About this vehicle

The U.S. Army Corps of Engineers awarded a Master IDIQ on September 27, 2022 for design bid build marine-based construction services to government installations within the Huntington and Pittsburgh River Districts of the Great Lakes and Ohio River Division, with ordering authority extending through September 26, 2027. The vehicle carries a shared ceiling of $75 million and was established as an unrestricted five-award IDIQ with a one-year base period and four one-year option periods.

Ordering remains active with approximately 14 months of authority remaining. The vehicle has obligated $32.6 million of its $32.9 million combined task-order potential value across 13 task orders awarded since September 2022, with recent ordering momentum declining to a single order in 2025 after peaks of five orders in 2024 and four in 2022. C.J. Mahan Construction Company, LLC dominates the vehicle, holding seven orders valued at $21 million combined potential value, roughly 64 percent of all awards. Brayman Construction Corp holds the remaining material share with four orders totaling $11.9 million; two smaller firms each hold a single $20,000 guaranteed-minimum order.

Scope centers on locks and dams maintenance, repair, and rehabilitation across the navigable inland waterway system. Recent large orders include emergency miter gate sill repairs at Captain Anthony Meldahl Lock and Dam ($7.95 million), lock chamber dewatering work at an unspecified location ($5.98 million obligated against a $6.12 million ceiling), and miter gate removal and repair at Green River ($5.22 million ceiling). Smaller orders address mooring cell removal, anchor point buoy replacement, and towboat rental services. All work requires firm fixed-price contracting. Contractors must demonstrate capability to mobilize crews to multiple job sites concurrently, maintain emergency 24-hour response readiness, and provide multimillion-dollar bonding capacity.

All 13 task orders are unrestricted with no set-aside designations. Customer concentration is split between the Army Corps of Engineers (nine orders, $12.6 million combined potential) and the Louisville Engineering District (four orders, $20.4 million combined potential). Performance spans the Huntington, Louisville, Nashville, and Pittsburgh districts.

Description

The primary objective of this IDIQ is to provide site survey, work plan(s) and/or specifications, construction, maintenance, repair, and/or rehabilitation (MRR) services to Government installations and facilities located within the geographical boundaries of the Rivers Districts (Huntington and Pittsburgh) locations of the Great Lakes and Ohio River Division, U.S. Army Corps of Engineers.

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Markland locks and DAM lines shaft repair. W912QR23F0439 C.j. Mahan Construction Company, LLC ENDIST Louisville (USACE) $2,941,707
The contractor must furnish all personnel, equipment, supplies, and materials… W9123726FA140 Brayman Construction Corp ENDIST Huntington (USACE) $13,942,157
Remove and repair miter gates at green river W912QR24F0320 C.j. Mahan Construction Company, LLC ENDIST Louisville (USACE) $5,179,181
Dewater lock chamber W912QR24F0271 C.j. Mahan Construction Company, LLC ENDIST Louisville (USACE) $5,979,428
Markland R45 repair W912QR23F0418 C.j. Mahan Construction Company, LLC ENDIST Louisville (USACE) $5,963,867
Cam auxiliary emergency gate sill post-tensioned rock anchors (phase i) W9123725F0086 Brayman Construction Corp ENDIST Huntington (USACE) $7,953,075
AR2 anchor point buoy replacement project W911WN25F5004 Brayman Construction Corp ENDIST Pittsburgh (USACE) $227,000
Towboat rental for the medium capacity fleet, pittsbugh, PA> W9123725F0027 C.j. Mahan Construction Company, LLC ENDIST Huntington (USACE) $173,100
Kentucky lock upstream mooring cell #3 removal W912P525F0007 C.j. Mahan Construction Company, LLC ENDIST Nashville (USACE) $474,500
UCA letter contract for the emergency miter gate sill repairs for captain… W9123724F0047 Brayman Construction Corp ENDIST Huntington (USACE) $3,652,994
Guaranteed amount for contract W9123722D0030 W9123722F0367 C.j. Mahan Construction Company, LLC ENDIST Huntington (USACE) $20,000
Guaranteed amount for contract W9123722D0029 W9123722F0366 Brayman Construction Corp ENDIST Huntington (USACE) $20,000
Guaranteed amount for contract W9123722D0027 W9123722F0364 Aleut Flood Management, LLC ENDIST Huntington (USACE) $20,000
Guaranteed amount for contract W9123722D0028 W9123722F0365 Amherst Madison, Inc. ENDIST Huntington (USACE) $20,000
Show all 14

Top awardees by obligations

Rank Awardee Obligated Share
1 Brayman Construction Corp $25,795,226 55%
2 C.j. Mahan Construction Company, LLC $20,731,782 45%
3 Amherst Madison, Inc. $20,000 <1%
4 Aleut Flood Management, LLC $20,000 <1%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Army $46,567,008 100%

Obligations by fiscal year

Fiscal year Obligated
FY2026 $14,671,601
FY2025 $10,110,434
FY2024 $13,540,224
FY2023 $8,164,750
FY2022 $80,000

Quick answers

What is the Design Bid Build Marine Based Construction for LRD River Districts contract vehicle?

Design Bid Build Marine Based Construction for LRD River Districts is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by US Army Corps of Engineers (Department of the Army), awarded on September 27, 2022.

Which companies hold Design Bid Build Marine Based Construction for LRD River Districts?

4 companies hold Design Bid Build Marine Based Construction for LRD River Districts's IDV awards, one each. The latest went to Brayman Construction Corp on September 27, 2022. The awardees whose task orders obligated the most are Brayman Construction Corp, C.j. Mahan Construction Company, LLC and Amherst Madison, Inc.

How much has been spent through Design Bid Build Marine Based Construction for LRD River Districts?

14 task orders have been placed under Design Bid Build Marine Based Construction for LRD River Districts, obligating $46,567,008. Their combined current value, with exercised options, is $46,665,308.

What is the shared ceiling of Design Bid Build Marine Based Construction for LRD River Districts?

Design Bid Build Marine Based Construction for LRD River Districts's shared ceiling is $75,000,000; its task orders have used 62% of it.

Which agencies use Design Bid Build Marine Based Construction for LRD River Districts the most?

The departments whose task orders under Design Bid Build Marine Based Construction for LRD River Districts obligated the most are Department of the Army ($46,567,008).

How much was obligated through Design Bid Build Marine Based Construction for LRD River Districts in fiscal year 2025?

Task orders under Design Bid Build Marine Based Construction for LRD River Districts obligated $10,110,434 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle