Design-Build and Design-Bid-Build Construction for Republic of Bulgaria and Republic of North Macedonia

Ended Master IDIQ Awarded

Federal agency
Awardees
6
Task orders
14
Obligated
$23,112,554

Vehicle facts

Opportunity
Agency
Combined task order value
  • $23,293,369 Current, with exercised options
  • $23,347,451 Potential, with all options
Last date to order 100% complete
Shared ceiling 46% used
$49,950,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The Department of the Army European Command awarded this Master IDIQ on July 17, 2020, for design-build and design-bid-build construction, utility work, and environmental remediation in Bulgaria and North Macedonia; the vehicle closed to new orders on July 16, 2025.

The vehicle is fully obligated and inactive. Of the $49.95 million shared ceiling, task orders worth $23.3 million combined potential value were awarded across 14 delivery orders. Combined task-order dollars obligated total $23.1 million (99% of combined potential value), with the final order placed in September 2025. Ordering momentum declined sharply after 2023: one order in 2024 and one in 2025, compared to two per year in 2022 and 2023. The vehicle is no longer accepting new orders.

Scope spans military construction at U.S. bases in Bulgaria, including squadron operations facilities, fighter ramp extensions, ammunition storage, maintenance warehouses, water filtration systems, fire alarm systems, training ranges, and training-aids simulators. All work is firm fixed price with no set-aside designations.

Competition is highly concentrated. Zafer Taahhut Insaat VE Ticaret Anonim Sirketi and SKE SRL hold 11 of 14 orders ($18.9 million of $23.3 million combined potential value, or 81%). Zafer Taahhut leads with 4 orders valued at $12.1 million. Serka Taahhut Insaat Anonim Sirketi accounts for 3 orders at $4.5 million. The remaining two primes (Framaco International Inc. and Bryan 77 Construction JV, LLC) each hold one order at $3 thousand. Customer concentration is similarly high: Department of the Army European Command placed 11 orders worth $15.7 million (67% of combined potential value). The Department of the Army Corps of Engineers Engineering District Europe placed 2 orders at $6.1 million, and Installation Management Command Europe Region placed 1 at $1.5 million. Individual delivery orders ranged from $3 thousand (minimum guarantees) to $6.1 million for the fighter ramp extension awarded in September 2024. Most substantive orders carried performance periods of 12–24 months.

Description

New construction, design-build, general building renovation, road and pavement repair, utility work to include water, sewer, electrical and gas and general environmental work including, but not limited to, incidental minor construction, excavation, plumbing, demolition, electrical, structural, mechanical, concrete work, and environmental remedial work.

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Deisign & construct urban assault course stations 4 & 5 W912GB21F0262 Serka Taahhut Insaat Anonim Sirketi USAREUR $859,563
Sofa: bulgaria / N. Macedonia MATOC min guarantee W912GB20F0177 Sociedad Espanola De Montajes Industriales SA USAREUR $0
Sofa: bulgaria / N. Macedonia MATOC min guarantee W912GB20F0176 Framaco International Inc. USAREUR $0
New task order under the FY20 design-build (DB) and design-bid-build (DBB)… W912GB25FA002 SKE SRL USAREUR $4,318,997
Sofa: bulgaria / N. Macedonia MATOC min guarantee W912GB20F0180 Zafer Taahhut Insaat VE Ticaret Anonim Sirketi USAREUR $0
Sofa: bulgaria / N. Macedonia MATOC min guarantee W912GB20F0178 Serka Taahhut Insaat Anonim Sirketi USAREUR $0
Sofa: bulgaria / N. Macedonia MATOC min guarantee W912GB20F0179 SKE SRL USAREUR $0
Construct facility maintenance warehouse W912GB23F0215 SKE SRL USAREUR $1,819,365
Sofa design and construct new training aids devices simulator and simulations… W912GB20F0447 Serka Taahhut Insaat Anonim Sirketi USAREUR $3,377,011
Construction of a fighter ramp extension W912GB24F0169 Zafer Taahhut Insaat VE Ticaret Anonim Sirketi USAREUR $6,069,053
Construction of a field ammunition W912GB23F0207 Zafer Taahhut Insaat VE Ticaret Anonim Sirketi USAREUR $4,519,497
Construction of water filtration system W912GB22F0421 SKE SRL USAREUR $664,191
FY22 nsta repair base fire alarm system W912GB22F0307 Zafer Taahhut Insaat VE Ticaret Anonim Sirketi USAREUR $1,481,879
Sofa: bulgaria / N. Macedonia MATOC min G W912GB20F0175 Bryan 77 Construction JV, LLC USAREUR $3,000
Show all 14

Top awardees by obligations

Rank Awardee Obligated Share
1 Zafer Taahhut Insaat VE Ticaret Anonim Sirketi $12,070,429 52%
2 SKE SRL $6,802,552 29%
3 Serka Taahhut Insaat Anonim Sirketi $4,236,573 18%
4 Bryan 77 Construction JV, LLC $3,000 <1%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Army $23,112,554 100%

Obligations by fiscal year

Fiscal year Obligated
FY2026 -$6,835
FY2025 $4,483,005
FY2024 $6,224,748
FY2023 $6,360,865
FY2022 $2,146,083
FY2021 $798,619
FY2020 $3,280,885

Quick answers

What is the Design-Build and Design-Bid-Build Construction for Republic of Bulgaria and Republic of North Macedonia contract vehicle?

Design-Build and Design-Bid-Build Construction for Republic of Bulgaria and Republic of North Macedonia is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Army European Command (Department of the Army), awarded on July 17, 2020.

Which companies hold Design-Build and Design-Bid-Build Construction for Republic of Bulgaria and Republic of North Macedonia?

6 companies hold Design-Build and Design-Bid-Build Construction for Republic of Bulgaria and Republic of North Macedonia's IDV awards, one each. The latest went to SKE SRL on July 17, 2020. The awardees whose task orders obligated the most are Zafer Taahhut Insaat VE Ticaret Anonim Sirketi, SKE SRL and Serka Taahhut Insaat Anonim Sirketi.

How much has been spent through Design-Build and Design-Bid-Build Construction for Republic of Bulgaria and Republic of North Macedonia?

14 task orders have been placed under Design-Build and Design-Bid-Build Construction for Republic of Bulgaria and Republic of North Macedonia, obligating $23,112,554. Their combined current value, with exercised options, is $23,293,369.

What is the shared ceiling of Design-Build and Design-Bid-Build Construction for Republic of Bulgaria and Republic of North Macedonia?

Design-Build and Design-Bid-Build Construction for Republic of Bulgaria and Republic of North Macedonia's shared ceiling is $49,950,000; its task orders have used 46% of it.

Which agencies use Design-Build and Design-Bid-Build Construction for Republic of Bulgaria and Republic of North Macedonia the most?

The departments whose task orders under Design-Build and Design-Bid-Build Construction for Republic of Bulgaria and Republic of North Macedonia obligated the most are Department of the Army ($23,112,554).

How much was obligated through Design-Build and Design-Bid-Build Construction for Republic of Bulgaria and Republic of North Macedonia in fiscal year 2025?

Task orders under Design-Build and Design-Bid-Build Construction for Republic of Bulgaria and Republic of North Macedonia obligated $4,483,005 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle