2014 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Air Force Test Center (Air Force Materiel Command), awarded on July 23, 2010.

Which companies hold Eglin AFB Telecommunications System Installation 2010-2014?

2 companies hold Eglin AFB Telecommunications System Installation 2010-2014's IDV awards, one each. The latest went to Unified Communication, Inc. on July 23, 2010. The awardees whose task orders obligated the most are GLC Contracting, Inc. and Unified Communication, Inc.

How much has been spent through Eglin AFB Telecommunications System Installation 2010-2014?

42 task orders have been placed under Eglin AFB Telecommunications System Installation 2010-2014, obligating $1,673,970.

What is the shared ceiling of Eglin AFB Telecommunications System Installation 2010-2014?

Eglin AFB Telecommunications System Installation 2010-2014's shared ceiling is $3,500,000; its task orders have used 48% of it.

Which agencies use Eglin AFB Telecommunications System Installation 2010-2014 the most?

The departments whose task orders under Eglin AFB Telecommunications System Installation 2010-2014 obligated the most are Air Force ($1,660,554) and Department of the Army ($13,416).

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle